ML19210D124

From kanterella
Revision as of 04:05, 15 August 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for June 1978
ML19210D124
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200558
Download: ML19210D124 (2)


Text

..!..VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June YEAR 1978 (Revised 11-05-79)

SUBMITTED:

hD dLut>D__._

SUPERIffENDENT - OPERATIONS APPROVED: ,R 1367 292 19nn oo 5M

_.- . - _ - -

4.i b OPERATING DATA REPORT DATE 11-5 74 CO51PLETED BY u _ p PNIison TELEPHONE .700 Ro4-5151 OPERATING STATUS florth Anna Unit 1 Notes Commercial

1. Unit Name:

une, M (Revised)

2. Reporting Period:

,_6-6-78 0001 3.. Licensed Thermal Power (31Wt):

2775 , 947'4. NamepLte Rating (Gross 51We):

907 5. Design Electrical Rating (Net SIWE):

920 6. 51aximum Dependable Capacity (Gross 51We):

893 7. Sf aximum Dependable Capacity (Net 51We):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason 3:

N/A , 9. Power Level To which Restricted,if Any (Net 51We):

fl/A 10. Reasons For Restri..tions. If Any:

N/A This Stonth Yr..to.Date Cumulative 600 600 600 11. Hours in Reporting Period 69.1 597.1 597.I 12. Number Of Ilours Reactor Was Critical 2.9 2.9 2.9 13. Reactor Reserve Shutdown Hours 596.2 596.2 596.2 14. liours Generator On4.Ine

15. Unit Reserve Shutdown Hours 0 0 0 16. Gmss Thermal Energy Generated (51WH) 1,482,537 1482.537 1.482.537 17. Gros. Electrical Energy Generated (51WH) 480,915_ _ .480.915 480,915 18. Net E!tetrical Energy Generated (SiWH) 449,108 449,108 449,108 99.4 99.4 99.4 19. Unit Service Factor 99 4 99 4 99.4 20. Unit Availability Factor 83.4 83.4 83.4 21. Unit Capacity Factor (Using 5f DC Net) 82.b 82.5 82.5 22. Unit Capac'ty Factor (Using DER Net)

U6 0.6 0.6 23. Unit F(,rced Outage Rate

'24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eacht:

Maintenance, August 1-8, 1978 (7 Days)25. If Shut Down At End Of Report Period. Estimated Date of Startup:

20. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed 4-5-78 0716.INITIAL CRITICALITY 4-1/-78 2208 INITIAL ELECTRICITY C05131ERCIAL GetRATION g._g_78 0001 1367'293-(0/77 )