ML20009F974
| ML20009F974 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/23/1981 |
| From: | Poole D FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8108030210 | |
| Download: ML20009F974 (1) | |
Text
_ _ _ _ - _ _ _ _ _ _
i I
M q 1 ' LEJ]>y TELECOP'l July 23, 1961 O
/q O'Reilly, Director Y,
f,Q dg
" h, Mr. J. P.
U.S. Nuclear Regulatory Commission
- f. JUL 3 li9BP'hgt Office of Inspection & Enforcement 2
Suite 3100 101 11arietta St.,
Atlanta, GA 30303
' ' u s.to E "'
- q So*
Docker 50-302
]
Licecaee DPR-72 W
R*.:
x gr/
.fic at 0918 to P. J. Kellogg of your-
'Ihis will confirm a report July 23, 1981 following end-of-during power escalation Calculations, At 1225 on July 22, 1081 l
cycle control rod withdrawal, SP-312. Heat Ba ance(5, 6, 7, & 8) were less m indicated that all NI's an amount exceeding 0.82.
- naintained g
Contrary to Technical Specification 3.0.3, the plant was tion was re-in a steady state cond3* ion while nuclear instrumenta
~#'
calibrated (SP-113).
lt of this event.
There was no effect upon the generai'public as a resu (14) days.
ithin fourteen A detailed report of this event vul f ollow w OY D. C. Poole Nuclear P3 ant Manager Florida Power Corporation REGIONA DIRECTCR Crystal River, nerid DE D RECTCR DIRECTOR, RRPl DIRECTOR, EPCSDRECT
/re OpF\\CE9 E
C AFFAI b L,)
8108030210 e10723 gDRADOCK05000 g
3
-