Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
- _ _ _ _ _ _ _ - _
r VIHOINTA ELi:CTHIC AND POWP.H COMPANY Hacuxoxu,Viaorn:A 9a20:
Fe'o ruary 5,1998 United States Nuclear Regulatory Commission Serial No.98-083 Attention: Document Control Desk NAPS /JHL Washington, D. C 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
l VIRGINIA IELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the January 1998 Monthly Operating Report for North Anna Power Station Units 1 and 2.
r Very truly yours, D2W W. R. Matthews Station Manager Enclosure cc: U. S. Nuclear Regulatory Commission E
Region ll Atlanta Federal Center 61 Forsytti St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident inspector I /'
North Anna Power Station
_ ac3 I.llll...,,
llll1llllllOli, i.l 9802170119 980131 PDR ADOCK 05000338 1 R PM {
j
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION NONTHLY OPERATING REPORT MONTH: January Year: 1998 Approved:
(M
' Station Manager g .-- , ., -
~
I OPERATING DATA REPORT DOCKET No.: 50-338 DATE: February v.1998 CL.NTACT N. R. Matthews PHONE: (540) 894 2101 OPERAT!*3 STATUS 1, Unit Naeos., . . .... .. .. . . ... North Anna 1
- 2. Reporting Periods. . .. ... . . . . January
- 3. Licensed Thermal Power (MWt) . . 2,093
- 4. Nameplate Rati.ig (Gross MWeli.. .. .. 979.74
- 5. Design Electrical Rating (Not MWe):. . 907
- 6. .Naximum Dependable Capacity (Gross MWe) . 940
- 7. Maximum Dependable capacity (Net MWels.. . 893
- 8. It changes occur to Capacity Ratings (Items 3 thru 7) since last report, g;ve reasons: N/A
- 9. Power twvel to which restricted, if any (Not MWe)i N/A l 10. Reasons for restrictions, if any N/A f
This Month Y-t-D Cumulative i 11. Ects in Reporting Peried . ., . 744.0 744.0 171,924.0 I 13. Number of Houra Reactor was Critical. . . . . 144.0 144.0 133.999.0
- 13. Reactor Reserve Shutdown Hours. . .. . . 0.0 0.0 7,095.0
- 14. Hours Generator On Line. . . .... . .. . . 744.0 744.0 130,911.4 l 15. Unit Reserve Shutdown Hours.. . .. . .. . . 0. 0 - 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH). . . . 2,151,440.0 2,151,440.0 352,685,912.5 a7. Gross Electrical Energy Generated (MWM). . . . 702,902.0 702,902.0 152,873,555.0
- 18. Net Bloctrical Energy Generated (MWH). . .. 669,143.0 66e.163.0 109,0.3,346.0
- 19. Unit Service Factor. .. . . . . . . ... 100.0% 100.0% 76.1%
- 20. Unit Availability Factor. .. .. 100.0% 100.0%
76.1%
- 21. Unit Caaecity Factor (using MDC Net). .. 100.7n 100.7%
71.5%
- 22. Unit Capacity Factor (using DER Net). . . . . . 99.2% 99.2% 70.4%
- 23. Forced Outage Rate. . . . 0.0% 0.0%
8.3%
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, Duration _ N/A
- 25. If Shutdown at end of Report Period, estimated time of Startu N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
t
5 AVERAGE DAILY UNIT POWER LEVEL -
Docket No.: 50-338 Units- NA-1 Date Febt5. 1998
Contact:
W. R. Matthews Phone (540) 894-2101 MONTH JANUARY 1998
, DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWs-Net) 1 900 17 899 2 196 18 899 3 ER1 -19 899 4 900 20 899 5 900 21 899 6 __ 900 22 899 7 _ 900 23 899 8 __ 900 24- 900 _,
9 _ 900 25 . , _ _ . 899 _.
10 900 26 899 11 900 27 899 12 900 28 899 13 901 29- 899 14 900 30- 898 15 900 31 898 16 .
900 Instructions:
On this format,-list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
A.
NORTH ANNA POWER STATION UNIT NO.: J MONTH January 1998 SLM4ARY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological scquence is a summary of1 operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data January 1, 1998 0000 Began month in Mode 1 at 100% Power, 945 Mwe. g January 2,-1998 2200 Commenced ramp to 91% power for Turbine Valve Freedom Test (TVFT).
.Tanuary 2, 1998 2330 TVFT completed sat. Commenced ramp to 100%
power.
January 30,-1998 2310 Commenced-ramp to 91% power for TVFT.
-January 31, 1998 0010 TVFT completed sat. Commenced ramp to 100%
power.
. January 31, 1998.- _2400 3ided the month at 100% power, 943Mwe.
p
l DOCKET NO. 50-338 UNIT NAMES NA-1 mTE: February 5, 1998 4 CONTACTS W. R. Matthews Unit Shutoowns and Power Reductions ' en NE: (540) e n-2101 Report Month:' January 1998 .
1 2 3 1 5 Date Type Duration Reason Method of Licensee System Component Cause & Corrective No.
Shutting Event Code Code Action to (hrs)
Down Reactor Report i Prevent Recurrence
1 Y Type 2: Reason 3: Method 4:
F= Forced I.= Equipment Failure (explain) 1=Hanual Exhibit F - Instructious S= Scheduled B=Hain;enance or Test 2=Hanual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Red?tiction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-o161)
F= Administrative 9-Other 5:
G= Operational Error H=Other (explain) Exhibit H - Same Source e
_ _ _ _ _ _ _ _ _ _ _ . _ , _ _ , - _ - - _ . - - - . - _ ._ m
, OPERATING DATA REPORF e .
DOCERT NO.t 50-339 DATE: February 5, 1998 COWTACT: W. R. Matthews PHONE: (540) 894 2101 OPERATING STATUS
- 1. Unit Names. . .. .. .. .., .. . . . North Anna 2
- 2. Reporting pericis.. . .. . . . January
- 3. Licensed Thermal Power (MWtle. .. . . .. 2,893
- 4. Nameplete Rating (Gross MWe)s. ..... . 979
- 5. Design Electrical Rating (Not MWel:... .... 907
- 4. Maximum Dependable Capacity (Gioss awe) . . 944
- 1. Maximum Dependable Capacity (Net MWa) ... . 897
- 8. It changes occur to capacity Ratings (Items 3 thru 7) since last report, give reasonst N/
- 9. Power level to which restricted,12 any (Net MWe): N/A
- 10. Reasons for restrictions, if any: N/A l
l This Month Y-t-D Cumulative i
- f. 11. Hours in Reporting Period. . .. 744,0 744.0 150,192.0
_12. Number of Hours peactor was Critical. , . .-4.0 744.0 126,459.2
- 13. Reacto? Reserve Shutdown Hours. . . . . 0.0 0.0 7,184.2 2
- 14. Hours Generator on-Line. ... 744.0 744.0 125,266.2
- 15. Unit Reserve Shutdown Hours.. . 0.0 0.0 0.0
- 16. Cross Thermal Energy Generated (MWH) . 2,151,798.7 2,151.798.7 342,944,978.7
- 17. Gross Electrical Energy Generated (MWH) . . . ... bl .102 . 0 701.102.0 112,203,616.0
- 18. Net Electrical Energy Generated (MWH)... . . .. 647,510.0 667,510.0 107,195,478.0
- 19. Unit Service Factor. . . . . . . . 100.0% 100.0% 83.4%
- 20. Unit Aval16bility Factor. . ... . .. .. . . . 100.0% 100.0% 83.4%
- 21. Unit Capacity Factor (using MDC Net) .. . . . . .. ... 100.0% 100.0% 79.4%
- 22. Unit Capacity Factor (using DER Net). . .. , . 98.9% 98.9% 78.7%
- 23. torced Outage Rate., . . . . . . . . . . 0.0% 0.0% 5.0%
- 24. Shutdowna scheduled over Next 6 Months (Type, Date, Dut, tion of Each): Aefueling, April 5 , 1998 for 35 days
- 25. If Shutdown at end of Report Period, estimated time of Startu N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL E1.ECTRICITY COMMERCIAL OPERATION _
t
1
.g AVERAGE DAILY UNIT POWER LEVEL .
Docket No.: 50-339 Unit: NA-2 Date: Feb.5. 1998
Contact:
W. R. Matthews Phones (540) 894-2101
! i
' MONTH JANUARY 1998 l
l-
~
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Ne t) 1 898 17 896 2 898- 18 896 3 899 19 997 4 899 20 .897 5 899 21 897 ,
6 898 22 896
-7 898 23 896 8 898 24 895 9 898 25 897 10 898 26 896 11 898 27 S2E 12 898 28 897 13 898 29 897 14 897 30 897 15 896 31~ 897 M 895-Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in'the reporting month. Compute to the nearest whole megawatt.
-NORTH ANNA POWER STATION
.\
.~
UNIT NO : 2-MONTH: January 1998 T
SUbHARY OF OPERATING EXPERIENCE ,
Page 1 of 1 Listed below -in chronological -sequenco_ is a summary of' operating
- experiences for this month which required load reductions or resulted in lsignificant non-load related incidents.
i Dato Time ' Data '
Jan'1ary 1, 1998 0000 Began the month in Mode 1 100% Power 940 Mwe, January _23, 1998 2331 Commenced ramp to 93% power for Turbine Valve Freedom Test (TVFT).
-Janbary-24, 1998 0100 TVFT completed sat. Commenced ramp to 100%
power.
January 31, 1998- 2400 Ended the month at 100% power, 945 Mwe.
.. - u
~ - - ~ ' -
._.s-w . +-
DOCKET MO. 50-339 UNIT NME:- m-2 ,:
. Unit Shutdowns and Power Reductions' mTE Febnsry 5,1998 ~
"" " " "*tth'"*
Report Month: .Tanuary 1998 PHONE: (540) 894-2101 ', a 1 2 3 4 5 No. Date Type- Duration Reason Method of Licensee System Component dause & Corrective--
(hrs) Shutting Event Code Code- Action to Down Reactor Report 8 Prevent Recurrence i
'I
1: Type 2: Reason 31 Method 4s F= Forced A= Equipment rallure (explain) 1= Manual Exhibit F - lastructions S-Scheduled B-Maintenance or Test . 2= Manual Scram for preparStion of Data C=lefueling i 3= Automatic Scram Entry SheY.s for Licensee D=Pegulato' Restriction 4= Continuations Event Report (LERI File E=0perator Training & License Examination 5= Load Reduction (NUREG-0161) l F= Administrative 9-Other G= Operational Error 5:
H=Other (explain) Exhibit H - Some Source L- _ . _ _ _ _ _ _ _ _ _ _ . _
. . . . . . . . . . . . . . . _ . . . . . . - - . . . - . - . . , ., - - - . _ _ _ . . . _