.- . . _ . _ .- =_ - _ - . ,

. s VIRGINIA ELecTurc AND Pownn COMPANY Racirwown,V!HOINIA 20261 l

March 4,1997 h

l United States Nuclear Regulatory Commission Serial No.97-144 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the February 1997 Monthly Operating Report for North Anna Power Station Unit 1 and 2.

Very truly yours, UG i W. R. Matthews Station Manager Enclosure cc: U. S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter NRC Senior Resident inspector # h /

North Anna Power Station 9703120038 970228 PDR ADOCK 05000338 R PDR

,N

. .. . - - . . - .. . .. . .- . . ~ ~- -. . ..

d e d

4

VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT a

i MONTH: Februarv YEAR: 1997 Approved:

W k.l2Y Station Manager l

l l

)

l

CP RATIN3 DATA REPIRT DOCKET NO. : 50-334 DATE: March 5, 1997 CONTACT: W. R. Matthews PHONE: (540) 894-2101 l OPERATING STATUS l

1. Uni t N4me r . . .... . .. .. .. .. . North Anna 1 l
2. Reporting Periods. . . .. . . . . . . February 1997
3. Licensed Thermal Puwer (Mwt) . . . . . . . .. 2,893 '
4. Nameplate Rating (Gross MHv) n. . . 994 S. Design Electrical Rating (Net HHoli.. l

.. . . 907 i

6. Maximum Dependable capacity (Gross MWe) .. . 940
7. Maximum Dependable Capacity (Not MHe) . . 893
5. If changes occur to Capacity Ratings (!tems 3 thru 7) since last report, give reasons: N/A
9. Power level to which restricted, if any (Net MWel N/A
10. Reasorts for restrictions, if any N/A This Month Y-t-D Cumulative
11. Hours in Reporting Period. . , . . . . 672.0 1,416.0 163,036.0
12. Nunt>er of Hours Reactor was Critical. . . .. . 672.0 1,416.0 126,633.2
13. Reactor Reserve Shutdown Hours. . .... .. . 0.0 0.0 7,046.0
14. Hours Generator On-Line. . .... . .. . . 672.0 1,416.0 123,589.8
15. Unit Reserve Shutdown Hours. 0.0 0.0

. . .. 0.0

16. Gross Thermal Energy Generated (Ml*l). .... .... . 1,943,381.2 4,094,797.0 331,675,334.4
17. Gross Electrical Energy Generated (MWHl. ... .. ... 636,120.0 1,341,829.0 145,994,515.0
10. Net Electrical Energy Generated (MWH). ... . . ... 605,493.0 1,277,465.0 103,264,119.0
19. Unit Service Factor. .. . . .... . . . . . 100.06 100.04 75.4%
20. Un.it Availability factor. . ., . . . . 100.04 100.0% 75.44
21. Unit Capacity Factor (using MDC Net)... . ... . . .. 100.94 101.06 70.5%
22. Unit capacity Fa6 tor (using DER Net) .. . . .. 99.34 99.5% 69.54
23. Forced Outage Rate.... . . .. . . .. . ..... . . 0.04 0.04 9.7%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Each): Scheduled Pefueling Outage beginning May 9, 1997, duration =35 days.
25. If Shutdown at end of Report Period, estimated time of Startup: N/A
26. Units in Test Status (Prior to Conunercial Operation):

Forecast Achieved INITIAL CRIT!CALITY INITIAL ELECTRICITY COFNEPCI AL OPEPATION 1

l l

l l

- _- , _ . ---- - _ _ - - - _ - _ ~ -

a AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit: NA-1 Date: March 5, 1997

Contact:

W. R. Matthews Phone: (540) 894-2101 MONTH: February 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 902 17 901 2 902 18 901 3 901 19 902 4 900 20 902 5 900 21 895 6 901 22 901 7 901 23 903 8 901 24 902 9 902 25 902 10 902 26 902 11 901 27 901 12 901 28 901 13 901 14 901 15 900 16 901 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I

. NORTH ANNA POWER STAT. ION l

, UNIT NO.: 1 l MONTH: February SIM4ARY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating ,

experiences for this month which required load reductions or resulted in 'l significant non-load related incidents.

Date Time Data February 01, 1997 0000 Began month with unit at 100% power, 950 MWe.

February 08, 1997 2026 Placed steam dump system in Steam Pressure mode l for a partial calibration of Main Steam '

Temperature T-1408.

2102 Control Room received Main Steam Line- High Flow annunciation. A walkdown of the control board revealed: steam flow increase, Tave/ Tref decrease, MW generated decrease, and control rod "D" bank insertion of 223/224. All indications consistent with'a momentary opening of steam dump valves. This observation was  ;

supported by the Turbine Building Operator who 1 identified a brief flow noise in the area.

Instrument Technicians were instructed to stop work in the racks for investigation.

)

2115 Control rods restored to full out position of )

225 steps.

February 09, 1997 0040 Determined the momentary partial opening of the steam dumps was caused by a procedural _ error.

The calibration procedure required the dumps to be in Steam Pressure mode versus the correct mode to be OFF for the test.  :

February 21, 1997 0940 Commenced ramp down for performance of Turbine Valve Freedom Test .(TVFT) from 100% power, 950 MWe.

1025 Unit stable at 92% power, 875 MWe for TVFT.

1125 TVFT complete satisfactorily.

1128 Commence ramp to 100% power.

1214 Unit stable at 100% power, 948 MWe.

February 28, 1997 2400 Ended month with unit stable at 100% power, 946 MWe.

~

Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS I Explanation Sheet Docket No.: 50-338 Report Month February Unit Name: NA-1 Year: 1997 Date: March 5, 1997

Contact:

W. R. Matthews

  • No entries this month.

l l

i

UNIT SHUTDOWS AND POWER REDUCTIONS ,

DOCKET No.: 50-338 . .

UNIT NAME: NA-1.

DATE: March 5, 1997 REPORT MONTH: February 1997 CONTACT: W. R. Matthews - l PHONE: (540) 894-2101 r

t 4

1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report i Prevent Recurrence i

  • No entries this month.

i 1: Type 2: Reason 3:. Method 4:  !

F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data i C= Refueling 3= Automatic Scram Entry Sheets for Licensee  ;

  • D= Regulatory Restriction 4= Continuations Event Report (LER) File  !

E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5.  ;

H=Other (explain) Exhibit H - Same Source t

. L I

k k

CPERATING DATA REPORT DOCKET No, t 50-339 DATE: Mar.h 5, 1997 CONTACT: W. R. Matthews PHONE: (540) 894-2101 OPERATING STATUS

1. Unit Names. .. . . . ... . . .. North Anna 2
2. Reporting Periodt........ .. .. ..... . February 1997
3. Licensed Thermal Power (MWt) . .. . 2,893
4. Nameplate Rating (Gross HWe) . . .. . 979
5. Design Electrical Rating (Net MWe) . .. ... 901
6. Maximum Dependable Capacity (Gross MWe) .. 944
7. Maximum Dependable Capacity (Net MWe)l . . . 897

, 8. If changes occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons: N/A

9. Power level to which restricted, if any (Net MWe): N/A l
10. Reasons for sstrictions, if anyt N/A This Month Y-t-D Cumulative
11. Hours in Reporting Period. . . 672.0 1,416.0 142,104.0
12. Number of Hours Reactor was Critical. . ... 672.0 1,416.0 118,371.2 2
13. Reactor Reserve Shutdown Hours.. . . . .. 0.0 0.0 7,162.2 l
14. Hours Generator on-Line. . .. .. . .. . . .. 672.0 1,416.0 117,200.2
15. Unit Reserve Shutdown Hours. . ,. . .. . . 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH). . . .... ... . 1,943,667.6 4,092,622.6 319,674,540.6
17. Gross Electrical Energy Generated (MWH). . ., . 637,529.0 1,343,150.0 104,612,385.0
18. Net Electrical Energy Generated (MWH) . . .. . 607,129.0 1,279,257.0 99,972,439.0
19. Unit Service Factor. . . . .. . 100.0% 100.0% 82.5%

20 Unit Availability Factor. . . . .. . 100.0% 100.04 82.56

21. Unit Capacity Factor (using MDC Net). .. . .. .. 100.7% 100.7% 78.2%
22. Unit Capacity Fr4 tor (ud!ng DEA Net) . .... .. . .. 99.6% 99.6% 77.64
23. Forced Outage Rate.. ... ... . 0.04 0.04 5.4%
24. Shutdowns Scheduled Over Next 6 & nths (Type, Date, Duration of Each): N/A
25. If Shutdown at end of Report Period, estimated time of Startups N/A
26. Units in Test Status (Prior to Cowenercial Operation):

forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COF94ERCI AL OPERATION l

I l

. . . . - .. - -_ _ - -_,_=-- -__ - - . .-. -..

AVERAGE DAILY UNIT POWER LEVEL l

l Docket No.: 50-339 l Unit: NA-2

Date: March 5, 1997

Contact:

W. R. Matthews Phone: (540) 894-2101 i .

MONTH: February 1997 l

DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 905 17 904 2 905 18 903 3 905 19 903 4 904 20 904 ,

( 5 904 21 904 i I 6 903 22 903 1 7 904 23 904 l

i. 8 904 24 904 9 904 25 903 10 903 26 903 11 903 27 903 12 903 28 903 13 903 14 900 15 _

903 16 904 l Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l I

r

_ . . _ . . _ . . . - _ . - . _ _ _ . . - _ . - _ _ _ - - _ - _ . . . . _ _.__ - . - - - - ~ . _ -

1 L

  • NORTH ANNA POWER STATION

. UNIT NO.: 2 MONTH: February SUl44ARY OF OPERATING EXPER~ENCE

! Page 1 of 1 Listed below in chronological sequence is a summary of operating ,

experiences for this month which required load reductions or resulted in '

significant non-load related incidents.

j Date Time Data j February 01, 1997 0000 Began month in Mode 1 at 100% power, 950 MWe.

February 14, 1997 0830 Commenced ramp down from 100% power for i

Turbine Valve Freedom Test (TVFT).

l 0854 Unit stable at 94% power, 880 Mwe.

l 0925 TVFT completed satisfactorily.

0941 Commenced ramp to 100% power after TVFT.

I 1053 Unit stable at 100% power, 947 MWe.

i

February 28, 1997 2400 Ended month in Mode 1 at 100% power, 950 MWe.  ;

1 1

s 4

J f

. I Page 1 of 1 ,

UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet 1

Docket No.
50-339 4

Report Month February Unit Name: NA-2 4

l Year: 1997 Date: March 5, 1997

Contact:

W. R. Matthews 4

No entries this month.

i i

l 1

a

)

i f

A 1

.I A

1 t

4.

4 e-.. * ' ' ~

. _ - - - . . ~ . . -. ~ , . . . . - . . . . _

i UNIT SHUTDOWS AND POWER REDUCTIONS '

. I DOCKET NO.: 50-339 -

UNIT NAME: NA-2 DATE: March 5, 1997 REPORT MONTH: February 1997 CONTACT: W. R. Matthews - i PHONE: (540) 894-2101 i

i 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to i Down Reactor Report # Prevent Recurrence l

  • N o entries this month.

i 1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scran for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee -

D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational-Error 5:

H=Other (explain) Exhibit H - Same Source