Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
. _ . . _
t- .
l .
i VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: _M_a_rch a YEAR: 1996 l
l Approved:
l I
Station Manager _
M !
' 9604170303 960412 PDR ADOCK 05000338 i R PDR i
l
., OPERATING DATA REPORT DOCKET NO. 50-338 DATE: April 5, 1996 CONTACT: J. A. Stall PHONE: (540) 894-2101 OPERATING STATUS
- 1. Unit Name ................................ North Anna 1
- 2. Reporting Period:......................... March 1996
- 3. Licensed Thermal Power (MWt):............. 2,893 i
- 4. Nameplate Rating (Gross MWe):............. 994 I
- 5. Dzsign Electrical Rating (Net MWe) ....... 907 j
- 6. Maimum Dependable capacity (Gross MWe):.. 940
- 7. Maximin Dependable Capacity (Net MWe):.... 893 l
- 8. If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons: N/A
{
l 4
- 9. Power level to which restricted, if any (Net MWe): N/A
- 10. Ratsons for restrictions, if any: N/A i
I i
This Month Y t-D Cumulative
- 11. Hours in Reporting Period................................. 744.0 2,184.0 155,820.0
- 12. Number of Hours Reactor was Critical...................... 497.3 1,483.5 118,669.9 l
- 13. R uctor Reserve Shutdown Hours............................ 30.6 43.0 6,994.4
- 14. Hours Generator 0n-Line................................... 470.3 1,455.7 115,643.2 l
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0 ;
- 16. Grcas Thermal Energy Generated (MWH)...................... 1,234,628.1 3,440,656.1 308,754,393.2
- 17. Gross E lect r i cal Energy Generated (MWH ). . . . . . . . . . . . . . . . . . . 404,941.0 1,130,101.0 138,460,714.0 ,
- 18. N st E lect ri cal Energy Generated (MWH ) . . . . . . . . . . . . . . . . . . . . . 383,958.0 1,066,861.0 96,108,015.0
- 19. Unit Service Factor....................................... 63.2% 66.7% 74.2%
- 20. Unit Availability Factor.................................. 63.2% 66.7% 74.2%
- 21. Unit Capacity Factor (using MDC Net)...................... 57.8% 54.7% 69.0%
- 22. Unit Capacity Factor (using DER Net)...................... 56.9% 53.9% 68.0%
- 23. Forced Outage Rate........................................ 0.0% 0.0% 9.2%
l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A I
- 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A j
! 26. Units in Test Status (Prior to Connercial Operation):
j* Forecast Achieved 2
IWITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
l
l.
l AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit: NA-1 Date: ADril 5. 1996 Contact J. A. Stall Phone: (540) 894-2101 MONTH: March 1996 I
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER l LEVEL (MWe-Ne t) LEVEL (MWe-Net) I 1 0 17 911 ,
2 0 18 910 l 3 0 19 908 4 0 20 907 5 0 21 908 6 0 22 909 j 7 0 23 909 l 8 0 24 623 l 9 0 25 419 .
l 10 0 26 909 l l 11 0 27 909 l i 12 249 28 909 l 13 608 29 908 !
14 652 30 909 15 737 31 909 16 898 i
- Instructions:
- On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest j whole megawatt. ;
1 l :
l l
l l
1
. 1 l
-Page 1 of a l
UNIT SHUTDOWN AND POWER REDUCTIONS l Explanation Sheet j
Docket No.: 50-338 Report Month March Unit Name: NA-1 Year: 1996 Date: April 5, 1996
Contact:
J. A. Stall l
- 96-02 March 24, 1996 Unit manually taken off-line at 1928 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.33604e-4 months <br /> and shutdown for maintenance on 01-MS-TV-101B. ;
i i
l l
l 1
4
.~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-338 UNIT NAME: NA-1 DATE: April 5, 1996 REPORT MONTH: March 1996- CONTACT:'J. A. Stall' PHONE: (540) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (his) Shutting Event Code code Action to Down Reactor . Report # Prevent Recurrence-96-02 960325 S 9.8 B 1 N/A N/A N/A N/A 1: Type 2: Reason 3: Method- 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source
.~
. NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: March
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 3 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data March 01, 1996 0000 Began month with unit in Mode 6 for scheduled
[ refueling outage. Reactor fuel on-load in progress.
March 02, 1996 1442 Reactor fuel on-load completed.
March 05, 1996 1038 Unit entered Mode 5.
March 08, 1996 0618 Unit entered Mode 4.
0807 Commenced RCS cooldown to Mode 5 due to 1-RC-P-1B failure to start.
1126 Unit entered Mode 5.
March 09, 1996 2330 Repairs completed to 1-RC-P-1B. Commenced RCS heatup to Mode 4.
2340 Unit entered Mode 4.
March 10, 1996 0510 Unit entered Mode 3. 1 2302 Unit entered Mode 2.
l 2351 Reactor critical.
March 11, 1996 1805 Unit entered Mode 1 following completion of Low Power Physics Testing.
2350 Placed Unit on line.
March 12, 1996 0130 Unit stable at 30% power, 271 MWe for chemistry hold.
1730 Chemistry hold cleared. Commenced ramp to 75%
i power.
March 13, 1996 0140 Ramp suspended at 61% power, 571 MWe due to steam generator action level one on sulfates.
0610 Cleared action on steam generator sulfates and j commenced ramp from 61% power.
l.
l l
,.. - . _ . - . . = - . . - . _ - . _ - . - . - - - . - . . . . . - . . _ . , - -
NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: March r
SUMMARY
OF OPERATING EXPERIENCE Page 2 of 3 Listed below in chronological sequence is a summary of operating '
experiences for this month which required load reductions or resulted in significant non-load related incidents. '
D3_ta t Time Data March 13, 1996 0930 Unit stabilized at 74% power, 697 MWe for flux mapping. t March 15, 1996 0415 Commenced unit ramp-up. Unit at 74% power, 700 MWe.
0601 Stabilized unit at 81% power, 783 MWe. due to !
chemistry hold. I 1821 Chemistry hold cleared. Commenced unit ramp-up.
Unit at 81% power, 783 MWe.
2121 Stabilized unit at 90% power, 870 MWe. to adjust nuclear instrumentation. !
2122 Commenced unit ramp-up. Unit at 90% power, 870 .
MWe.
2306 Stabilized unit at 96% power, 928 MWe. due to chemistry hold.
March 16, 1996 0436 Chemistry hold cleared. Commenced unit ramp-up.
Unit at 96% power, 928 MWe.
1040 Unit stable at 100% power, 952 MWe.
March 24, 1996 1248 Commenced ramping unit down from 100% power, 959 MWe for repairs to 01-MS-TV-101B.
1928 Opened generator output breaker. Unit of f-line.
1935 Entered Mode 2.
l 1945 Entered Mode 3.
l 2355 All maintenance and testing complete on 01-MS-TV-101B.
l March 25, 1996 0200 Entered Mode 2. l 5
0238 Reactor critical.
0332 Entered Mode 1.
NORTH ANNA POWER STATION j UNIT NO. 1 l MONTH: March
SUMMARY
OF OPERATING EXPERIENCE Page 3 of 3 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resultec'. in significant non-load related incidents.
Date Time Data March 25, 1996 0515 Commenced unit ramp to 30% power.
0850 Unit placed into chemistry hold at 30% power, 262 MWe on steam generator sulfates. l l
1207 Cleared chemistry hold.
1226 Commenced ramp to 100% power from 30% power, 260 MWe.
1843 Unit stable at 100% power, 956 MWe.
March 31, 1996 2400 Ended month with unit stable at 100% power, 956 MWe.
I l
i i
N
, OPERATING DATA REPORT DOCKET NO.: 50-339 DATE: April 5, 1996 CONTACT: .'. A. Stall PHONE: (540) 894 2101 ;
1 l
OPERATING STATUS
- 1. Unit Name:................................ North Anna 2
- 2. Repor t ing Per i od: . . . . . . . . . . . . . . . . . . . . . . . . . March 1996
- 3. Licensed Thermal Power (MWt):............. 2893
- 4. . Nameplate Rating (Gross MWe):............. 979
- 5. DIsign Electrical Rating (Net MWe):....... 907
- 6. M ximun Dependable Capacity (Gross MWe) .. 944 ;
- 7. M:ximum Dependable Capacity (Net MWe):.... 897
- 8. If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons: N/A
- 9. Power level to which restricted, if any (Net MWe): _ N/A
- 10. Raisons for restrictions, if any: N/A I This Month Y-t-D Cumulative
- 11. Hours in Reporting Period................................. 744.0 2,184.0 134,088.0
- 12. Number of Hours Reactor was critical...................... 744.0 2,184.0 112,241.6
- 13. Ratetor Reserve Shutdown Hours............................ 0.0 0.0 6,535.0
- 14. Hours Generator 0n-Line................................... 744.0 2,184.0 111,107.1
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) . . . . . . . . . . . . . . . . . . . .. 2,151,969.4 6,316,595.9 302,293,834.6
- 17. Gross Electrical Energy Generated (MWH)................... 707,309.0 2,079,757.0 98,911,175.0
- 18. Net E l ect ri cal Energy Generated (MWH ) . . . . . . . . . . . . . . . . . . . . . 673,770.0 1,981,411.0 94,553,050.0
- 19. Unit Service Factor,...................................... 100.0% 100.0% 82.9%
- 20. Unit Availability Factor.................................. 100.0% 100.0% 82.9%
- 21. Unit Capacity Factor (using MDC Net)...................... 101.0% 101.1% 78.4%
- 22. Unit Capacity Factor (using DER Net)...................... 99.8% 100.0% 77.7%
- 23. Forced Outage Rate........................................ 0.0% 0.0% 4.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Scheduled Refueling Outage SIptember 14, 1996 , 35 day Duration
! 25. If Shutdown at end of Report Period, estimated time of Startup: N/A j 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved
, INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
l AVERAGE DAILY UNIT POWER LEVEL i
Docket No.: 50-339 i Unit: NA-2 Date Acril 5, 1996, Contact J. A. Stall Phone: (540) 894-2101 MONTH: March 1996 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 906 17 905 2 905 18 905 3 905 19 908
-4 904 20 908 5 905 21 908 6 905 22 904 I 7 905 23 908 8 903 24 906 9 903 25 903 10 905 26 908 11 906 27 907 12 905 28 906 13 905 29 907 14 905 30 907 15 905 31 908 l 16 904 !
i l
i Instructions:
On this format, list the average daily unit power levei in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l
o DOCKET NO.: 50-339 UNIT NAME: NA-2 DATE: April 5, 1996 REPORT MONTH: March 1996 CONTACT: J. A. Stall PHONE: (540) 894-2101 1 2 3 4 5 Wo. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting livent Code Code Action to Down Reactor Re!! ort # Prevent Recurrence o No Entries This Month 1: Type 2; Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F- Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source