ML20106H063
| ML20106H063 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 02/29/1996 |
| From: | Bowling M, Stall J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 96-124, NUDOCS 9603200145 | |
| Download: ML20106H063 (11) | |
Text
-
VIRGINIA ELecTHIC AND PowcH COMPANY RIcuMown, VIRGINIA 20261 March 11, 1996 l
l l
U. S. Nuclear Regulatory Commission Serial No.96-124 Attention: Document Control Desk NL&OS/JHL/ CMC Washington, D.C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
~%
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the February 1996 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, M. L. Bowling, Manager Nuclear Licensing and Operations Support Encl.,sure cc:
U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW Suite 2000 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 180094
/ /k 9603200145 960229 PDR ADOCK 0500o338
\\
R PDR
.. ~
I l
l l
l l
t VIRGINIA POWER COMPANY NORTH ANNA' POWER STATION MONTHLY OPERATING REPORT i
i MONTH:
Februarv YEAR:
1996 8
)
i Approved:
g Station Manager i
i
~~--
_-.~
l l
a' OPERATING DATA REPORT t
e DOCKET No.:
50-338 DATE: March 5, 1996 CONTACT: J. A. Stall PHONE: (540) 894-2101 OPERATING STATUS 1.
Unit Name:................................ North Anna 1 2.
Reporting Period:......................... February 1996 3.
Licensed Thermal Power (MWt):.............
2,893 4.
Nameplate Rating (Gross MWe):.............
994 i
5.
D3 sign Electrical Rating (Net MWe):.......
907 6.
M ximum Dependable Capacity (Gross MWe):..
940 7.
M ximum Dependable Capacity (Net MWe)....
893 l
f l
8.
If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons: _ N/A i
t 9.
Power level ts which restricted, if any (Net MWe): _ N/A l
- 10. Ratsons for restrictions, if any:
N/A I
i l
This Month Y t-D Cumulative l
- 11. Hours in Reporting Period.................................
6%.0 1,440.0 155,076.0
- 12. Number of Hours Reactor was Critical......................
242.2 986.2 118,172 A l
- 13. Rractor Rescrve Shutdown Hours............................
12.4 12.4 6,%3.8 l
- 14. Hours Generator 0n-Line...................................
241.4 985.4 115,172.9 1
- 15. Unit Reserve ?hutdown Hours...............................
0.0 0.0 0.0 I
r
- 16. Gross Thermut Energy Generated (MWH)......................
481,363.3 2,206,028.0 307,519,765.1 l
- 17. Cross Electrical Energy Generated (MWH)...................
158,773.0 725,160.0 101,043,495.0
. 18. N3t Electrical Energy Generated (MWH).....................
148,620.0 682,903.0 95,724,057.0
(
- 19. Unit Service Factor.......................................
34.7%
68.4%
74.3%
- 20. Unit Availability Factor..................................
34.7%
68.4%
74.3%
- 21. Uni t capac i ty Fac t or ( us i ng MDC Net )......................
23.9%
53.1%
69.1%
- 22. Unit Capacity Factor (using DER Wet)......................
23.5%
52.3%
68.1%
- 23. Fcreed Outage Rate........................................
0.0%
0.0%
9.3%
i
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_ Refueling Outage Scheduled fcr February 10, 1996, Duration 29 Days
- 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
- 26. Units in Test Status (Prior to Conenercial Operation):
j Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMFRCIAL OPERATION J
i
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unit:
NA-1 Date:
March 5, 1996 Contact J.
A. Stall Phone:
(540) 894-2101 MONTH: February 1996 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Ne t) 1 641 17 0
2 640 18 0
3 636 19 0
4 626 20 0
5 625 21 0
6 616 22 0
7 607 23 0
8 609 24 0
9 607 25 0
10 581 26 0
11 3
27 0
12 0
28 0
13 0
29 0
14 0
15 0
16 0
Instructions:
On this format, list the average daily unit power level in'MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
c NORTH ANNA POWER STATION UNIT NO.:
1 MONTH:
February
SUMMARY
OF OPERATING EXPERIENCE i
l Page 1 of 1 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in H
significant non-load related incidents.
Date Time-Data j
i February 01, 1996 0000 Began month in end-of-cycle coastdown with unit f
l at 72% power, 686 MWe.
1 l
February 10, 1996 2110 Commenced ramping unit off-line in preparation L
for scheduled refueling outage.
Unit at_67.4%
power, 648 MWe.
l l
February 11, 1996 0121 Unit taken off-line for scheduled refueling outage.
l 0133 Unit entered Mode 2.
0210 Unit entered Mode 3.
L i
1020 Unit entered Mode 4.
1436 Unit entered Mode 5.
i February 14, 1996 1604 Unit entered Mode 6.
)
February 20, 1996 0637-Unit defueled.
February 29, 1996 0453 Commenced core onload.
Unit entered Mode 6.
February 29, 1996 2400 Ended month with unit in Mode 6, reactor fuel onload in progress.
1 L
l l
l l
i l
l
Page 1
o f __1_
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month February Unit Name:
NA-1 Year:
1996 Date: March 5, 1996
Contact:
J.
A.
Stall i
l
- 96-01 February 11, 1996 Unit manually taken off-line at 0121 hours0.0014 days <br />0.0336 hours <br />2.000661e-4 weeks <br />4.60405e-5 months <br /> and shutdown for normally scheduled refueling outage.
1, i
l l
r o
W 4
1 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-338 UNIT NAME:
NA-1 DATE: March 5, 1996 REPORT MONTH: February 1996 CONTACT: J. A.
Stall PHONE: (540) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence 96-01 960211 S
454.6 C
1 N/A N/A N/A 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F-Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
OPERATING DATA REPORT DDCKET NO.:
50-339 DATE: March 5,1996 CONTACT:
J. A. Stall PHONE: (540) 894-2101 OPERATING STATUS
)
1.
Un i t N ame :................................ N or t h Anna 2 2.
Repor t i ng Per i od:......................... F ebruary 1996 3.
Licensed Thermal Power (Mut):.............
2893 4.
Nameplate Rating (Gross MWe):.............
9 79 1
5.
Disign Electrical Ratinc (Net MWe):.......
907
]
6.
MIximum Dependable Capr - / (Gross MWe):..
944 7.
Maximum Dependable Capacity (Net MWe):....
897 8.
If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A i
1 9.
Power level to which restricted, if any (Net MWe): ____N/A
- 10. Rrasons for restrictions, if any:
N/A This Month Y-t-D Cunulative
- 11. H ours i n R epor t i ng Per i od.................................
696.0 1,440.0 133,344.0
- 12. Number of Hours Reactor was Critical......................
696.0 1,440.0 111,497.6
- 13. R: actor R eserve Shutdown Hours............................
0.0 0.0 6,535.0
- 15. Hours Generator 0n-Line...................................
696.0 1,440.0 110,363.1
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated ( MWH)..................... 2,013,183.6 4,164,626.5 300,141,865.2
- 17. Gross E lect r i ca l Energy Generat ed (MWH )...................
662,520.0 1,372,448.0 98,203,866.0
- 18. 02t Electrical Energy Generated (MWH).....................
631,198.0 1,307,641.0 93,879,280.0
- 19. Unit Service Factor.................................
100.0%
100.0%
82.8%
s...
- 20. Uni t Avai labi l i ty Factor..................................
100.0%
100.0%
82.8%
- 21. Unit capacity Factor (using MDC Net)..........
101.1%
101.2%
78.3%
- 22. Uni t Capaci ty Factor (usi ng DER Net )......................
100.0%
100.1%
77.6%
- 23. F rced Dutage Rate........................................
0.0%
0.0%
4.8%
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A l
l l
- 25. If Shutdown at end of Report Period, estimated time of 1.tartup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERCIAL OPERATION l
l
l AVERAGE DAILY UNIT POWER LEVEL l
l Docket No.:
50-339 Unit NA-2 Date:
March 5, 1996 Contact J.
A. Stall Phone:
(540) 894-2101 I
l l
MONTH: February 1996 i
I DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER 5
LEVEL (MWe-Net)
LEVEL (MWe-Net) l 1
911 17 906 l
2 911 18 906 3
911 19 906 4
911 20 906 5
911 21 906 6
911 22 906 l
7 910 23 906 8
906 24 907 i
9 906 25 906 10 907 26 906 11 904 27 906 12 904 28 906 13 906 29 905 14 907 15 907 16 902 l
l
[
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l l
. -. ~. -. -.
_ ~ ~.... - - ~
NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:
February
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load - reductions or resulted in significant non-load related incidents.
l Date Time Data February 01, 1996 0000 Began month with unit stable at 100% power, 954 MWe.
February 16, 1996 0808 Commenced unit ramp-down for Turbine Valve Freedom Test.
Unit at 100% power, 953 MWe.
0841 Unit stable at 90% power, 859 MWe.
0905 Commenced unit ramp-up following Turbine Valve Freedom Test.
Unit at 90% power, 860 MWe.
0941 Unit stable at 100% power, 947 MWe.
February 29, 1996 2400 Ended month with unit stable at 100% power, 951 Mwe.
i
{
r
- 7..
l l
![..
Page 1
of __1 l
UNIT SHUTDOWN AND POWER REDUCTIONS l
Explanation Sheet Docket No.:
50-339 Report Month February Unit Name:
NA-2 Year:
1996 Date: March 5, 1996 1
l
Contact:
J.
A.
Stall l
l l
- No entries this month.
l l
I i.
I I
J l
I I
i l
S W
8 5
e-DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: March 5, 1996 REPORT MONTH: February 1996 CONTACT: J. A.
Stall PHONE: (540) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence
- No Entries This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examinat. ion 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
i H=Other (explain)
Exhibit H - Same Source
.