Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
.
4; #e
- VIHOINIA ELI:CTHIC AND r OWi!H COMPANY Hicitwoxn,Vanornir unus January 12,1998 United States Nuclear Regulatory Commission Serial No.98-025 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2
, MONTHLY OPERATING REPORT Enclosed is the December 1997 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, UAW W W. R. Matthews Station Manager Enclosure l
cc: U. S. Nuclear Regulatory Commission l Region ll Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 y ") (< gf Mr. M. J. Morgan
'b I l
- NRC Senior Resident inspector North Anna Power Statyn 9901220015 971231 PDR ADOCK 05000338 R PDR I, I , , ,l ,
. .. ~ . . - . - . . , .. ... - _ = , - . . . - . . .
=.
e t
VIRG.TNI#. POWER COMPANY NORTH ANNA POIGR STATION MONTHLY OPERATING REPORT MONTH: December Year: 1997 i
i
(
L Approved:
~~
l_
Station Manager
w OPERATING DATA REPORT DoctET No.1 ' 50-338 DATE: January 5, 1998 CONTACTS W. p. Matthews PHDNE: ($40) 094-2101 Ot%ATING STATUS
- 1. Urd t Name s . . . . . . . . . . . . .. . . . . North Anna 1
- 2. Poport.ing Periode..... . ........., ......, Deces4+r 91
- 3. U censed Thermal Power (MWt) t . . . .. . ... 2,993 4, Naseriete Pating (Gross MWe) . . . . ... 979.14 '
S. Deatyn Electrical Petitig (Wet HWe) ... ..... 901
- 6. Hazie.m Dependable capacity (Gross MWe) .. .. 940
- 7. Maulamm !=pendable capacity (Not MWe) t.. .. . 993
- 9. If ct.angea cceur to Capacity patings (1tene 3 thru 71 since last report, give reasons: N/A
- 9. I'3wer level to Alch restricted, if any (Net HWel t N/A
- 10. Aeesans fu sestrictions, if anyt N/A Ttds Montt Y-t-D Cumulative
- 11. Hauts In poporting Period. ....... . .. .. .. . .. 744.0 8,760.0 171,190.0
- 12. Nwrter of Haurs Peactor was Critical. .. . .. . . ... . 744.0 4,037.0 133,255.0
- 13. Reactor beserve Shutdown Hours. .... . . . ... .. .. 0.0 49.0 1,095.0
- 14. Haurs Generator On-Line. .. . . .. . .. .. 744.0 7,99).6 130,1E7.4 16, Urdt Peserve Shutdown Hours. . . , . . . 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH).... . . . .. ... 2,151,676.5 22,953,935.9 350,534,472.5
- 17. Gross Electrical E.norgy Generated (MWM). . . . .. 705,093.0 7,527,967.J 152,170,E53.0 te. Net tieetrical Energy Generated (MWIO. . . 671,574.0 7,1* T,52 9. 0 109,144,183.0
- 19. Unit Service Factor. . . . . .. . ... . ... . . . 100.0% 91.3% 76.04
- 20. Unit Avallability Factor. . .... .. . .... . , . 100.06 91.3% 16.06
- 21. Unit capacity f actor (using MDC Net) . .. . . ... .. .... 1C1.1% 91.*4 12.0%
- 22. Unit Capacity Factor (usir - DER Net) . .. . . . .. . . 99.5% 90.1% 70.3%
- 23. Forced outage e s te. , . .. ...... . .. . 0.0% 0.04 8.3%
- 24. Shutdowns acheduled over Next 6 Months (Type, Dete, Ouration of Eac _ N/A
- 25. If Shutd>wn at and of Peport Period, estimated time of Startup N/A
- 26. Unita in Test Ota* es (trior to coamercial Cperation):
Torecast Achieved INITIAL CRITICALITY INITI AL ELEL"fRICITY CtattERCIAL OPERATION
l i
i AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 <
Unit NA-1 Date: Jan 5.1998
Contact:
W. R. Matthews Phone (540) 894-2101 MONTH December 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t) LEVEL (MWe-Net) 1 904 17 903 __
2 905 18 903 3 905 19 904 4 905 20 903 5 903 21 903 6 903 22 902 7 904 33 902 8 904 24 901 9 903 25 902 10 902 26 901 11 903 27 901 12 902 28 901 13 902 29 901 14 903 30 900 15 903 31 900 16 903 Instructions:
On this format, list the average daily unit power level in MWe-Net for each-day in the reporting month. Compute to the nearest whole megawatt.
NORTH ANNA POWER STATIONi ,
UNIT NO.: -1 :I MONTH Dece E r 1997--
- SLM4ARY OF OPEPATING EXPERIENCE Page 1 of 2 l J
~
, Listed below in -chronological sequence is a summary 'of- operating
-. experiences for this month which required load- reductions or- resulted in significant non-load related incidents.
Date Time: Data December 1,-1997 0000 Began month in Mode 1 at 100% Power, 947 Mwe. [
j December 5, 1997- 2303 Commence r'.tp down for Turbine Valve E. a dom l Test. ,
J December 5, 1997 2357 Turbine Valve Freedom Test Complete Sat commencing ramp to 100% Power from 91% Power.
December 6, 1997 0045 Ended the month in Mode 1 at 100% Power, L 945 Mwe.
i s
L i
t f
i i :
___ _ _ _ _ r _ .
, 2 emf 1T SBUTDOINS AIS N ItMDUCTI(MIS .
DOCKET No.: 50-338 UNIT Miws: FA-1 '
mTE: Jan: 5, 1998 -
REvoRT MONTH: DECEMBER 1997 contacts w. R. Matthews PHONE: ($40) 894-2101 ,
1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Compment Cause & Corrective (hrs) Shutting Event Code Code Action to ,
Down Reactor Report f Prevent Recurrence
in Type 2: Reason 3: Method 4
- thForced A= Equipment Failure (explain) 1-Manual Exhibit F - Instructions 8-Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C-Refueling 3= Automatic Scram Entry Sheets for Licensee, D= Regulatory Restriction 4=Continisations Event Report (LER) File E= operator Training & License Examination 5= lead Reduction (NUREG-01611 F=Adminiatrative 9-Other
H=Other (explain)
Exhibit H = Same Source 1
e
~
s e r g +
e p M., ,
O g & * *
+
a
OPERATING DATA REPORT. i toCrt f N:). i 50 H9
. . DATE: January 1, 1995 CONTACTt W. R. Matthews PHONEt (540) 894 2101 OPEPATING STATUS 1, thal t Namei . North Anna 2
- 2. Deportir4; Fariodi, , , December
- 3. Licensed Therml Tower (MWti t. . 2,893
- 4. Nameplate Rating (Oroes $1els. 979
-1, Design Electrical Rating (Not HWelt, , , , 907
- 6. Maximum Dependable capacity (Gross MWelt. 944 7 Maximusi Dependatie capacity (Net MWels., 897 4, it changes occur to Capa'ity Ratinge (1tems 3 thru 7) since last report, give reasons: N/A
- 9. Power level to which restrictad, if any (Net MWel N/A
- 10. Reasvns for teatrictiona, /s N/A This Month Y t-D Cumulative 11, Hours in Reporting Period. 744.0 8,760.0 149,448 0 Number of Hours Reactor was Critical, 744,0 4,760.0 125,715.2
- 12. ,,
- 13. Reactor Reserve Shutdown Hours. . 22.0 22.0 1,184.2
- 14. Uours Generator on.t.ine. . 722.0 8,738.0 124,522.2 15, Unit Rese;ve Shutdown Hours. 0.0 0.0 0.0
- 16. Gross The mal Energy Generated (MWH) . 2,030,558.8 25,21b262,0 340,793.160.0
- 17. Gross Electrical Energy Generated fMWH), 659,739,0 8,233,279.0 111,502,514.0
- 18. Het Electrieel Rnergy Oenerated (MWHl. . 427,376.0 7,834,786.0 106,527,968,0
- 19. Unit Service Factor. . . 97.0% 99.7% 63.3%
- 20. Unit Avstlability Factor. . . . . 97.0% 99.7% B3.3%
- 21. Unit Capacity Facter f using MDC Net) . 94.0% 99.7% 79.3%
- 22. Unit Capacity Factor (using DER Net) . 93.0% 94.6% 78,6%
- 2L Forced Outage Rate. ,
3,0% 0.3% 5.1%
- 24. - Shutdowns scheduled Over Next 6 Months (Type. Date, Duration of Each}i Refuelina. April 5 1998 for 35 days
- 25. If Shutdown at end of Report Pernod, estimat ed time of Startupi N /A 26, twita in Test. Status 1 prior to Commercial Operation):
o Forecast Achieved INITIA1. CRITICA1.!TY -
INITIAL ELECTRICITY COMMERCIAL OPERATION _
7.-
AVERAGE DAILY UNIT PCMER LEVEL !
Docket No. :' 50-339 -
. Unit: NA-2 Date:' January 5, 1998 ;
Contact:
W. R. Matthews Phone:' (540)- 894-2101 {
+
HONTH December 1997 s
-DAY- AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net)-
1- 901 17 ~
900 2 902 18 900' 3 902 19 901 4 902 20 902 900 5 902 21 6 901 22 62 7 902 23 300 8- 902 24 569 9 902 25 899 10 900 26 899 ,
.11 898 27 899 12 901 28 899 _
13 900 29 898 14- 900 30 898
. 15 900 31 898 16 900-Instructions:.
On this format, list the average daily unit power level in MWe-
. Net for each day _ in_ the- reporting month.
Compute to the nearest
-whole megawatt.
4 u
+
, *=
. NORTH ANNA POWER STATIOtf +
UNIT NO.:'2 '
MONTH: December 1997
~
SUt4%RY OF OPERATING EXPERIENCE -
-Page 1-of 1 Listed below in chronological sequence is a summary of operating experiences for ,this month which required load reductions or resulted - in significant non-load related incidents.
Date Time Data December 1, 1997 0000 Began the month in Mode 1 100% Power, 940 Mwe.
December 21,~1997 2328 Cotamenced ramping unit off-line due to EHC
- leak.
U December 22, 1997 0352 Removed from grid and secured Unit 2 main generator. Unit stable at 12% Power.
-December 23, 1997 0150 Repairs complete. Synchronizeded the generator on line.
December 23, 1997 0300 Holding power at 30% Power, 261 Mwe to initiate warmup of MSR'S and to replace Delta T control card in protection cabinet.
December 23, 1997 0447 Resumed ramp from 30%, 260 Mwe.
December.23, 1997 0500 Holding ramp at 36%, 300 Mwe while continuing to place MSR'S in service.
December 23, 1997 0552 Recommenced ramp from 36%, 300 Mwe.
December.' 23,-1997 0715 Holding reactor power at 47%-by calorimetric due to CPTR of 1.03.
December 24,.1997- 1145 2-PT-23 (OPTR) completed sat, 1.015 commencing rampup.
--December 24,-1997- 2232 Stabilized unit at 100% Power, 940 Mwe..
December;31, 1997 2400 Ended-the month in mode 1 100% Power 940 Mwe.
p r --n . - 4 s y ni __ , - - a
-m - +.pw
6 1MZt M AM> M M t1MR ~ '
o s
DOCKET NO.s 50-339 tJNIT MNE: MA-2 DnTE: :Jan: 5, 1998 -
REPORT MONTH: DECEM2ER 1997 contact: w. R. natthews PHONE: (.9 40) 894-2101 1 2 3 ~4 5 No. Date Type Duration Reason Method of Licensee System Component thra) Cause & Corrective Shutting Event Code Code Action to Down R. actor R. port a prevent Recurrence 97-2 971222 F 22. HOURS A NA NA liA NA NA RAMPED UNIT DOWN TO APPROXIMATELY 10% POWER, TRIPPED THE' TURBINE TO REPAlR LEAK ON EHC SYSTEM. REACTOR REMAINED AT APPROXIMATELY 10% POWER.
- la Type 2: Reason 3: Method 4: ,
NForced A= Equipment Failure (expla!nl 1= Manual Exhibit r - Inst uctions
, S= Scheduled I>' Maintenance or Test 2= Manual scram for properation of Data -
CwRefueling 3= Automatic Scram Entry Sheets for Licensee D-Regulatory Restriction 4= Continuations Event Report (LER) File E=0perator Training & License Examination 5=Imad Reduction (NUREG-0161)
FAdminiatrative 9=other
H=0ther (explain)
Exhibit H - Some Source t
.[
t
'1
.. +