Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2
ML20135F311
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/28/1997
From: Matthews W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
97-144, NUDOCS 9703120038
Download: ML20135F311 (12)


Text

.-

=_

s VIRGINIA ELecTurc AND Pownn COMPANY Racirwown,V!HOINIA 20261 l

March 4,1997 h

l United States Nuclear Regulatory Commission Serial No.97-144 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the February 1997 Monthly Operating Report for North Anna Power Station Unit 1 and 2.

Very truly yours, UGi W. R. Matthews Station Manager Enclosure cc:

U. S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 h

/

Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 9703120038 970228 PDR ADOCK 05000338 R

PDR

,N

~

~-

d e

d 4

VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT a

i MONTH: Februarv YEAR:

1997 Approved:

W k.l2Y Station Manager l

l

)

CP RATIN3 DATA REPIRT DOCKET NO. :

50-334 DATE: March 5, 1997 CONTACT:

W. R. Matthews PHONE:

(540) 894-2101 OPERATING STATUS 1.

Uni t N4me r..

North Anna 1 2.

Reporting Periods..

February 1997 3.

Licensed Thermal Puwer (Mwt).......

2,893 4.

Nameplate Rating (Gross MHv) n.

994 S.

Design Electrical Rating (Net HHoli..

907 i

6.

Maximum Dependable capacity (Gross MWe)..

940 7.

Maximum Dependable Capacity (Not MHe).

893 5.

If changes occur to Capacity Ratings (!tems 3 thru 7) since last report, give reasons:

N/A 9.

Power level to which restricted, if any (Net MWel N/A 10.

Reasorts for restrictions, if any N/A This Month Y-t-D Cumulative 11.

Hours in Reporting Period.

672.0 1,416.0 163,036.0 12.

Nunt>er of Hours Reactor was Critical.

672.0 1,416.0 126,633.2 13.

Reactor Reserve Shutdown Hours.

0.0 0.0 7,046.0 14.

Hours Generator On-Line..

672.0 1,416.0 123,589.8 15.

Unit Reserve Shutdown Hours.

0.0 0.0 0.0 16.

Gross Thermal Energy Generated (Ml*l).

1,943,381.2 4,094,797.0 331,675,334.4 17.

Gross Electrical Energy Generated (MWHl.

636,120.0 1,341,829.0 145,994,515.0 10.

Net Electrical Energy Generated (MWH).

605,493.0 1,277,465.0 103,264,119.0 19.

Unit Service Factor.

100.06 100.04 75.4%

20.

Un.it Availability factor.

100.04 100.0%

75.44 21.

Unit Capacity Factor (using MDC Net)...

100.94 101.06 70.5%

22.

Unit capacity Fa6 tor (using DER Net)..

99.34 99.5%

69.54 23.

Forced Outage Rate....

0.04 0.04 9.7%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Each): Scheduled Pefueling Outage beginning May 9, 1997, duration =35 days.

25.

If Shutdown at end of Report Period, estimated time of Startup:

N/A 26.

Units in Test Status (Prior to Conunercial Operation):

Forecast Achieved INITIAL CRIT!CALITY INITIAL ELECTRICITY COFNEPCI AL OPEPATION 1

l l

_ - _ ~ -

a AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-338 Unit:

NA-1 Date:

March 5, 1997

Contact:

W. R. Matthews Phone:

(540) 894-2101 MONTH: February 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 902 17 901 2

902 18 901 3

901 19 902 4

900 20 902 5

900 21 895 6

901 22 901 7

901 23 903 8

901 24 902 9

902 25 902 10 902 26 902 11 901 27 901 12 901 28 901 13 901 14 901 15 900 16 901 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

I

NORTH ANNA POWER STAT. ION UNIT NO.:

1 MONTH: February SIM4ARY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in

'l significant non-load related incidents.

Date Time Data February 01, 1997 0000 Began month with unit at 100% power, 950 MWe.

February 08, 1997 2026 Placed steam dump system in Steam Pressure mode for a

partial calibration of Main Steam Temperature T-1408.

2102 Control Room received Main Steam Line-High Flow annunciation.

A walkdown of the control board revealed:

steam flow

increase, Tave/ Tref decrease, MW generated decrease, and control rod "D"

bank insertion of 223/224.

All indications consistent with'a momentary opening of steam dump valves.

This observation was supported by the Turbine Building Operator who identified a brief flow noise in the area.

Instrument Technicians were instructed to stop work in the racks for investigation.

)

2115 Control rods restored to full out position of 225 steps.

February 09, 1997 0040 Determined the momentary partial opening of the steam dumps was caused by a procedural _ error.

The calibration procedure required the dumps to be in Steam Pressure mode versus the correct mode to be OFF for the test.

February 21, 1997 0940 Commenced ramp down for performance of Turbine Valve Freedom Test.(TVFT) from 100% power, 950 MWe.

1025 Unit stable at 92% power, 875 MWe for TVFT.

1125 TVFT complete satisfactorily.

1128 Commence ramp to 100% power.

1214 Unit stable at 100% power, 948 MWe.

February 28, 1997 2400 Ended month with unit stable at 100% power, 946 MWe.

~

Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS I

Explanation Sheet Docket No.:

50-338 Report Month February Unit Name:

NA-1 Year:

1997 Date: March 5, 1997

Contact:

W. R. Matthews

  • No entries this month.

l i

UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET No.:

50-338 UNIT NAME:

NA-1.

DATE: March 5, 1997 REPORT MONTH: February 1997 CONTACT: W.

R. Matthews -

l PHONE: (540) 894-2101 r

t 4

1 2

3 4

5 No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report i Prevent Recurrence i

h

  • No entries this month.

i 1: Type 2: Reason 3:. Method 4:

F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data i

C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5.

H=Other (explain)

Exhibit H - Same Source t

L I

k k

CPERATING DATA REPORT DOCKET No, t 50-339 DATE: Mar.h 5, 1997 CONTACT:

W. R. Matthews PHONE:

(540) 894-2101 OPERATING STATUS 1.

Unit Names.

North Anna 2 2.

Reporting Periodt........

February 1997 3.

Licensed Thermal Power (MWt).

2,893 4.

Nameplate Rating (Gross HWe).

979 5.

Design Electrical Rating (Net MWe).

901 6.

Maximum Dependable Capacity (Gross MWe)..

944 7.

Maximum Dependable Capacity (Net MWe)l.

897 8.

If changes occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons:

N/A 9.

Power level to which restricted, if any (Net MWe):

N/A 10.

Reasons for sstrictions, if anyt N/A This Month Y-t-D Cumulative 11.

Hours in Reporting Period.

672.0 1,416.0 142,104.0 12.

Number of Hours Reactor was Critical.

672.0 1,416.0 118,371.2 2

13.

Reactor Reserve Shutdown Hours..

0.0 0.0 7,162.2 14.

Hours Generator on-Line.

672.0 1,416.0 117,200.2 15.

Unit Reserve Shutdown Hours.

0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH).

1,943,667.6 4,092,622.6 319,674,540.6 17.

Gross Electrical Energy Generated (MWH).

637,529.0 1,343,150.0 104,612,385.0 18.

Net Electrical Energy Generated (MWH).

607,129.0 1,279,257.0 99,972,439.0 19.

Unit Service Factor.

100.0%

100.0%

82.5%

20 Unit Availability Factor.

100.0%

100.04 82.56 21.

Unit Capacity Factor (using MDC Net).

100.7%

100.7%

78.2%

22.

Unit Capacity Fr4 tor (ud!ng DEA Net).

99.6%

99.6%

77.64 23.

Forced Outage Rate..

0.04 0.04 5.4%

24.

Shutdowns Scheduled Over Next 6 & nths (Type, Date, Duration of Each):

N/A 25.

If Shutdown at end of Report Period, estimated time of Startups N/A 26.

Units in Test Status (Prior to Cowenercial Operation):

forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COF94ERCI AL OPERATION l

I

-_ _ - -_,_=-- -__ -

AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-339 Unit:

NA-2 Date:

March 5, 1997

Contact:

W. R. Matthews Phone:

(540) 894-2101 i

MONTH: February 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 905 17 904 2

905 18 903 3

905 19 903 4

904 20 904

(

5 904 21 904 i

I 6

903 22 903 7

904 23 904 l

i.

8 904 24 904 9

904 25 903 10 903 26 903 11 903 27 903 12 903 28 903 13 903 14 900 15 903 16 904 l

Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l I

r

- - - - ~. _ -

L NORTH ANNA POWER STATION UNIT NO.:

2 MONTH: February SUl44ARY OF OPERATING EXPER~ENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

j Date Time Data j

February 01, 1997 0000 Began month in Mode 1 at 100% power, 950 MWe.

February 14, 1997 0830 Commenced ramp down from 100% power for i

Turbine Valve Freedom Test (TVFT).

l 0854 Unit stable at 94% power, 880 Mwe.

l 0925 TVFT completed satisfactorily.

0941 Commenced ramp to 100% power after TVFT.

I 1053 Unit stable at 100% power, 947 MWe.

i February 28, 1997 2400 Ended month in Mode 1 at 100% power, 950 MWe.

1 1

s 4

J f

I Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet 1

Docket No.:

50-339 4

Report Month February Unit Name:

NA-2 4

l Year:

1997 Date: March 5, 1997

Contact:

W. R. Matthews 4

No entries this month.

i i

l 1

a

)

i f

A 1

.I A

1 t

4.

4 e-..

  • ' ' ~

. _ - - -.. ~.

-. ~,.... -.

i

[

UNIT SHUTDOWS AND POWER REDUCTIONS I

P f

DOCKET NO.:

50-339 UNIT NAME:

NA-2 DATE: March 5, 1997 REPORT MONTH: February 1997 CONTACT: W. R. Matthews -

i f

PHONE: (540) 894-2101 i

E c

i.

1 2

3 4

5

[

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to i

Down Reactor Report #

Prevent Recurrence

[

l N o entries this month.

t i

i t

1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scran for preparation of Data f

C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational-Error 5:

l H=Other (explain)

Exhibit H - Same Source

[