MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
1 VIHOINIA ELECTHIC Ah'D PowEH COMPANY j llICIIM ONu, V HOINIA 20261 May 13, 1996 l
l United States Nuclear Regulatory Commission Serial No.96-247 j Attention: Document Control Desk NLOS/RPC ,
Washington, D.C. 20555 Docket Nos. 50 338 l 50-339 l License Nos. NPF-4 l NPF-7 i I
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 M_ONTHLY OPERATING REPORT Enclosed is the April 1996 Monthly Operating Report for North Anna Power Station Units 1 and 2. ,
)
Very truly yours, M. L. Bowling, M nager Nuclear Licensing and Operations Support Enclosure cc: U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 9605160347 960430 ;
PDR R
ADOCK 0500033G PDR
/ -
1000:19 [ I
\\
2
l i
i VIRGINIA POWER COMPANY NORTH ANNA POWER STATION l MONTHLY OPERATING REPORT i
I MONTH: April YEAR: 1996 l
l j
i Approved:
Station Manager
I l
l l +
l .
DOCKET No.: 50-338 !
DATE: May 5, 1996 j CONTACT: W. R. Matthews !
PHONE: (540) 894-2101 l OPERATING STATUS i
- 1. Unit Names................................ North Anna 1 ,
- 2. Reporting Periods......................... April'1996 l
- 3. Licensed Thermal Power (MWt) ............. 2,893 l 4. Nameplate Rating (Gross MWe)2............. 994
- 5. Dssign Electrical Rating (Net MWe):....... 907 l
l 6. Maximum Dependable capacity (Gross MWe):.. 940
( '7. M ximum Dependable Capacity (Net MWe) .... 893 l
l l,
- 8. .If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons: N/A ;
l i i
I i
I
- 9. ' Power level to which restricted, if any (Net MWe): N/A !
- 10. Ra: cons for restrictions, if any: N/A L
b This Month Y t-D Cumulative i
- 11. Hours in Reporting Period................................. 719.0 2,903.0 156,539.0 ;
l - 12. N aber of Hours Reactor was critical...................... 719.0 2,202.5 119,388.9 (
l 13. Ratetor Reserve Shutdown Hours............................ 0.0 43.0 6,994.4 !
t
- 14. Hours Generator 0n-Line................................... 719.0 2,174.7 116,362.2
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0
- 16. Grois Thermal Energy Generated (MWH)...................... 2,079,624.4 5,520,280.5 310,834,017.6
- 17. Grors Electrical Energy Generated (MWH).... . . ..... . ...... . 685,111.0 1,815,212.0 139,145,825.0
- 18. nit Electrical Energy Generated (MWH)..................... 652,522.0 1,719,383.0 96,760,537.0 ,
- 19. Unit Service Factor....................................... 100.0% 74.9% 74.3%
l 20. Unit Availability Factor.................................. 100.0% 74.9% 74.3%
! 21. Unit Capacity Factor (using MDC Net)...................... 101.6% 66.3% 69.2%
- 22. Unit Capacity Factor (using DER Net)...................... 100.1% 65.3% 68.2%
i
- 23. Forced Outage Rate........................................ 0.0% 0.0% 9.2% ;
I
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:_ N/A
- 26. Units in Test Status (Prior to Comercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY 4
COMMERCIAL OPERATION 4
l l
1 I
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338-Unit: NA-1 Date: May 5. 1996 Contact W. R. Matthews i Phone (540) 894-2101 MONTH: April 1996 1
l DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Ne t) 1 909 17 909 l 2 18 908 909 3 909 19 908 4 908 20 908 5 909 21 908 6 909 22 908 7 909 23 908 8 909 24 908 9 905 25 906 10 906 26 906 11 909 27 907 12 909 28 907 13 906 29 907 14 909 30 906 15 904 16 906 l
l I
l Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest-whole megawatt. j
NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: April l
l
SUMMARY
_OF__ OP_BRATING_EXP ERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of. operating l experiences for this month which required load reductions or resulted in significant non-load.related incidents.
Es_t_t Time Rmta April 01, 1996 0000 Began month with unit at 100% power, 954 MWe.
April 13, 1996 1129 Commenced ramp down from 100% power, 956 MWe for l
Turbine Valve Freedom Test (TVFT).
1212 Unit stable at 91.4% power, 883 MWe.
1240 Commenced ramp from 91.4% power to 100% power after completion of TVFT.
1510 Unit stable at 100% power, 956 MWe.
April 30, 1996 2400 Ended month with unit stable at 100% power, 952 MWe.
l l
i l
l l
l i
t
l
\
l l
t Page 1 of __1 1
UNIT SHUTDOWN AND POWER REDUCTIONS i Explanation Sheet Docket No.: 50-338 ,
Report Month April Unit Name: NA-1 l 1
i Year 1996 Date: May 5, 1996 l
)
Contact:
W. R. Matthews l
i
\
- No Entries This Month. I l
l l'
1 l
2 i
1 I
i
. i
~
UNIT SHUTDOrt3S AND POWER REDUCTIONS DOCKET NO.: 50-338 UNIT NAME: NA-1 DATE: May 5, 1996 ,
REPORT MONTH: April 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1 2 3 4 5 Wo. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence O No Entry This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source
1
, . OPERATING DATA REPORT 4
, DOCKET NO.: 50-339
! DATE: May 5, 1996 i l'
[ CONTACT: W. R. Matthews .'l PHONE: (540) 894-2101 i i
i j OPERATING STATUS l
)
- 1. Un i t N am s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N or t h Anna 2 l
- 2. R epor t i s p Per i od s . . . . . . . . . . . . . . . . . . . . . . . . . Apr i l 1996 l
- 3. Licensed Thermal Power (MWt) ............. 2693 4.- Nameplate Rating (Gross MWe) ............. 979
- 5. Disign Electrical Rating (Net MWe):....... 907
- 6. ' MJtximum Dependable Capacity (Gross MWe):.. 944
- 7. MIximum Dependable Capacity (Net MWe) .... 897 1
I
- 8. .If changes occur in Capacity Ratings (!tems No. 3 thru 7) since last report, give reasons: N/A i
l l
l,
- 9. Power level to which restricted, if any (Net MWe): _ N/A l
l 10. Rrasons for restrictions, if any: N/A l l-l l
l i
i This Month' Y-t-D Cumulative
- 11. Hours i n R eport i ng Per i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 719.0 2,903.0 134,807.0
- 12. Nunber of Hours Reactor was Cr i t i cal . . . . . . . . . . . . . . . . . . . . . . 719.0 2,903.0 112, % 0.6 l 13. R1 actor Reserve Shutdown Hours............................ 0.0 0.0 6,535.0 l .14. Hours Generator 0n-Line................................... 719.0 2,903.0 111,826.1
! 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0 j 16. Gross Thermal Energy Generated (MWH) ..................... 2,079,578.0 8,396,173.9 304,373,412.6
- 17. Gross E lect ri cal Energy Generated (MWH) . . . . . . . . . . . . . . . . . . . 684,519.0 2,764,276.0 99,595,694.0
- 18. N1t Electrical Energy Generated (MWH)..................... 651,925.0 2,633,336.0 95,204,975.0
- 19. Unit Service Factor....................................... 100.0% 100.0% 83.0%
- 20. Unit Availability Factor.................................. 100.0% 100.0% 83.0%
- 21. Unit Capacity Factor (using MDC Net)...................... 101.1% 101.1% 78.5%
j 22. Unit Capacity Factor (using DER Net)...................... 100.0% 100.0% 77.9%
- 23. Forced Outage Rate........................................ 0.0% 0.0% 4.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A )
r j 25. If Shutdown at end of Report Period, estimated time of Startup: N/A
, 26. Units in Test Status (Prior to Comercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
)
l AVERAGE DAILY UNIT POWER LEVEL t
Docket No.: 50-339 Unit: NA-2 ,
Date: May 5. 1996 Contact W. R. Matthews l Phone: (540) 894-2101 MONTH: April 1996 I
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) i 1 907 17 907 2 907 18 908 l 3 908 19 902
! 4 906 20 906 l 5 906 21 907 ,
6 908 22 906 i 7 907 23 906 8 907 24 907 9 907 25 907 i 10 907 26 906 i l
11 908 27 907 l 12 908 28 907 j 13- 908 29 906 14 908 30 906 15 906 16 907 Instructions:
On this format, list the average daily unit power level in MWe-i Net for each day in the reporting month. Compute to the nearest whole megawatt. ,
I l
I i
)
, , NORTH ANNA POWER STATION l
, UNIT NO.:- 2 l MONTH: Acril l
SUMMARY
OF OPERATING EXPERIENCE ,
1 Page 1 of 1 Listed below in chronological sequence is a summary of op'erating experiences for this month which required load reductions or resulted in .
significant non-load related incidents. l l Date Time Data l
April 01, 1996 0000 Began month with unit stable at 100% power, 954 MWe.
l I
April 19, 1996 0921 Commenced unit ramp down for Turbine Valve Freedom Test (TVFT). Unit at 100% power, 952 MWe.
1035 Unit stabilized at 90% power, 876 MWe.
l 1112 Completed TVFT. Commenced ramp to 100% power.
l Unit at 90% power, 876 MWe.
1140 Unit stable at 100% power, 952 MWe.
( April 30, 1996 2400 Ended month with Unit stable at 100% power, 951
- Mwe.
I i
l t
l l
4 i
r e * - O I
9 Page 1 of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet l Docket No.: 50-339 Report Month April Unit Name: NA-2 Year: 1996 Date: May 5, 1996 l
Contact:
W. R. Matthews l
l l
l l
l l
l
DOCKET NO.: 50-339 . .
UNIT NAME: NA-2
- DATE: May 5, 1996 REPORT MONTH: April 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 ,
1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence
- No Entries This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source