MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
.. . . . . _ _ _ _ _ _ _ _ _ _ - _ _
l I
VIRGINIA EI.ncUtIC AND Powen Co>f PANY RictixoNu, VIRGINIA 20261 l
l January 10, 1996 l
U. S. Nuclear Regulatory Commission Serial No.96-010 Attention: Document Control Desk NL&OS/JHL/ CMC Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINlA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the December 1995 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, M. L. Bowling, Manager Nuclear-Licensing and Operations Support Enclosure i
cc: U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW l Suite 2900 1 Atlanta, GA 30323 I i.gr. R. D. McWhorter i NRC Senior Resident inspector North Anna Power Station '
17zeyb g9 9601170217 951231 PDR ADOCK 05000330 gi R PDR \
. - - _ - . . . - = . - . - . - . - . -. . . - . _
< n I !
i 4
i 1
4 i
.i
't i
I VIRGIN 1.1 POWER COMPANY NORTH ANNA POWER STATION j
- MONTHLY OPERATING REPORT l- l 4
I MONTH: December YEAR: 1995 f
4 T
T 4
Approved:
J p stauon sanager 2
l OPERATING DATA REPORT DOCKET No.: 50-338 DATE: January 5,1996 CONTACT: J. A. Stall PHONE: (540) 894-2101 OPERATING STATUS
- 1. Un i t N ame r . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N o r t h Anna 1
- 2. Reporting Period:......................... December 1995-
- 3. L icensed Thermal Power (MWt ): . . . . . . . . . . . . . 2,893
- 4. N ameplate Rating (Gross MWe): . . . . . . . . . . . . . 994
- 5. D sign Electrical Rating (Net MWe):....... 907
- 6. Maximum Dependable capacity (Gross MWe):.. 940
- 7. M2ximum Dependable Capacity (Net MWe):.... 893
- 8. If changes occu.- in capacity Ratings (Items No. 3 thru 7) since last report, give reasons: ____N/A l l
l l
l
- 9. Power level to which restricted, if any (Net MWe): ____N/A
- 10. Reasons for restrictions, if any: N/A l l
l 1
l This Month Y-t-D Cumulative
'1 I
- 11. H ours i n R epor t i ng Pe r i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 744.0 8,760.0 153,636.0 l
- 12. Number of Hours Reactor was Critical...................... 744.0 8, 738.6 117,186.4 l
- 13. Rsactor Reserve Shutdown Hours...................... ..... 0.0 20.9 6,951.4
- 14. Hours Generator 0n-Line................................... 744.0 8,733.8 114,187.5
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)...................... 2,084,982.1 25,128,157.2 305,313,737.1
- 17. Gross Electrical Energy Generated (MWH)................... 682,434.0 8,242,715.0 100,318,335.0 j
- 18. Het Electrical Energy Gener ,J (MWH)..................... 648,964.0 7,838,868.0 95,041,154.0 l
- 19. Unit Service Factor......... ............................ 100.0% 99.7% 74.3%
- 20. Unit Availability Factor.................................. 100.0% 99.7% 74.3%
- 21. Uni t Capaci ty Factor (using MDC Ne t ) . . . . . . . . . . . . . . . . . . . . . . 97.7% 99.8% 69.2%
- 22. Unit Capacity Factor (using DER Net)...................... 96.2% 98.7% 68.2%
- 23. Forced Outage Rate........................................ 0.0% 0.3% 9.3%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_ Refueling Outage Scheduled for February 10, 1996, Duration 29 Days
- 25. If Shutdown at end of Report Period, estimated time of Startup: _N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
,,, -.. - ,+,,-4 e ,,. < , , , e c - .-
w .-.
4 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 3 Unit: NA-3 Date: January 5, 1996 i Contact J. A. Stall Phone: (540) 894-2101 i
)
}
l MONTH: December 1995 i DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 894 17 879 l 2 901 18 877 3 901 19 873 4 901 20 871 5 900 21 868 6 900 22 856 4 7 900 23 838 8 900 24 838 d 9 901 25 835 10 900 26 832 .
11 900 27 829 {
12 900 28 826 j 13 899 29 814 !
14 899 30 806 15 899 31 804 ;
16 896 j l
1 i
i Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, compute to the nearest whole megawatt.
l l
NORTH ANNA POWER STATION l
UNIT-NO.: 1 MONTH: December
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data December 01, 1995 0000 Began month with unit at 100% power, 944 MWe, '
1125 Commenced ramp from 100% power, 944 MWe to perform Turbine Valve Freedom Test (TVFT).
1210 Unit stable at 91% power, 870 MWe, 1258 TVFT completed satisfactorily.
1313 Commenced unit ramp to 100% power from 915 power, 867 MWe.
1419 Unit stable at 100% power, 945 MWe.
December 15, 1995 1500 Commenced End of Life coastdown for February l 1996 Refueling Outage. j December 31, 1995 2400 Ended month with unit at 89.4% power, 849 MWe, i Several small unit ramp-downs (<5% power each) have occurred during this month to match Tave and Tref during end-of-cycle coastdown and are not individually recorded in this report.
l
_ .. .__ __ ..-.__=.___m _ . . . _ _ . . . . . . _ . . . _ _ ~ _ . _ _ _ _ _ , _ _ . . . _ _ _ _ _ . . - . _ _ _ _ . . _ . _ . _ . _ _ . . . _ _ _ _ _
d 4
1 i
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-338 Report Month December Unit Name: NA-1 Year: 1995 Date: Januarv 5, 1996
Contact:
J. A. Stall
1 1
I a
l i
1 l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-338 UNIT NAME: NA-1 DATE: January 5, 1996 REPORT MONTH: December 1995 CONTACT: J. A. Stall PHONE: (540) 894-2101 1
1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence o No Entry This Month i 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F- Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source s
i .. .
s OPERATING DATA REPc4T
. a.
- DOCKET NO. 50-339
- DATE
- January 5, 1996 CONTACT: J. A. Statt
- PHONE
- (540) 894 2101 1
OPERATING STATUS s
1 A
l
- 1. Un i t N ame
- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N o r t h Anna 2 l
- 2. Reporting Period
- ......................... December 1995 '
7
- 3. Licensed Thermal Power (MWt):............. 2893 l
- 4. Nameplate Rating (Gross MWe):............. 979 j 5. Ossign Electrical Rating (Net MWe):....... 907
- 6. MJtXimun Dependable Capacity (Gross MWe):.. 944
- 7. MIximun Deperuste Capacity (Net MWe):.... 897 i
4
- 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since test report, give reasons: N/A i l
1 1 n
1
- 9. Power Level to which restricted, if any (Net MWe): _ N/A
- 10. Raasons for restrictions, if any: N/A This Month Y*t-D Cumulative
- 11. Hours in Reporting Period................................. 744.0 8,760.0 131,904.0
- 12. Nunber o f Hours Reac tor was Cri t i ca l . . . . . . . . . . . . . . . . . . . . . . 744.0 7,124.1 110,057.6
- 13. Reactor Reserve Shutdown Hours............................ 0.0 26.1 6,535.0 1
- 14. Hours Generator 0n-Line................................... 744.0 7,087.4 108,923.1
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) ..................... 2,150,951.2 19,361,274.7 295,977,238.7
- 17. Gross Elect rical Energy Generated (MWH) . . . . . . . . . . . . . . . . . . . 709,995.0 6,354,561.0 96,831,418.0
- 18. Nst Electrical Energy Generated (MWH)..................... 676,339.0 6,031,671.0 92,571,639.0
- 19. Unit Service Factor....................................... 100.0% 80.9% 82.6%
- 20. Unit Availability Factor.................................. 100.0% 80.9% 82.6%
- 21. Unit capacity Factor (using MDC Net)...................... 101.3% 77.2% 78.0%
- 22. Unit Capacity Factor (using DER Net)...................... 100.2% 75.9% 77.4%
- 23. Forced Outage Rate........................................ 0.0% 0,4% 4.9%
l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A I
i l
1
- 25. If Shutdown at end of Report Period, estimated time of Startup: N/A
- 26. Units in Test Status (Prior to comercial Operation):
Forecast Achieved 1
INITIAL CRITICALITY 1
INITIAL ELECTRICITY l'
COMMERCIAL OPERATION I
J
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit: NA-2 Date: Januarv 5, 1996 Contact J. A. Stall Phone: (540) 894-2101 MONTH: December 1995 i
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER j LEVEL (MWe-Net) LEVEL (MWo-Net) 1 911 17 907 i 2 911 18 909 3 911 19 910 4 911 20 912 l 5 910 21 912 6 910 22 910 i 7 909 23 911 l 8 909 24 911 l 9 901 25 912 i 10 911 26 912 11 910 27 910 l 12 910 28 908 f 13 909 29 908 !
14 909 30 908 15 893 31 908 16 907 !
l i
l Instructions:
On this format, list the average daily unit power level in MWe- l Net for each day in the reporting month. Compute to the nearest ,
whole megawatt. l l
NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: December
SUMMARY
OF OPERA'IING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating j experiences for this month which required load reductions or resulted in l significant non-load related incidents.
Date Time Data December 01, 1995 0000 Began month with unit stable at 100% power, 955 MWe, December 08, 1995 2320 Commenced rampimg unit from 100% power, 953 MWe l to allow removal of 2-FW-E-1B relief valve. l December 09, 1995 0100 Unit stable at 99% power, 935 MWe, I 1347 Feedwater heater, 2-FW-E-1B, returned to service. Commenced ramp to 100% power.
1400 Unit stable at 100% power, 954 MWe.
! December 15, 1995 0907 Commenced ramping unit from 100% power, 953 MWe
] for Turbine valve Freedom Test (TVFT).
0940 Unit stable at 90% power, 855 MWe.
1046 TVFT Completed satisfactorily.
l 1324 Commenced ramping unit from 90% pcwer, 871 MWe to 100% power.
1441 Unit stable at 100% power, 953 MWe.
December 31, 1995 2400 Ended month with unit stable at 100% power, 957 Mwe.
t 1
4 1
]
1 i
Page 1 of 1 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet I i
1 Docket No.: 50-339 l I
Report Month December Unit Name: NA-2 !
Year: 1995 Date: Januarv 5, 1996
Contact:
J. A. Stall 1
l l
l l
c i
i a
]
f i
r l
4
DOCKET NO.: 50-339 UNIT NAME: NA-2 DATE: January 5, 1996 REPORT MONTH: December 1995 CONTACT: J. A. Stall PHONE: (540) 894-2101 1 2 3 4 5
, No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence
- No Entry This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F- Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F=Adulinistrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source o
.