Issue date | Title | Topic | |
---|---|---|---|
ML20217N928 | 20 October 1999 | Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised | |
ML20217H363 | 14 October 1999 | Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su | |
ML18152A281 | 12 October 1999 | Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. | Liquid penetrant |
ML20212J925 | 1 October 1999 | Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant | VT-2 |
ML20217D685 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20211N261 | 8 September 1999 | Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable | |
ML20211J256 | 31 August 1999 | Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 | |
ML20216E501 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with | |
ML20211J242 | 31 August 1999 | Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 | Earthquake |
ML20210T079 | 13 August 1999 | Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable | |
ML20210S141 | 31 July 1999 | Monthly Operating Repts for July 1999 for North Anna Power Station.With | |
ML20210Q993 | 31 July 1999 | Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud | |
ML20209E564 | 30 June 1999 | Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With | |
ML20195G190 | 31 May 1999 | Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with | |
ML20206L483 | 10 May 1999 | SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping | Probabilistic Risk Assessment Incorporated by reference |
ML20206Q667 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20205S039 | 21 April 1999 | SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) | Nondestructive Examination VT-2 Flow Accelerated Corrosion Moisture barrier |
ML20205K304 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20207K592 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20207E173 | 18 February 1999 | Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year | |
ML20205A024 | 31 December 1998 | Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Stroke time Post Accident Monitoring Hydrostatic Enforcement Discretion Coatings Temporary Modification Aging Management Foreign Material Exclusion Feedwater Heater Stress corrosion cracking License Renewal Exemption Request Earthquake Pressure Boundary Leakage Fire Protection Program Overspeed trip Overspeed Control Room Habitability |
ML20199C878 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With | |
ML20198H954 | 3 December 1998 | Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant | Time of Discovery Nondestructive Examination Through-Wall Leak Through-Wall Leakage Operability Assessment |
ML20198J556 | 3 December 1998 | ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps | |
ML20197G855 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With | |
ML20196G138 | 3 November 1998 | Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit | Time of Discovery Nondestructive Examination Operability Determination Through-Wall Leak Through-Wall Leakage Operability Assessment |
ML20195D057 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With | |
ML20154L069 | 14 October 1998 | COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy | |
ML20155J691 | 9 October 1998 | Staff Response to Tasking Memorandum & Stakeholder Concerns | Probabilistic Risk Assessment License Renewal Backfit |
ML20154H400 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With | |
ML20151X801 | 10 September 1998 | Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section | |
ML20151W471 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With | |
ML20237A434 | 31 July 1998 | Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 | |
ML20236V125 | 14 July 1998 | ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis | Boric Acid Packing leak Hydrostatic VT-2 |
ML20236K553 | 7 July 1998 | SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment | High Energy Line Break |
ML20236M338 | 30 June 1998 | Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 | |
ML20248M101 | 31 May 1998 | Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 | |
ML20248C883 | 29 May 1998 | SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program | Incorporated by reference |
ML20247K928 | 15 May 1998 | Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary | |
ML20216A897 | 6 May 1998 | Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 | |
ML20247F444 | 30 April 1998 | Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 | |
ML20217B532 | 20 April 1998 | Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs | High Radiation Area Hydrostatic VT-2 Liquid penetrant |
ML20217H961 | 7 April 1998 | Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed | |
ML20216B189 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 | |
ML20216E880 | 6 March 1998 | Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) | Incorporated by reference |
ML20216E256 | 28 February 1998 | Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 | |
ML20199J643 | 2 February 1998 | Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 | Through Wall Leak Operability Assessment |
ML20202D581 | 31 January 1998 | Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 | |
ML20198S757 | 15 January 1998 | Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping | |
ML20198P135 | 31 December 1997 | Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 |