VinciNir Eu:cTHIC ANI) IknVER CO%WANY RicaismNn, VimnNir 232<,1 a
June 7,1999 United States Nuclear Regulatory Commission Serial No.99-326 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2
~
MONTHLY OPERATING REPORT Enclosed is the May 1999 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours,
//
W. R. Matthews
/
Site Vice President Enclosure Commitments made in this letter: None.
{f cc:
U. S. Nuclear Regulatory Commission Region II Atlanta Federal Center i
61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station "T1% p* TR" ;
p 4
531 e
I' J.
1 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MAY 1999 i
1 I
1 Approved:
h h*I)
Site Vice President Date h
1 J
OPERATING DATA REPORT Docket No.: 50-338 Date: 06/04/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 1.
Unit Name:.
North Anna Unit 1 2.
Reporting Period:.
May,1999 3.
Licensed Thermal Power (MWt):.
2,893 4.
Nameplate Rating (Gross MWe):
979.74 5.
Design Electrical Rating (Net MWe):..
907 6.
Maximum Dependable Capacity (Gross MWe):..
940 7.
Maximum Dependable Capacity (Net MWe):
893 f
I 8.
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe): N/A 10.
Reasons For Restrictions,If Any:
N/A This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 744.0 3,623.0 183,5G3.0
- 12. Hours Reactor Was Critical 744.0 3,623.0 145,048.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 7,134.2
- 14. Hours Generator On-Line 744.0 3,623.0 141,882.8
- 15. Unit Reserve Snutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2,138,577.8 10,459,695.1 384,154,724.0
- 17. Gross Electrical Energy Generated (MWH) 723,587.0 3.515,004.0 163,272,874.0
- 18. Net Electrical Energy Generated (MWH) 689,129.0 3,350,389.0 119,711,627.0
- 19. Unit Service Factor 100.0 %
100.0 %
77.3 %
- 20. Unit Availability Factor 100.0 %
100.0 %
77.3 %
- 21. Unit Capacity Factor (Using MDC Net) 103.7 %
103.5 %
73.0 %
- 22. Unit Capacity Factor (Using DER Net) 102.1 %
102.0 %
71.9 %
- 23. Unit Forced Outage Rate 0.0%
0.0%
7.7%
I 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
26.
Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 06/04/99
Contact:
W, R. Matthews Telephone: (540) 894-2101 MONTH:
May,1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net)
Day (MWe - Net) 1 936 17 932 2
936 18 934 3
936 19 934 4
936 20 934 5
935 21 934 6
934 22 933 7
935 23 932 8
935 24 932 9
935 25 932 l
10 934 26 914 11 934 27 913 i
l 12 934 28 921 13 932 29 932 14 934 30 932 15 750 31 932 16 934 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
u
F l
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 06/04/99
Contact:
W. R. Matthews Telephone: (540)894-2101 l.
NORTH ANNA POWER STATION l
UNIT NO.:.1 MONTH: May 1999
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DAlf IllDS Ealt May 1,1999 0000 Began the month in Mode 1,100% power,982 MWe.
May 15,1999 0518 Ramped down to 60% power,567 MWe, for bus duct cooling maintenance.
May 15,1999 1826 Ramped unit back to 100% power,982 MWe, following completion of bus duct cooling maintenance.
May 31,1999 2400 Ended month in Mode 1,100% power,980 MWe.
i
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 06/04/99
Contact:
W. R. Matthews Telephone: (540)894 2101 UNIT SHUTDOWN AND POWER REDUCTION (EcuALTo oR GREATER THAN 20%)
REPORT MONTH: May,1999 (1)
(2)
(3)
(4)
(5)
Method Duration of LER No.
System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Reactor None during the reporting period.
(1)
(2)
(3)
F: Forced REASON:
METHOD:
S: Scheduled A-Equipment Failure (Explain) 1 Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
(4)
(5)
Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) o
2e OPERATING DATA REPORT Docket No.: 50-339 Date: 06/04/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 1.
Unit Namen North Anna Unit 2 2.
Reporting Period:.
May,1999 3.
Licensed Thermal Pcwer (MWt):-
2,893 4.
Nameplate Rating (Gross MWe):..
979 5.
Design Electrical Rating (Net MWe):.
907 6.
Maximum Dependable Capacity (Gross MWe):..
944 7.
Maximum Dependable Capacity (Net MWe):.
897 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe): N/A 10.
Reasons For Restrictions,if Any-N/A This Month Year To-Date Qumulative 11, Hours in Reporting Period 744.0 3,623.0 161,831.0 12.
Hours Reactor Was Critical 744.0 3.623.0 137,411.2 13.
Reactor Reserve Shutdown Hours 0.0 0.0 7,241.5 14.
Hours Generator On-Line 744.0 3,623.0 136,196.3 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 2,145,379.4 10,459,607.3 374,186,303.0 17, Gross Electrical Energy Generated (MWH) 713,784.0 3,449,069.0 122,405,985.0 18.
Net Electrical Energy Generated (MWH) 679,003.0 3,284,548.0 116,898,621.0 19.
Unit Service Factor 100.0 %
100.0 %
84.2 %
20.
Unit Availability Factor 100.0 %
100.0 %
84.2 %
21.
Unit Capacity Factor (Using MDC Net) 101.7 %
101.0 %
80.3 %
22.
Unit Capacity Factor (Using DER Net) 100.6 %
100.0 %
79.6 %
23.
Unit Forced Outage Rate 0.0%
0.0%
4.7%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
30 Day Refuelino Outaoe - September 1999
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
N/A
- 26. Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
]
r AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 06/04/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 MowrH:
May,1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net)
Day (MWe - Net) 1 916 17 910 2
916 18 912 3
915 19 913 4
914 20 913 5
913 21 914 6
914 22 913 7
913 23 912 8
913 24 912 9
913 25 913 10 913 26 913 11 913 27 913 12 912 28 913 13 912 29 913 14 910 30 912 15 909 31 912 16 909 1
4 INSTRUCTIONS i
On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
L
s Docket No.: 50-339 Unit Name: North Anna Unit 2 Date:
06/04/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.:.2 MONTH: May 1999
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
ERif
.IllIlf ERlB May 1,1999 0000 Began the month in Mode 1,100% power,960 MWe.
May 14,1999 0338 Pressurizer Power-Operated Relief Valve (PORV),2-RC-PCV-2455C, opened due to pressurizer master pressure controller failure causing reactor coolant system (RCS) pressure to decrease to 2150 psig. Entered Technical Specification 3.2.5 Action for pressurizer pressure dropping below 2205 psig.
Entered Abnormal Procedure 2-AP-44, Loss of Reactor Coolant System Pressure. Manually closed the PORV and placed the master pressure controller in manual to control RCS pressure.
0342 RCS pressure was returned to greater than 2205 psig. Technical Specification 3.2.5 Action was cleared.
0343 2-AP-44 was exited.
1506 The pressurizer master pressure controller was returned to automatic following replacement of three control cards.
May 31,1999 2400 Ended the month in Mode 1,100% power,951 MWe.
i i
i
e e
e.
Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 06/04/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAi.To on GREATER THAN 20%)
REPORT MONTH: May,1999 (1)
(2)
(3)
(4)
(5)
Method Duration of LER No.
System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx None during the reporting period.
(1)
(2)
(3)
F: Forced REASON:
METHOD:
S: Scheduled A-Equipment Failure (Explain) 1 Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
(4)
(5)
Exhibit G -Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)