Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
. - .
l
\
l VIItGINIA 15LECTRIC AND POWEH COMi>ANY l R'CIIMOND,VIHOINIA 202 61 February 7, 1996 U. S. Nuclear Regulatory Commission Serial No.96-066 Attention: Document Control Desk NL&OS/JHL/ CMC Washington, D.C. 20555 Docket Nos. 50-338 !
50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the January 1996 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, M. L. Bowling, Manager Nuclear-Licensing and Operations Support Enclosure cc: U.S. Nuclear Regulatory Commission j Region II -
101 Marietta Street, NW l Suite 2000 Atlanta, GA 30323 Mr. R. D. McWhorter i NRC Senior Resident Inspector North Anna Power Station l 9602130o83 96o131 PDR f ADOCK 0500o338 R PDR f a
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: Januarv YEAR: 1996 Approved:
OO
$@d Station Manager
. ~ . . . . .~ _ . --- .- ._. . _.
, OPERATING DATA REPORT DOCKET NO.: 50-338 DATE: February 5, 1996 CONTACT: J. A. Stall PHONE: (540) 894 2101 OPERATING STATUS
- 1. Unit Name:................................ North Anna 1
- 2. Riport i ng Per i od: . . . . . . . . . . . . . . . . . . . . . . . . . January 1996
- 3. L icensed Thernal Power ( MWt ): . . . . . . . . . . . . . 2,893
- 4. N ameplate Rating (Gross MWe): . . . . . . . . . . . . . 994
- 5. Dision Electrical Rating (Net MWe):....... 907
- 6. M1ximum Dependable capacity (Gross MWe):.. 940
- 7. M1ximum Dependable Capacity (Net MWe):.... 893 i I
- 8. If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons: ____N/A l
- 9. Power level to which restricted, if any (Net MWe): _ N/A
- 10. Riasons for restrictions, if any: N/A This Month Y-t D Cumulative !
- 11. Hours in Reporting Period.......................... ...... 744.0 744.0 154,380.0
- 12. Number of Hours Reactor was Critical...................... 744.0 744.0 117,930.4
- 13. Rsactor Reserve Shutdown Hours............................ 0.0 0.0 6,951.4
- 14. Hours Generator 0n-Line................................... 744.0 744.0 114,931.5
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0
- 16. Gross Therma l E nergy Genera t ed (MWH) . . . . . . . . . . . . . . . . . . . . . . 1,724,664.7 1,724,664.7 307,038,401.8
- 17. Gross E lect ri cal E nergy Generat ed (MWH ) . . . . . . . . . . . . . . . . . . . 566,387.0 566,387.0 100,884,722.0
- 18. Nat Electrical Energy Generated (MWH)..................... 534,283.0 534,283.0 95,575,437.0
- 19. Unit Service Factor....................................... 100.0% 100.0% 74.4%
- 20. Unit Availability Factor.................................. 100.0% 100.0% 74.4%
- 21. Uni t Capac i ty Factor (us i ng MDC Net ) . . . . . . . . . . . . . . . . . . . . . . 80.4% 80.4% 69.3%
- 22. Uni t Capaci ty Factor (using C ER Net) . . . . . . . . . . . . . . . . . . . . . . 79.2% 79.2% 68.3%
- 23. Forced Outage Rate........................................ 0.0% 0.0% 9.3%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, ard Duration of Each):__ Refueling Outage Scheduled for February 10, 1996, Duration 29 Days
- 25. If Shutdown at end of Report Period, estimated time of Startup:__N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit: NA-1 Date: Februarv 5, 1996 Contact J. A. Stall Phone: (540) 894-2101 1
MONTH: January 1996 l
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWs-Net) LEVEL (MWe-Net) 1 802 17 709 2 798 18 707 3 790 19 705 4 770 20 702 5 770 21 699 6 767 22 680 7 763 23 680 8 760 24 678 9 758 25 676 10 740 26 673 I 11 739 27 671 !
12 736 28 649 !
13 734 29 649 __
14 732 30 647 i 15 726 31 645 l
16 708 i
l l
I I
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, compute to the nearest whole megawatt.
l
NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: January
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data January 01, 1996 0000 Began month in end-of-cycle coastdown with unit at 89% power, 806 MWe.
January 31, 1996 2400 Ended month with unit at 71% power, 686 MWe.
Several small unit ramp-downs (<5% power each) have occurred during the month to match Tave and Tref during end-of-cycle coastdown and are not ,
individually recorded in this report. !
1 i
l l
l 1
- _ _ . -- - - . . . - . .. . . - . - . - . = _ . -
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-338 Report Month January Unit Name: NA-1 Year: 1996 Date: Februarv 5, 1996
Contact:
J. A. Stall
l l
l 2
l i
I
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-338 UNIT NAME: NA-1 DATE: February 5, 1996 REPORT MONTH: January 1996 CONTACT: J. A. Stall PHONE: (540) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence O No Entry This Month l
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F- Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5: '
H=Other (explain) Exhibit H - Same Source
OPERATING DATA REPORT DOCKET NO.: 50-339 DATE: February 5, 1996 CONTACT: J. A. Stall PHONE: (540) 894-2101 OPERATING STATUS
- 1. Unit Name:................................ North Anna 2
- 2. R1 porting Period:......................... January 1996
- 3. Licensed Thermal Power (MWt):............. 2893
- 4. Nameplate Rating (Gross MWe):............. 979
- 5. Dision Electrical Rating (Net MWe):....... 907
- 6. Miximum Dependable Capacity (Gross MWe):.. 944
- 7. M1ximum Dependable Capacity (Net MWe):.... 897
- 8. If changes occur in capacity Ratings (Items Wo. 3 thru 7) since last report, give reasons: N/A
- 9. Power level to which restricted, if any (Net MWe): _ N/A
- 10. Raasons for restrictions, if any: N/A This Month Y-t-D Cumulative
- 11. Hours i n R epor t i ng Peri od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 744.0 744.0 132,648.0
- 12. Number of Hours Reactor was Critical...................... 744.0 744.0 110,801.6
- 13. Rtactor Reserve Shutdown Hours............................ 0.0 0.0 6,535.0
- 14. Hours Generator 0n-Line................................... 744.0 744.0 109,667.1
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) ..................... 2,151,4/.2.9 2,151,442.9 298,128,681.6
- 17. Gross Electrical Energy Generated (MWH)................... 709,928.0 709,928.0 97,541,346.0
- 18. Net E lect rical Energf Genera ted (MWH) . . . . . . . . . . . . . . . . . . . . . 676,443.0 676,443.0 93,248,082.0
- 19. Unit Service Factor....................................... 100.0% 100.0% 82.7%
- 20. Unit Availability Factor.................................. 100.0% 100.0% 82.7%
- 21. Unit Capacity Factor (using MOC Net)...................... 101.4% 101.4% 78.1%
- 22. Unit Capacity Factor (using DER Net)...................... 100.2% 100.2% 77.5%
- 23. Forced Outage Rate........................................ 0.0% 0.0% 4.8%
- 24. Shutdown 3 Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup: N/A
- 26. Units in Test Status (Prior to Consnercial Operation):
Forecast Achieved INITIAL CRITICALITY
! INITIAL ELECTRICITY COMMERCIAL OPERATION l
l l AVERAGE DAILY UNIT POWER LEVEL l
l Docket No.: 50-339 Unit: NA-2 Date: Februarv 5, 1996 Contact J. A. Stall Phone: (540) 894-2101 MONTH: January 1996 l DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL '(MWe-Net) 1 908 17 911 2 911 18 911 3 911 19 889 4 911 20 892 5 911 21 910 6 911 22 911 7 910 23 911 8 910 24 912 9 910 25 911 l 10 910 26 911 !
11 910 27 911 12 910 28 912 13 910 29 911 14 910 30 910 15 910 31 911 16 911 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l NORTH ANNA POWER STATION
. UNIT NO.: 2 MONTH: Januarv l
SUMMARY
OF OPERATING EXPERIENCE 1 i
l Page 1 of 1 l l
1 Listed below in chronological sequence is a summary of operating j experiences for this month which required load reductions or resulted in -
significant non-load related incidents.
Date Time Data January 01, 1996 0000 Began month with unit stable at 100% power, 910 MWe.
January 19, 1996 0857 Commenced ramp down for Turbine Valve Freedom Test (TVFT) from 100% power, 957 MWe.
0938 Unit stable at 89% power, 855 MWe.
1025 TVFT completed satisfactorily.
1147 Commenced ramp to 100% power after TVFT.
1301 Unit stable at 100% power, 940 MWe.
January 31, 1996 2400 Ended month with unit stable at 100% power, 912 Mwe.
1 l
e -
Page 1 of 1 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet l
Docket No.: 50-339 i 1
Report Month Januarv Unit Name: NA-2 l
l Year: 1996 Date: Februarv 5, 1996
Contact:
J. A. Stall l
l l
l l
l l
i
1 l
l I
.l DOCKET NO.: 50-339 -
UNIT NAME: NA-2 DATE: February 5, 1996 REPORT MONTH: January 1996 CGhTACT: J. A. Stall PHONE: (540) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence o No Entries This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source J