ML20210U541

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3
ML20210U541
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/30/1999
From: Haines P
FLORIDA POWER CORP.
To:
Shared Package
ML20210U530 List:
References
NUDOCS 9908200159
Download: ML20210U541 (1)


Text

F APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE July 2,1999 COMPLETED BY P. G. Haines TELEPHONE (352) 795-6486 x3106 REPORTING PERIOD (Month / Year): June 1999 MONTH YEAR TO DATE CUMULATIVE 1 DESIGN ELECTRICAL RATING (MWo-Net) 825 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 818 l

~

1 3 NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,343.0 129,668 4 NUMBER OF HOURS THE GENERATOR WAS ON 720.0 4,343.0 127,450 5 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0 l 6 NET ELECTRICAL ENERGY GENERATED (MWH) 601,536 3,644,233 97.528,485 l l l

l l

9908200159 990813 PDR ADOCK 05000302 R PDR