VIRGINIA ELecTnic Ann Powen Coxiwxy RIcstxonn,VIltOINIA 20261 J
August 7,1996 United States Nuclear Regulatory Commission Serial No.96-401 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 1
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT
)
Enclosed is the July 1996 Monthly Operating Report for North Anna Power Station Unit 1 and 2.
Very truly yours, 1
b hr W. R. Matthews Station Manager Enclosure cc:
U. S. Nuclear Regulatory Commission Region 11 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323
\\ \\
Mr. R. D. McWhorter NRC Senior Resident inspector L
North Anna Power Station 7
9608130310 960731 PDR ADOCK 05000338 R
.=
i VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:
Julv YEAR:
1996 Approved:
g Station Manager
1 OPERATING DATA REPORT 1
DOCKET NO.:
50-338 DATE: August 5,1996 CONTACT: W. R. Matthews l
PHONE: (540) 894-2101 OPERATING STATUS 1.
Unit Name:................................ North Anna 1 2.
Rspor t i ng Peri od:......................... July 1996 3.
Licensed Thermal Power (MWt):.............
2,893 4.
Nameplate Rating (Gross MWe):.............
994 5.
DIsign Electrical Rating (Net MWe):.......
907 6.
Maximum Dependable Capacity (Gross MWe)..
940 i
7.
M:ximum Dependable Capacity (Net MWe):....
893 8.
If changes occur in capacity Ratings (Itenas No. 3 thru 7) since last report, give reasons:
N/A J
9.
Power level to which restricted, if any (Net MWe): ____N/A
- 10. Raasons for restrictions, if any:
N/A This Month Y-t-D Cumulative 1
l
- 11. Hours i n R epor t i ng Per i od.................................
744.0 5,111.0 158,747.0
- 12. Number of Hours Reactor was Cri t i cal......................
744.0 4,410.5
'21,596.9
- 13. Rsactor Reserve Shutdown Hours............................
0.0 43.0 6,994.4
- 14. Hours Generator 0n-Line...................................
744.0 4,382.7 118,570.2
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generat ed (MWH )...................... 2,151,630.6 11,906,198.1 317,219,935.2
- 17. Gross E l ec t ri cal Energy Generat ed (MWH)...................
704,659.0 3,911,971.0 141,242,584.0
- 18. Nat Electrical Energy Generated (MWH).....................
669,434.0 3,712,951.0 98,754,105.0
- 19. Unit Service Factor.......................................
100.0%
85.8%
74.7%
- 20. Unit Availability Factor....................
100.0%
85.8%
74.7%
- 21. Unit Capacity Factor (using MDC Net)......................
100.8%
81.4%
69.6%
- 22. Unit Capacity Factor (using DER Net)......................
99.2%
80.1%
68.6%
- 23. Forced Outage Rate........................................
0.0%
0.0%
9.0%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATION
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unit:
NA-1 Date:
Aucust 5, 1996 Contact W.R.
Matthews Phone:
(540) 894-2101 MONTH: July 1996 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 898 17 900 2
899 18 899 3
900 19 900 4
901 20 901 5
902 21 902 6
901 22 900 7
900 23 900 8
899 24 900 9
900 25 899 10 900 26 900 11 900 27 899 12 891 28 900 13 900 29 899 14 902 30 899 15 901 31 900 16 900 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
m NORTH ANNA POWER STATION UNIT NO.:
1 4
MONTH:
Julv i
SUMMARY
OF OPERATING EXPERIENCE j
Page 1 of 1 f
Listed below in chronological sequence is a summary of operating i
experiences for this month which required load reductions or resulted in j
significant non-load related incidents.
Date Time Data July 01, 1996 0000 Began month with unit at 100% power, 947 MWe.
i
)
July 12, 1996 1032 Commenced ramp down from 100% power, 948 MWe for j
Turbine Valve Freedom Test (TVFT).
1115 Unit stable at 92% power, 876 MWe.
I 1255 Commenced ramp from 92% power to 100% power j
after completion of TVFT.
1432 Unit stable at 100% power, 942 MWe.
j July 31, 1996 2400 Ended month with unit stable at 100% power, j
947 MWe.
i e
]
i
)
i U
4 i
i i
Page 1
of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month Julv Unit Name:
NA-1 Year:
1996 Date: Aucust 5,
1996
Contact:
W.
R. Matthews
- No entry this month.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-338.
UNIT NAME:
NA-1 DATE: August 5, 1996 REPORT MONTH: July 1996 CONTACT:
W.
R. Matthews PHONE: (540) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence No Entry This Month O
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data l
C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source t
l
i OPERATING DATA REPC;tT DOCKET NO.:
50-339 DATE: August 5, 1996 l
1 CONTACT:
W. R. Matthews PHONE: (540) 894-2101 i
l OPERATING STATUS i
1.
Un i t N ame................................ N o r t h Anna 2
(
2.
R epor t i ng Per i od s......................... Jul y 1996 3.
Licensed Thermal Power (MWt):.............
'2893 l
i 4.
Nameplate Rating (Gruss MWe):.............
979 i
l 5.
Dssign Electrical Rating (Net MWe):.......
907 6.
t.zzimum Dependable capacity (Gross MWe):..
944 7.
Mzximin Dependable capacity (Net MWe):....
897 8.
If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A l
l 9.
Power level to which restricted, if any (Net MWe): _ _N/A l
- 10. Rassons for restrictions, if any:
N/A l
f I
This Month Y-t-D Cumulative
- 11. Hours in Reporting Period.................................
744.0 5,111.0 137,015.0
- 12. Number of Hours Reactor was Critical......................
744,0 5,111.0 115,168.6 l
- 13. Ratetor Reserve Shutdown Hours............................
0.0 0.0 6,535.0 l
i
- 14. Hours Generator 0n-Line...................................
744.0 5,111.0 114,034.1 f
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0 0.0
- 16. Gross Therma l Energy Generated (MWH)..................... 2,152,004.1 14,782,438.9 310,759,677.6 l
- 17. Gross Electrical Energy Generated (MWH)...................
703,761.0 4,858,140.0 101,689,558.0 t
l
- 18. Net Electrical Energy Generated (MWH).....................
668,502.0 4,623,607.0 97,195,246.0 l
- 19. Unit Service Factor.......................................
100.0%
100.0%
83.2%
- 20. Unit Availability Factor..................................
100.0%
100.0%
83.2%
l 1
- 21. Unit Capacity Factor (using MDC Net)......................
100.2%
100.9%
78.9%
i
- 22. Unit Capacity Factor (using DER Net)......................
99.1%
99.7%
78.2%
- 23. Forced Outage Rate........................................
0.0%
0.0%
4.7%
- 24. Shutdouns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Scheduled Refueling
,_0utage, September 7, 1996, duration = 30 days.
d
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
[
INITIAL ELECTRICITY COMMERCIAL OPERAfl0N
AVERAGE DAILY UNIT POWER LEVEL Docket No. :
50-339 Unit:
NA-2 Date:
August 5,
1996 Contact W.R.
Matthews Phone:
(540) 894-2101 i
MONTH: July 1996 l
DAY AVERetGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)
LEVEL (MWe-Net) 1 897 17 896 2
899 18 898 3
899 19 896 4
900 20 900 5
900 21 899 6
900 22 899 7
900 23 899 8
898 24 899 9
898 25 898 1
10 898 26 897 11 899 27 897 12 900 28 897 13 900 29 897 14 900 30 898 15 899 31 898 16 899 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:
Julv i
SUMMARY
OF OPERATING EXPERIENCE i
Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
I Date Time Data July 01, 1996 0000 Began month with unit stable at 100% power, 945 MWe.
July 19, 1996 0751 Commenced unit rampdown for Turbine Valve Freedom Test.
Unit at 100% power, 943 MWe.
0821 Unit stable at 91% power, 860 MWe.
0837 Turbine Valve Freedom Test completed.
Commenced ramp up from 91%, 860 MWe.
0922 Unit stable at 100% power, 943 MWe.
July 31, 1996 2400 Ended month with unit stable at 100% power, 945 Mwe.
i l
1 l
l e
Page 1
of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 Report Month Julv Unit Name:
NA-2 Year:
1996 Date: August 5, 1996
Contact:
W.
R.
Matthews i
No entry'this month.
l l
)
~
DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: August 5, 1996 REPORT MONTH: July 1996 CONTACT: W.
R.
Matthews PHONE: (540) 894-2101 1
2 3
4 5
Wo.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence No Entry This Month o
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
-.