MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
_ _ . . .
l . .
i !
l
., .. 1 4
I
! l i
[
t I i l j k
VIRGINIA POWER COMPANY !
l NORTH ANNA POWER STATION (
l HONTHLY OPERATING REPORT .
i MONTH: July YEAR: 1997 i
a t Approved: i 1.
l h
gy Station _ Manager 9708190298 970811 PDR ADOCK 05000338 R PDR
, e
, OPERATINS DATA REPORT titGI'T N3, s 50 336 12ATEi AJgust $. 1997 COFI ACT: N. R. Matthews THONE: ($40) 494-3101 Ol'EkATIN3 STATtfS
- 1. Unit Names. .. ..... . . ... . . North Anna 1
- 3. Repos-ting periode. . . . . . . July 1991
- 3. Licensed Thors.at Iwwer (MWtis. . . . . 3,09)
- 4. Nameg' late Rating (0 oss MWeli . ... . 994
- 6. tesign tiectrical Rating (Not MWel e. .. . 907
- 6. Maximum teg endatile Capacity (Gross MWe) 3. . 640
- 7. Maalmum 1+pendable Cag acity (Not MWel s . . . . 093 l
- 8. It changes occur to Capacity katings (1tems 3 thru 7) since last repott, give teasons N/A l
- 9. Power level to which testricted, if any (Not MWeli N/A
- 10. teasons for restrictions, if any: N/A This Month Y+t D Cumulative
- 11. Houts in Reporting i+eriod., . . ... . . . 744.0 9,007.0 167,607.0
- 13. Number of Hours konctor was Critical.. . . . . 144,0 4,364.4 129,683.0
- 13. Reactor koserve Shutdown Hours.. . . . ,. . . . 0.0 49.0 7,095.0
- 14. Hours Generator On.Line. ....... . . .. . . . . 744.0 4,320.6 126,494.4
- 15. tinit Reserve Shutdown llours. . . . ... .. .. .. . . 0.0 0.0 0.0
- 16. Gross Thermal Enespy Oenerate$ (MNHl. . .. . . . . . . 3,105,011.9 13,336.62).9 339,917,160.6 17 Grosa Elect rical triorgy Generated (MWH) . . . . . . . 691,960.0 4.046,309.0 146,60s,996.0 It. Het Electrical Energy Generated (MWH).... 4. .. . .. . 666,401.0 3.647,191.0 105.03),84%.0
- 19. Unit Service Factor. . .. . . ... . . . . ... 100.0% 84.9% 75.6%
- 30. Unit Availability Factor, . . . .. . . .... 100.0% 44.9% 75.5%
- 31. Ifnit Capacity Factor (using MDC Net) . . . . . . . . 98.86 84.7% 70.74
- 33. Unit Capacity Factor (using DER Not) . . .. . 97.3% 63.4% $9.7%
- 33. Forced Outage Rate.. . .. . . . . . . 0.0% 0.0% 0.6%
- 34. Shutdowns Scheduled Over Next 6 Months (Type, !> ate, Duration ._ N/A 25, 11 Shutdown at end of Report Feriod, estimated time of Startu N/A
- 24. tinits in Test Status (Frior to Commercial Ope ation):
Forecast Achieved INITIAt. CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION J
4 i
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit NA-1 l Dates Aucust 5. 1997 j _
Contact:
W. R. Matthews Phone _(540) 894-2101 NONTH: July 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (NWe-Net) LEVEL (NWe-Net) 1 879 17 900-2 882 18 898 3 883 19 847 4 884 20 786 5 883 21- 815 6 883 22 895 7 883 23 898 8 883 24 901 9 _ 882 25 900 10 882 26- 899 ,,,.
11 792 27 898 12 902 28- 898 13 902 29 898 14 901 30 898 15 900 31 898 16 -- 900 Instructions:
On this format, list the average daily _ unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
, NORTH ANNA PONER STATION 4
j UNIT NO. 1
., . . NONTH: July
SUMMARY
OF OPERATING EEPERIENCE l
Page 1 of 3 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in cignificant non-load related incidents.
Date Time Data l
l July 01, 1997 0000 Began month in Mode 1 at 97% power, 923 Mwe.
July 01, 1997 1310 Commence throttling Moisture Separator Re-heater steam supply valves for data collection, power at 96.5%, 921 Mwe.
1355 Secured MSR throttling, unit stable at 96%
power, 915 MWe.
1510 Commence ramp up to 100% power after MSR data collection.
1558 Suspended ramp at 98% power, 930 Mwe for Nuclear Instrument (NI) calibration.
-1602 Commenced- ramp up to -100% power after NI.
calibration.
1645 Unit stable at 100% power, 950 Mwe.
1808 Commenced ramping down to 97% power due to governor valve vibration.
1830 Unit stable at 97.5% power, 930 Mwe.
July 11, 1997 0310- Commence ramp down to 62% power for governor valve control maintenance.
0541 Stopped ramp at 54% power, 592 Mwe.
0936 Commence ramp up to 850 Mwe for Turbine Valve Freedom Test (TVFT).
1220 Commence TVFT.
NORTH ANNA PONER STATION UNIT NO. ._1 MONTH: Julv 4 4 BUMMARY OF OPERATING EXPERIENCE Page 2 of 3 l 1300 Completed TVFT, ramping to 97.5% power for NI calibration.
1402 Unit at 97% power for NI calibration.
1542 Commence ramp up to 100% power, 1650 Unit at 100% power, 947 Mwe.
July 18, 1997 0815 Load increase to 101.6% power, 953 MWe, due to Valve Position Limiter failure. Ramped unit down to 100% power.
0830 Unit stable at 99.6% power, 942 Mwe.
1110 Commence raising power-to 100% power.
1131 Unit power at 100% power, 943 Mwe.
July 19, 1997 1320 Unit lost 105 Mwe due to failure of the turbine Valve Position Limiter, 90% power.
1444 Unit stable at 89% power, 835 Mwe.
July 21,1997- 1611 Commence ramp up to 98% power. Initial power 86%, 826 Mwe.
1640 90% calorimetric complete, ramping up to 98%
power.
1740 Holding ramp at 98% power, 930 Mwe per management administrative hold.
2310 Power restriction lifted, ramping to 100%
power from 98%, 920 Mwe.
2324 Stopped ramp at 99.5%, 940 Mwe due to 10 megawatt swing causing reactor power to swing about 0. 5% power. Swing attributed to Valve Position Limiter problem.
July 23, 1997 1330 Load increased to 100.5 % power when turbine control was switched to TURBINE MANUAL.
UNIT NO. 1 MONTH: July
SUMMARY
OF OPERATING EXPERIENCE Page 3 of 3 1450 Calorimetric complete. Unit at 100% power, 948 Mwe. July 24, 1997 1356 Removed turbine control from the */alve Position Limiter and transferred control to IMP OUT mode to maintain the governor valves in a more stable ;gion. Unit at 100% power, 949 Mwe.
I July 31, 1937 2400 Ended month in Mode 1 at 100% power, 949 MWe.
4 4 4
t l , , Page 1 of 1 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-338 Report Month July Unit Name: NA-1 Years 1997 Dates August 5, 1,122
Contact:
W. R. Matthews
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-338 UNIT NAME: NA-1 -
DATE: August 5,1997 REPORT MONTH: July 1997 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event. Code Code Action to Down Reactor Report # Prevent Recurrence
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1 Manual Exhibit F - Instruction S= Scheduled B= Maintenance or Test. 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licens D= Regulatory <striction 4= Continuations Event Report (LER) File E= Operator "raming & License Examination 5= Load Reduction (NUREG-0161)
F=Administrat.ve 9-Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source m______..... . . . . . - . . . . . - - - . - . . . -
. OPERATING DATA REPORT
, , DOCKET NO.t 50 139 LATE: August 5, 1997 COFTACT: N. R. Matthews FHONE (440) 894-2101 OPERATING $7ATUS
- 1. Unit Names. .. . . Nonth Anna 2
- 2. Reporting feriods. . .. . . . July 1997
- 3. Licensed Thermal Power (MWtli. 2,891
- 4. Nameplate Rating IQtoss MWebs. . 979
- 5. Design Electrical Ratthg (Net MWeli.... . . 907
- 6. Maximum Dependable Capacity (Gross MWels. 944
- 7. Naminum Dependable Capacity (Not MWeli. 897
- 8. If changes occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons: N/A l
l
- 9. Power level to which mostricted, if any (Net MWeli N/A
- 10. Reasons for restrictione, if any N/A i
This Month Y-t D Cumulative
- 11. Hours in Reporting terlod. . . . . . . . 744,0 5,087.0 145,775.0
- 12. Nunter of Hours Reactor was Critical. . 144.0 5,057.0 122.042.2
- 13. Reactor Deserve shutdown Hours.. 0.0 0.0 7,163.2
- 14. Hours Generator On.l.ine., . . . . . 744.0 5,087.0 120,871.2
- 15. tinit Rese ve Shutdown Hours. . . . ... . . 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH). ... . , . 2,151,784.1 14,709.884.4 330,291,802.4
- 17. Gross Electrical Energy Generated (MdH). . . . 698,171.0 4,f09,097.0 100,079,132.0
- 18. Not Electrical Energy Generated IMWHl. . .. . . . 663,472.0 4,578,937.0 103,212.119.0
- 19. Unit Service Factor.. . . . . 100.0% 100.0% 82.9%
- 20. Unit Availability Factor. . . . . ,, . . . 100.0% 100.0% 42.9%
- 21. Unit Capacity Factor lusing MDC Net). . . . ., . 99.4% 100.3% 18.6%
- 22. Unit Capacity Factor (using DER Net). . 98.3% 99.2% 78,1%
- 23. Forcet Outage Rate,. . . .. . . . . . 0.04 0.0% 5.2%
- 24. Shut downs scheduled Over Next 4 Montha (Type, Date, Duration of Bach): N/A
- 25. !! Shutdown at end of Report Perind, estimated time of Startu N/A
- 26. Units in Test Status (Prior to Commercial Operation)s Forecast Achieved IN!TIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
l
. i
. e AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit: NA-2 Date Aucust 5. 1997
Contact:
W. R. Matthews Phones .f 540) 894-2101
)
MONTH: July 1997 l l
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 893 17 890 ,
2 893 18 889 3 892 19 889 4 892 20 890 5 891 21 890 6 892 22 890 7 892 23 892 8 892 24 893 9 891 25 894 10 891 26 895 11 893 27 893 12 893 28 893 13 892 29 892 14 891 30 893 15 890 31 893 16 890 i
s Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
t
- NORTH ANNA PONER STATION UNIT NO. 2 NONTH
- July
SUMMARY
OF OPERATING EYDERTENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating-i cxperiences for this month which required load reductions or resulted in l cignificant non-load related incidents.
Date Time Data July 01,- 1997 0000 Began month in Mode 1 at 100% power, 938 MWe.
July 06, 1997 0045 Commence ramp down for Turbine Valve Freedom Test (TVFT). Unit at 100% power, 936 MWe.
0107 Unit stable at 93% power, 885 Mwe.
0124 Commence unit ramp up following TVFT. Unit at 93% power, 885 Mwe.
0147 Unit stable at 100% power, 938 Mwe.
--July 31, 1997 2400 Ended month in Mode 1 at 100% power, 938 MWe.
. - Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-339 Report Month July Unit Name: NA-2 Year: 1997 Date: August 5. 1997
Contact:
W. R. Matthewn
(
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-339 UNIT NAME: NA-2 DATE: August 5, 1997 REPORT MONTH: July 1997 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee Sy: tem Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence 5
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instruction S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licens D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9eOther G= Operational Error 5:
H=Other (explain) E:chibit H - Same Source L