Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000339/LER-1999-002-03, :on 990922,containment Liner Through Wall Defect Was Noted.Caused by Corrosion.Pressure Test Was Performed.With1999-10-21021 October 1999
- on 990922,containment Liner Through Wall Defect Was Noted.Caused by Corrosion.Pressure Test Was Performed.With
ML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619 05000339/LER-1999-001-03, :on 990915,failure to Lock Open Loop SV Breakers as Intended by TSs Was Noted.Caused by Failure to Update Operating Procedures.Procedure ARs Were Initiated & Approved for Maint Procedure 1/2-MOP-5.92.With1999-10-12012 October 1999
- on 990915,failure to Lock Open Loop SV Breakers as Intended by TSs Was Noted.Caused by Failure to Update Operating Procedures.Procedure ARs Were Initiated & Approved for Maint Procedure 1/2-MOP-5.92.With
ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With 05000338/LER-1999-006-01, :on 990904,potential for Safegurads Exhaust Flow to Bypass Charcoal Filter,Was Discovered.Caused by Degraded Damper.Plant Issue Rept Submitted for B Train of Savs Flow Rate.With1999-09-28028 September 1999
- on 990904,potential for Safegurads Exhaust Flow to Bypass Charcoal Filter,Was Discovered.Caused by Degraded Damper.Plant Issue Rept Submitted for B Train of Savs Flow Rate.With
05000338/LER-1999-002, :on 990213,unsecured Isolation Valve,Was Discovered.Caused by Valve Configuration.Unsecured Bit Manual Bypass Isolation Valve Was Verified Closed & Chain & Lock Secured Valve Tee Handle.With1999-09-17017 September 1999
- on 990213,unsecured Isolation Valve,Was Discovered.Caused by Valve Configuration.Unsecured Bit Manual Bypass Isolation Valve Was Verified Closed & Chain & Lock Secured Valve Tee Handle.With
ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML18152B3831999-08-23023 August 1999 Safety Evaluation Granting Relief Request from ASME Section XI Requirements for Containment Insp ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with 05000338/LER-1999-004, :on 990413,position Switch for Suction Supply Dampers to CR Emergency Fan Was Discovered Out of Position. Cause Could Not Be Determined.Station Entered Action Statement for TS 3.7.7.1.With1999-05-11011 May 1999
- on 990413,position Switch for Suction Supply Dampers to CR Emergency Fan Was Discovered Out of Position. Cause Could Not Be Determined.Station Entered Action Statement for TS 3.7.7.1.With
ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With 05000338/LER-1999-003, :on 990331,potential Loss of HHSI Pumps, Occurred Due to Postulated Main CR Fire.Caused by Incomplete Understanding of Time Sensitivity of Actions Required to Avoid Potential Loss.Procedure Revised.With1999-04-27027 April 1999
- on 990331,potential Loss of HHSI Pumps, Occurred Due to Postulated Main CR Fire.Caused by Incomplete Understanding of Time Sensitivity of Actions Required to Avoid Potential Loss.Procedure Revised.With
ML20206C0151999-04-22022 April 1999 Safety Evaluation Supporting Amends 219 & 200 to Licenses NPF-4 & NPF-7,respectively ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML18152B6451999-04-13013 April 1999 SER Accepting Util Reactor Pressure Vessel Fluence Methodology for Surry Power Stations,Units 1 & 2 & North Anna Power Station,Units 1 & 2 Subject to Listed Limitations ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With 05000338/LER-1999-002, :on 990213,isolation Valve Was Unsecured. Caused by Valve Configuration.Unsecured Valve Verified to Be Closed & Chain & Lock Placed in Manner That Would Secure Valve Tee Handle.With1999-03-11011 March 1999
- on 990213,isolation Valve Was Unsecured. Caused by Valve Configuration.Unsecured Valve Verified to Be Closed & Chain & Lock Placed in Manner That Would Secure Valve Tee Handle.With
ML20207H4451999-03-0202 March 1999 Safety Evaluation Supporting Amends 218 & 199 to Licenses NPF-4 & NPF-7,respectively ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year 05000338/LER-1999-001-01, :on 990106,RCS Leak Rate Missed Surveillance Was Noted.Caused by Computer Malfunction.Computer Malfunction Affecting VCT & Pzr Level Inputs Was Corrected. with1999-01-22022 January 1999
- on 990106,RCS Leak Rate Missed Surveillance Was Noted.Caused by Computer Malfunction.Computer Malfunction Affecting VCT & Pzr Level Inputs Was Corrected. with
ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198A3581998-12-10010 December 1998 Safety Evaluation Supporting Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With 05000338/LER-1998-007-01, :on 981015,3B Casing Cooling Pump Failed to Develop Discharge Pressure & Recirculation.Caused by Air Binding.Subject Pump Was Vented of Air,Started & Tested Satisfactorily.With1998-11-12012 November 1998
- on 981015,3B Casing Cooling Pump Failed to Develop Discharge Pressure & Recirculation.Caused by Air Binding.Subject Pump Was Vented of Air,Started & Tested Satisfactorily.With
ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20155H0351998-10-30030 October 1998 Safety Evaluation Supporting Amends 215 & 196 to Licenses NPF-4 & NPF-7,respectively ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns 05000338/LER-1998-005-01, :on 980921,safety Valve Setpoints Were Noted Out of Tolerance.Caused by Setpoint Variance.Valves Were Disassembled,Inspected,Repaired as necessary,re-assembled & Tested Satisfactory.With1998-10-0707 October 1998
- on 980921,safety Valve Setpoints Were Noted Out of Tolerance.Caused by Setpoint Variance.Valves Were Disassembled,Inspected,Repaired as necessary,re-assembled & Tested Satisfactory.With
05000338/LER-1998-006-01, :on 980922,ESFA Occurred.Caused by Human Error. Safety Injection Signal Was Reset & Equipment Was Restored to Normal1998-10-0707 October 1998
- on 980922,ESFA Occurred.Caused by Human Error. Safety Injection Signal Was Reset & Equipment Was Restored to Normal
05000339/LER-1998-004-02, :on 980917,reactor Trip Was Noted.Caused by Lightning Strike.Operations Emergency Procedure 2-E-0, RT or SI Was Entered1998-10-0606 October 1998
- on 980917,reactor Trip Was Noted.Caused by Lightning Strike.Operations Emergency Procedure 2-E-0, RT or SI Was Entered
05000339/LER-1998-003-01, :on 980424,multiple Failures Occurred During Functional Testing of RCS Large Bore Snubbers.Cause Unknown. Large Bore Snubbers Replaced.With1998-10-0505 October 1998
- on 980424,multiple Failures Occurred During Functional Testing of RCS Large Bore Snubbers.Cause Unknown. Large Bore Snubbers Replaced.With
ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With 05000338/LER-1998-004-01, :on 980902,motor Operated Valve Surveillance Was Missed.Caused by Personnel Error.Station Entered 24 H Action of TS 4.0.3 & Station Deviation Rept Was Initiated to Document Condition.With1998-09-22022 September 1998
- on 980902,motor Operated Valve Surveillance Was Missed.Caused by Personnel Error.Station Entered 24 H Action of TS 4.0.3 & Station Deviation Rept Was Initiated to Document Condition.With
1999-09-08
[Table view] |
Text
.
O,
,, g VInorNIA ELecTHIC ann Powen COMPANY Ricnwoxn, VIRGINIA 20061 l
December 8,1995 U. S. Nuclear Regulatory Commission Serial No.95-626 Attention: Document Control Desk NL&OS/JHUCMC Washington, D.C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the November 1995 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, j
M. L. Bowling, Manager Nuclear-Licensing and Operations Support i
Enclosure cc:
U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 14000-E.
I 951214o001 95113o PDR ADOCK 0500o330 l
. R.
PDR
i i
i i
I i
j 1
1 l
VIRGINIA POWER COMPANY
[
NORTH ANNA POWER STATION l
MONTHLY OPERATING REPORT i
l MONTH:
November YEAR:
1995 l
I l
l i
l i
l l
\\
i.
l-Approved:
1 L
Station Manager
- -... - ~ - -
-m~~
l OPERATING DATA REPORT i
DOCKET NO.:
50-338 DATE: December 5, 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS f
1.
Uni t Name s................................ North Anna 1 I
2.
Repor t ing Period:......................... November 1995 3.
Licensed Thermal Power (MWt):.............
2,893 4.
Nameplate Rating (Gross MWe):.............
994 l
5.
Design Electrical Rating (Net MWe):.......
907 j
6.
Maximum Dependable Capacity (Gross MWe):..
940
. 7.
Malmun Dependable Capacity (Net MWe):....
893 i
8.
If changes occur in Capacity Ratings (Items No.' 3 thru 7) since last report, give reasons _ N/A 9.
Power level to which restricted, if any (Net MWe):
N/A l
- 10. RIasons for restrictions, if any:
N/A This Month Y-t-D Cumulative l
- 11. Hours i n Report i ng Per i od.................................
720.0 8,016.0 152,892.0 i
- 12. Number of Hours Reactor was Criticat......................
720.0 7,994.6 116,442.4
- 13. RIact or R eserve Shutdown Hours............................
0.0 20.9 6,951.4 ik. Hours Generator 0n-Line...................................
720.0 7,989.8 113,443.5 l
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0
-0.0 l-
- 16. Gross Thermal Energy Generated (MWH)...................... 2,082,910.7 23,043,175.1 303,228,755.0
(
- 17. Gross Electrical Energy Generated (MWH)...................
681,454.0 7,560,281.0 99,635,901.0
- 18. nit Electrical Energy Generated (MWH).....................
648,739.0 7,189,904.0 94,392,190.0 i
l
- 19. Unit Service Factor.......................................
100.0%
99.7%
74.2%
- 20. Uni t Avai l abi l i ty F ac tor..................................
100.0%
99.7%
74.2%
- 21. Uni t Capaci ty Factor (us i ng MDC Net )......................
100.9%
100.0%
69.1%
- 22. Unit Capacity Factor (using DER Net)......................
99.3%
98.9%
68.1%
- 23. Fcrced Outage Rate........................................
0.0%
0.3%
9.4%
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_ Refueling Outage Scheduled for February 10, 1996, Ouration 29 Days
- 25. If Shutdown at end of Report Period, estimated time of Startup: _N/A
- 26. Units in Test Status (Prior to Commercist Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
- ~..
t I
AVERAGE D!TLY UNIT POWER LEVEL Lc,ket No.:
50-338 Unit:
NA-1 Date:
December 5.
1995 Contact J.
A. Stall Phone (703) 894-2101 MONTH: November 1995 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 902 17 901 2
902 18 902 3
902 19 902 4
902 20 901 5
902 21 902 6
900 22 901 7
900 23 901 8
900 24 901 9
899 25 901 10 900 26 901
[
11 900 27 902 12 900 28 902 13 900 29 902 14 901 30 901 15 901 16 901 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
4 l
~.-.
NORTH ANNA POWER STATION t
UNIT NO.9 1
MONTH:
November
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is
.a summary of operating i
.exper ences for this month which required load reductions or resulted in 3
significant non-load related incidents.
1 Date Time Data November 01, 1995 0000 Began month with unit at 100% power, 947 MWe.
November 30, 1995 2400 Ended month with unit at 100% power, 946 MWe.
. _.. _. ~ _ _
Page 1
of 1
l UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month November Unit Name:
NA-1 Year:
1995
.Date: December 5.
1995
Contact:
J.
A.
Stall
.f No entry this month.
i
.l I
3
)
I 4
g e.
UNIT SHUTDOWN $ AND POWER.. REDUCTIONS 3.-
DOCKET NO.: ' 50-338 UNIT NAME:
NA '(
-DATE: December 5, 1995
.i REPORT MONTH: November 1995
- CONTACT: J. A.-Stall l
PHONE: (703) 894-2101
'{
h 1
2 3
4 5
Wo.
Date Type Duration Reason
-Method of Licensee System Component Cause & Corrective..
(hrs)
Shutting Event
-Code Code Action to Down Reactor Report-#
Prevent Recurrence o
No Entry This Month l
h f
l 5
r 1:. Type 2: Reason 3: Method 4-i F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F'
. Instructions !
~
S= Scheduled B= Maintenance or-Test-2= Manual Scram for preparation of' Data C= Refueling 3= Automatic Scram : Entry _ Sheets.for Licensee; D= Regulatory Restriction-4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction
. (NUREG-0161)-
F= Administrative 9=Other G= Operational' Error
-5 :
H=Other (explain)
Exhibit'H -'Same Source i
t I
t I
e
_._.-.___._,--m.._m_
m -
___m_m.,me-a m em
-..m
=em -
e
.-.e wii-,a e...
-it.-ern-m w a,-wnww w
~%,...-.w
--~.~
~..
~.
~~
OPERATING DATA REPORT l
=
DOCKET NO.:
50 339 DATE: December 5,1995 i
CONTACT:
J. A. Stall PHONE: (703) 894-2101 j
'l i
OPERATING STATUS 1.
Uni t N ame:................................ Nor th Anna 2 2.
Report i ng Per i od:......................... November 1995 3.
Licensed Thermal Power (MWt):.............
2893 4.
Nameplate Rating (Gross MWe):.............
.979 j
5.
Design Electrical Rating (Net MWe):.......
907 6.
M ximum Dependable capacity (Gross MWe):..
944 7.
Maximum Dependable Capacity (Net MWe)2....
897 8.
If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A i
9.
Power level to which restricted, if any (Net MWe):
N/A
- 10. Riasons for restrictions, if any:
N/A This Month Yat-D Cumulative-
- 11. H ours i n R eport i ng Per i od.................................
720.0 8,016.0 131,160.0
- 12. Number of Hours Reactor was Critical......................
694.4 6,380.1 109,313.6
- 13. Ryac t or Reserve Shut down Hours............................
24.8 26.1 6,535.0 i
- 14. Hours Generat or 0n-L i ne...................................
689.5 6,343.4 108,179.1
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0 0.0
' 16. Gross Thermal Energy Generat ed (MWH)..................... 1,973,983.4 17,210,323.5 293,826,287.5
- 17. Gross E lect rical Energy Generat ed (MWH )...................
650,804.0 5,644,566.0 96,121,423.0
- 18. Nit E l ect rical Energy Generat ed (MWH).....................
619,451.0 5,355,332.0 91,895,300.0
~19. Unit Service Factor.......................................
95.8%
79.1%
82.5%
- 20. Unit Availability Factor..................................
95.8%
79.1%
82.5%
- 21. Uni t Capac i ty Factor (usi ng MDC Net )......................
95.9%
74.9%
77.9%
- 22. Uni t Capaci ty Factor (usi ng DER Net)......................
94.9%
73.7%
77.2%
- 23. Fcreed Outage Rate........................................
4.2%
0.5%
4.9%
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
?
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A i
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-339 Unit:
NA-2 Date:
December 5.
1995 Contact J.
A. Stall Phone:
(703) 894-2101 MONTH: November 1995 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 911 17 910 2
911 18 909 3
909 19 910 4
890 20 911 5
889 21 911 6
909 22 911 7
912 23 911 8
912 24 911 9
911 25 911 10 902 26 911 11 466 27 910 12 22 28 911 13 783 29 911 14 911 30 911 15 911 16 912 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
- ~...
NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:
November
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 2 Listed below in chronological sequence is a summary of operating l
experiences for this month which required load reductions or resulted in significant non-load related incidents.
Reig Time Data November 01, 1995 0000 Began month with unit stable at 100% power, 959 MWe.
f November 10, 19985 0905 Commenced unit ramp-down for Turbine Valve Freedom Test.
Unit at 100% power, 951 MWe.
0938 Unit stable at 90% power, 860 MWe.
1115 Commenced unit ramp-up following Turbine Valve Freedom Test.
Unit at 90% power, 860 MWe.
1230 Unit stable at 100% power, 954.MWe.
November 11, 1995-1215 Unit trip on Power Range High Negative Flux Rate due to f ailure of 2-ED-MG-1B with 2-ED-MG-1A tagged for maintenance.
Unit in Mode 3.
November 12, 1995 1112 Commenced reactor startup following repairs to 2-ED-MG-1A and 2-ED-MG-1B.
1300 Unit entered Mode 2.
1354 Reactor critical.
1447 Unit entered Mode 1.
i 1853 Unit placed on-line.
November 13, 1995 0020 Discontinued unit ramp-up at 30% power, 235 MWe for calorimetric calibration of nuclear instrumentacion and chemistry cleanup.
0041 Unit cleared chemistry hold.
Commenced unit ramp-up.
Unit at 30% power, 235 MWe.
0145 Unit stable at 48% power, 418 MWe.
Secured ramp-up to allow starting of a second Main Feed Pump.
0322 Commenced unit ramp-up. Unit at 48% power, 418 MWe.
0431 Unit stable at 75% power, 710 MWe.
Secured unit ramp-up to place MSR reheat in service.
\\
. _ _.. ~. _...
NORTH. ANNA POWER. STATION UNIT NO.:
2 NONTH:
Novembe,I
SUMMARY
OF OPERATING EXPERIENCE Page 2 of 2 November 13, 1995 0512 Commenced unit ramp-up. Unit at 75% power, 710 MWe.
0530 Unit stable at 85% power, 825 MWe to perform calorimetric calibration of nuclear instrumentation.
0535 Commenced unit ramp-up. Unit at 85% power, 825 MWe.
0643 Unit stable at 91% power, 875 MWe to start Low Pressure Heater Drain Pumps.
0910 Commenced unit ramp-up. Unit at 91% power, 875
- MWe, 1045 Unit stable at 100% power, 950 MWe.
November 30, 1995' 2400 Ended month with unit stable at 100% power, 956 Mwe.
l
i Page 1
of __J_
-i UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 Report Month November Unit Name:
NA-2 Year:
1995 Date: peQember 5, 1995
Contact:
J.
A.
Stall
- 95-01 November 11, 1995 Automatic reactor trip due. to Power Range High Negative Flux Rate caused by failure of 2-ED-MG-1B while 2-ED-MG-1A tagged for maintenance at 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br />.
November 12, 1995 I
Corrective maintenance complete and unit entered Mode 2 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />.
Unit entered Mode 1 at 1447 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.505835e-4 months <br />.
Main Generator on-line at 1853 hours0.0214 days <br />0.515 hours <br />0.00306 weeks <br />7.050665e-4 months <br />.
i i
s
[
P
DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: December 5, 1995 REPORT MONTH: November 1995 CONTACT: J. A.
Stall PHONE: (703) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence 95-01 951111 F
30.5 A
3 95-004-00 AA MG Automatic reactor trip due to Loss of "B" Control Rodi Drive System Motor Generator Set.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee-D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source 1
e 4
w
,e
,-