MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
~ '
VINGINIA ELECTHIC AND POWER COMPANY H!CalMOND,VIHGINIA 202 61 April 7,1999 United States Nuclear Regulatory Commission Sorial No.99-188 ;
Attention: Document Control Desk NAPS /JHL l Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the March 1999 Monthly Operating Report for North Anna Power Station Units 1 and 2. Also enclosed is a corrected page from the February 1999 North Anna Unit 2 Monthly Operating Report.
Very truly yours, tuBw/Mn l W. R. Matthews Site Vice President I Enclosures Commitments made in this letter: None.
cc: U. S. Nwlear Regulatory Commission Region ll Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 i l
Atlanta, Georgia 30303
'yj9)
Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station
. ,1 9904130098 990331 DR ADOCK 050003 8 e
s
[ ..
l .
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION I l
MONTHLY OPERATING REPORT MARCH 1999 l
I i
l J
Approved; b g Vp 7 Site Vice President Date I
i i
OPERATING DATA REPORT Docket No.: 50-338 Date: 04/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101
- 1. Unit Name:.. -. . North Anna Unit 1
- 2. Reporting Period:. .. . .. .. . March,1939
- 3. Licensed Thermal Power (MWt):. . . . 2,893
- 4. Nameplate Rating (Gross MWe): .
979.74
- 5. Design Electrical Rating (Net MWe)L _ _ _
907
- 6. Maximum Dependable Capacity (Gross MWe): 940
- 7. Maximum Dependable Capacity (Net MWe): . 893
- 8. If Changes Occur in Capacily Ratings (Items Number ,'l Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A This Month Year To-Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0 182,100.0
- 12. Hours Reactor Was Critical 744.0 2,160.0 143,585.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 7,134.2
- 14. Hours Generator On-Line 744.0 2,160.0 140,419.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2,148,503.6 6,243,868.3 379,938,897.2
- 17. Gross Electrical Energy Generated (MWH) 724,525.0 2,087,021.0 161,844,891.0
- 18. Net Electrical Energy Generated (MWH) 691,182.0 1,989,523.0 118,350,761.0
- 19. Unit Service Factor 100.0 % 100.0 % 77.1 %
- 20. Unit Availability Factor 100.0 % 100.0 % 77.1 %
- 21. Unit Capacity Factor (Using MDC Net) 104.0 % 103.1 % 72.7 %
- 22. Unit Capacity Factor (Using DER Net) 102.4 % 101.6 % 71.7 %
- 23. Unit Forued Outage Rate 0.0% 0.0% 7.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End of Report Feriod, Estimated Date of Start-up:
- 26. Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPtiRATION ,
, e AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 04/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 l
MONTH: March,1999 I
( Average Daily Power Level Average Daily Power Level Day (MWe Net) Day (MWe . Net) __
1 920 17 ,
940 2 921 18 939 l 3 921 19 937 l
4 921 20 937 l
5 921 21 936 6 921 22 936 7 921 23 938 8 921 24 936 9 920 25 937 10 920 26 937 11 921 27 936 12 921 28 936 13 923 29 936 14 924 30 936 15 922 31 937 16 930 l
1 INSTRUCTIONS l
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to ;
the nearest whole megawatt.
]
a !
l .
l Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 04/05/99
Contact:
W. R. Matthews i
Telephone: (540)894 2101 il NORTH ANNA POWER STATION l UNIT NO.:,1 i MONTH: March 1999 i
l
SUMMARY
OF OPERATING EXPERIENCE l Page 1 of 1 l
l Listed below in chronological sequence is a summary of operating experiences for this month whien required load
- reductions or resulted in significant non-load related incidents.
DElf IltDR Etta March 1,1999 0000 Began the month in Mode 1,100% power,963 MWe, ,
I March 14,1909 1857 Nuclear instrumentation were adjusted down from 100% to 98% l power to match the feedwater flow based power.
March 16,1999 1045 Commenced power increase to 100%.
1415 Unit stable at 100% power,983 MWe.
March 31,1999 2400 Ended month in Mode 1,100% power,983 MWe.
l l
J
s 0 Docket No.: 50-338 Unit Name: North Anna Unit 1 i
Date: 04/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To oR GREATER THAN 20%)
REPORT MONTH: March,1999 (1) (2) (3) (4) (5)
Method l Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Reactor None during the reporting period.
(1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 -
Manual B- Maintenance or Test 2- Manual Scram C- Refueling 3- Automatic Scram D- Regulatory Restriction 4- Other (Explain)
E- Operator Training & Licensing Examination F- Administrative G- Operational Error (Explain)
(Q (5)
Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
OPERATING DATA REPORT l
Docket No.: 60-339 Dats: 04/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101
- 1. Unit Nar,.e- . .. .
North Anna Unit 2
- 2. Reporting Period:. . .. .. March,1999
- 3. Licensed Thermal Power (MWt):. 2,893
- 4. f' uneplate Rating (Gross MWe): . 979
- 5. Design Electrical Rating (Net MWe):.. .. . 907
- 6. Maximum Dependable Capacity (Gross MWe): . 944
- 7. Maximum Dependable Capacity (Net MWe): 897 i
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
1 N/A l
I
- 9. Power Level To Which Restricted, if Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A l This Montj) Year-To-Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0 160,368.0
- 12. Hours Reactor Was Critical 744.0 2,160.0 135,948.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 7,241.5
- 14. Hours Generator On-Line 744.0 2,160.0 134,733.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2,144,343.6 6,239,860.1 369,966,555.8 l 17. Gross Electrical Energy Generated (MWH) 710,565.0 2,045,582.0 121,002,498.0
) 18. Net Electrical Ene gy Generatefd (MWH) 677,486.0 1,948,643.0 115,562,716.0
- 19. Unit Service Factor 100.0 % t 00.0% 84.0 %
- 20. Unit Availability Factor 100.0 % 100.0% 84.0 %
- 21. Unit Capacity Factor (Using MDC Net) 101.5 % 100.6 % 80.1 %
- 22. Unit Capacity Factor (Using DER Net) 100.4 % 99.5% 79.4 %
- 23. Unit Forced Outage Rate 0.0% 0.0% 4.7%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Isown at End of Report Period, Estimated Date of Start-up: N/A
- 26. Unit in Test Status (Prior to Commercial Operation):
l FORECAST ACHIEVED l
lNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL
, , Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 04/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 MONTH: March,1999 l Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 899 17 920 2 898 18 918
! 3 898 19 912 l
l l 4 898 20 917 l 5 898 21 917 1
6 898 22 916 l
l 7 899 ,23 917 8 899 24 916 9 899 25 917 10 902 26 917 11 909 27 917 12 898 28 917 13 919 29 _
916 14 922 30 916
- 15 921 21 917 16 _
920 l
lNSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
1
d
.s Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 04/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.:_2 MONTH: March 1999
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summar' of operating experiences for the month which required load reductions or resulted in significant non-load related .ncidents.
2 319 Il!DR 9 818 March 1,1999 0000 Began the month in Mode 1,100% power,941 MWe.
March 8,1999 1818 Nuclear instrumentation were adjusted down from 100% to 98% power to match the feedwater flow based power.
March 10,1999 1230 Commenced ramp up to 100% power.
March 11,1999 1735 Unit at 100% power,959 MWe.
2007 Commenced ramp down to reseat "B" moisture separator reheater (MSR) poppet relief valve.
2054 Stabilized at 96.7% power,922 MWe. MSR poppet rehef valve reseated.
2324 Commenced power increase.
March 12,1999 2328 Unit at 100% power,959 MWe.
March 18,1999 2307 Commenced ramp down to 91% power,879 MWe for Turbine Valve Freedom Testing (TVFT).
March 19,1999 0051 TVFT complete satisfactority. Commenced ramp up to 100% power.
0442 Unit at 100% power,962 MWe.
March 31,1999 2400 Ended tne month in Mode 1,100% power,962 MWe. l I
l l
l
I .
s 9
Docket No.: 50-339 a '
Unit Name: North Anna Unit 2 l
Date: 04/05/99 i
Contact:
W. R. Matthews l Telephone: (540) 894-2101 l
l UNIT SHUTDOWN AND POWER REDUCTION
! (EouALTo oR GREATER THAN 20%)
l REPORT MONTH: March,1999 i
(1) (2) (3) (4) (5)
Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx None during the repordng period.
(1) (2) (3)
F: Forced REASON: METHOD: l S: Scheduled A- Equipment Failure (Explain) 1 - Manual l B- Maintenance or Test 2- Manual Scram l C- Refueling 3- Automatic Scram D- Regulatory Restriction 4- Other (Explain)
E- Operator Training & Licensing Examination F- Administrative ,
G- Operational Error (Explain)
(4) (5)
Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Sourco l
for Licensoo Event Report (LER) File (NUREG 0161)
I s a OPERATING DATA REPORT Docket No.: 50-339 Date: 03/05/99
Contact:
W. R. Matthews Telephone: (540)894-2101
- 1. Unit Name:. North Anna Unit 2
- 2. Reporting Period:. February,1999
- 3. Licensed Thermal Power (MWt):. 2,893
- 4. Nameplate Rating (Gross MWe): I 79
- 5. Design Electrical Rating (Net MWe):. 107
- 6. Maximum Dependable Capacity (Gross MWe): 944 I
- 7. Maximum Dependable Capacity (Net MWe): 897 '
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: ,
N/A j
- 9. Power Level To Which Restricted, if Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 672.0 1,416.0 159,624.0
- 12. Hours Reactor Was Critical 672.0 1,416.0 135,204.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 7,241.5
- 14. Hours Generator On-Line 672.0 1,416.0 133,989.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,943,803.4 4,095,516.5 367,822,212.2
- 17. Gross Electrical Ei .rgy Generated (MWH) 633,556.0 1,335,017.0 120,291,933.0
- 18. Net Electrical Energy Generated (MWH) 603,411.0 1,271,157.0 114,886,230.0
- 19. Unit Service Factor 100.0 % 100.0 % 83.9 %
- 20. Unit Availability Factor 100.0 % 100.0 % 83.9 % l
- 21. Unit Capacity Factor (Using MDC Net) 100.1 % 100.1 % 80.0%
- 22. Unit Capacity Factor (Using DER Net) 99.0% 99.0 % 79.4 %
- 23. Unit Forced Outage Rate 0.0% 0.0% 4.7%
l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each);
None
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A
- 26. Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _