MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
-- - _ _ - - . _ _ - _ _ - - _ _ _ _ _ .
4 YIHOINIA ELucTHIC AND POWEH COMi%NY HICIIMOND,VikOINE A 200 01 October 13,1997 United States Nuclear Reguletory Commission Serial No.97-584 Attention: Document Control Dcsk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September 1997 Monthly Operating Report for North Anna Power Station Units 1 and 2. ,
Very truly yours, GJ444'&k W. R. Matthews Station Manager Enclosure cc: U. S. Nuclear Regulatory Commission Region ll Atlanta Federal Center 'I S1 Forsyth St., SW, Suite 23T85 .h i Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station 9710170123 970930 gDR ADOCKOSOOgG i
((((
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: 'Sentember Year: 1997 Approved:
_hPfW Station Manager a
. . CPERATING DATA 8CPORT e
f(CFET No.: 50-339 IAtti Octot er 5,1997 CONTACTS M. R. Matthews
. PMDNE4 (543) 694 2101 CPLRATING STATU$ '
- 1. tJnit Name1.... ..... ... . .. . . . North Anna 1
- 2. Reporting Periods.. . . . Septamtor 1991
- 3. Licensed Thermal Power (MWt) . 2,893
- 4. Nameplate Rating (Greas MWels. . . 979,14 S. resigJ Electrical kating (Not MWels. 907
- 4. Maxieum Lependat ie CaF'acity (Gross MWel t. 940
- 7. Maximum tapendable Capacity (Net MWe)t. 99)
- 8. If changes occur to Cap city Ratings (! tea 3 thru il since last report, give reasons: N/A Numer14te Rating (Gross Hwel changed t o $19.7 4:t No. SE-97-112 Dev.0
- 9. Power sevel to which restricted, if any (Not MWel1 N/A
- 0. Reasons for restrictions. If shyt N/A This Month Y-t-D Cumulative 11, hours in Reporting terlod. . .. . .. .. 720.0 6,551.0 168,971.0
- 12. NWer of Hours Reactor was Critical., , ,
120.0 1,926.9 131,046.0
- 13. Reacter Reserve Shutdown Hours. . 0.0 49.0 7,095.0
- 14. Hours Generator On-Line. . . . 720.0 5,144.6 127,959.4 1s. Unit Reserve shutdown Hours. . . 0.0 0.0 0.0
- 10. Gross Thermal Energy Generstad (MWM). . . 2,082,289.5 16,569,932.5 344,150,469.1
- 17. Gross nectri al Energy Generated (MWHl. . 662,675.0 5,432,619.0 150.073,365.0
- 19. Het Electrical f.nergy Generated (MWh). 449.460.0 5,163,5'70.0 107.150,232.0 19 Unit service rector. . .. .. , 100.06 88.3% 75.7%
- 20. Unit Availability Tactor. . 100.04 31.3% 75.71
- 21. Unit capacity Tactor tusing MDC Net) . 100.9% $$.3% 70.9%
- 22. Unit Capacity f actor (using PER Net) . . 99.3% $( 9% 69,94
- 23. Forced Outage Pate. , . .. . . . 0.0% 0.0% 0.5%
J4. Shuttuwns Scheduled Over Next 6 Months (Type, tate, Duration of Each N/A
- 25. If Shutdown at end of peport Period, estis'ated time of Startup: N/A
.6. Units in Test Status (Prior to Commeretal Operation):
Torecast Achieved INITIAI. CRITICALITY _
IN;11AL ELECTHICITY Cw d RLIAL OPERATION
AVERAG:: DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit: NA-1 t
Date: October 5, 1997
Contact:
W. R. Matthews Phone: (540) 894-2101 MONTH Sgtember 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 900 17 901 2 899 18 901 3 900 19 900 4 900 20 901 5 896 21 901 6 897 22 901 7 900 23 902 8 900 24 902 9 901 25 902 10 900 26 902 11 896 27 902
~
12 901 28 902 13 901 29 902
~
14 901 30 903 15 901 16 900 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to t'.e nearest whole megawatt.
~T ._
, gg,7g_AggA pg,,, ,7A7 Igg.
. . UNIT NO. J.
MONTH: September
, SUt44ARY OF OPERATING EXPERIENCE Page 1 of 1
-Listed below- in: _ chronological _ sequence is a summary of operating experiences for this nonth which required load reductions or resulted in significant non-load . elated-incidents.
Date Time Data September 1, 1997 0000 Began month in Mode.1 at 100% power, 949 Mwe.
September 5, 1997 2205 Commenced rampdown to 90% power for turbine valve freedom test.
-September 5, 1997 2248 Stopped ramp at 93% Power, 877 hwe. for TVFT September 5, 1797- 2327 - Shutdown 1-SD-P-1B for Maintenance Power decreased to 865 Mwe.
September 5, 1997 2330 TVFT Completed Sat. Commenced ramp to 100%
powar.
September 6, 1997 0100 Unit at 100% Power, 926Mwe September 6, 1997' 0339 Repairs to 1-SD-P-1B complete.
Power-at_100%, 948Mwe.
September 30, 1997 2400 Ended the month at 100% Power,-950 Mwe.
x
= =-
Ill lll iI
+
e e e s e s v c n a s e e i n ot nl c w t e i a ei r e1 c r t D cF u 9 7 t 1 h 0 e r
ot r u
c uf L i
)
o S
3 9 t 2 r n c r o R 3 9 a - o e t r E e
- 1 0 - 1, M 49 C o R i s noL m a
5 A 5 . 8 t n of (
R
& c t I i S N n t s t )
r )
e - a t r 1 2 e b W 45
. 0 eA u
v e
r e o6 F a e p1 H O E o a r ph e0 N M t i(
C P t eS R - t A cT i r G i T N O: : b p yt E b E N' E i r nR i K
C IT TEN TC W h r t eU x o n vN h
x O
D J t
N CAOCPH 2 E f E E 4
(
5 E
5 t
n e e n
odo pC m m
o a n C r s o m c ni a S ot
, r ic c ct u 4 S i a d t u e S m d l l a nR r
e e o a a mi W t d s o h u u ot d e t n n t n a h Me aa a u o mt yC t S
- M= A==C=I O -
- 1 2 3 4 5 9 N e e t f s n n e t 3
e c Ev or N
D i
L R
p e
M A 7 9
9 f r m1 r 3 o g o e nt b d i c m ot a n e h t e o t
p t u R i e h t e M S nw a S n T o i H D m I T a W N x t O 2 E M
n ) e T o n s R s i n O a a e P e l c E R p ni R x oL e i
( t t &
s c n e e i g r o) r T r n o i
s u t i r) t l r s n e r n a r i o ei vE i r h a R a i a u t F e r t l l D c yT a a p
't n g r r n x n a n o r t o e e nit o s i t 1 n m e l a t it o pt el a n a r e s i n u u r i r e p a ui f g e meh
% y . e q a e e pd pt T h R E M R R O A O O t = = = = = = = =
n : AB C DE F G H o 2 m
s i
% e h t
t a s d D e e i l r d u t ed n e c e e p r h y o c
' . o T F S o N =
N _
- F= S f 1 ll1lll lI
OPERRTING DATA REPORT DocFET W3.s60-339
, DAT$a October S.1991 CGfT ACTI W. R. Diettbews peaut e (1404 094 2101 Ott1ATING STAf98
- 1. Uma t Bene t . . . . . . . . . . . . . . . . . . . . , . ..... .. North Anna 3
- 3. Reporttag perseds.... .. . . . . . . . . . . . septe.ner 199)
- 3. Lateneed the rmal power pest i a . . . . . . . . . . . . 3.493
- 4. Demoplate tat tag (Gross pesell... ... . 979 B. Destf'4 Electrieel tattag (Net Derel t. .... . 901
- 6. BlaAtm.m DepetWlable CepeC&ty (Groes Befel e . . . 944 1 Maatsman Dependable Capeet ty (met perel s.... ... 097
- 9. It changes secur to Capeesty natings (18eme 3 thre h since last report. gave rereonal W/A
- 9. Power level te which restrLeted, if any 'Nt Defel t el/A 10- Seeseas for restrtetteas, if anye n/a u,-
Thas peonth T-t-D Cumuistive
- 11. Soure La Reporttag Per& A. . . .. .. .. .... . . . . . . . . . . . 120.0 4.651.0 447.239.0
- 12. Nuse>er of heure Seeeter wee Critteen . .. .. .. . ., ..... 120.0 4.551.0 123.504 7
- 13. Deactes Reserve shutda.se nours.. . . ...... ..... 0.0 0.0 1.163.3
- 14. unsre Genet stes On-Lane... .. .. . .. . .. 170.0 4.461.0 122.336.2
- 16. Unit keserte Shutenus Bours.. .. . .. . . . . . 0.0 0.0 0.0
- 14. Gross thermal Baergy esterated DafU.. . . . . . . .. . 3.082.142.1 10.943.427.4 334.621.545.4
- 17. Grose Electraeal Stergy Generated pest). .. . . . . . . . . . . . . . 470.826.0 4.144.314.0 109.451,461 0
- 15. Net tiectrieel taergy Generated pers). ... . . . . . . . . . . . . ... .. 44%.140.0 6.008.446 0 104. 641. e10.0 19 Unit Servlee Facter. . .. . . . . . . ... . .. .. ... .... ... 100.04 100.04 03.10
- 20. Unit Aves tability tector.. . . . . . . .. .. . . . . . . . . . . . 100.06 100.04 33.14
- 31. Unit Lapacity f acter Iwatag Batm.' met). . . . . . . . , , ... 99.94 100.39 19.05
- 22. Deat Capacity lector (vetag DER Net). . ... .... . . . . ..... 98.4 % 99 14 10.39
- 23. Fe rved fastage Rata. . . . . . . . . . . . . .. . . . 0.04 0.06 S.25
- 34. Shutewas Scheduled Oeet West 4 Denaths tType. Dete, Durettoa of Bacht e N/A 1
- 26. If shutdown at end of *. poet Ported, estimated time et Pter.ups m/A
=
- 24. Unite la Test Status (P ler to Commeretal C>arattoalt forecast Achieved IRITI AL CRITICALITY INITIAL ELECTRICITY CGetIRCIAL OFIRATICes
AVERAGE DAILY IMIT POWER LEVEL Docket No.: 50-339 Unit: NA-2 Date: October 5, 1997
Contact:
W. R. Matthews Phone: (540) 894-2101
-lCHTH September 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL ' (MWe-Net) LEVEL (MNo-Net) N 1 894 17 896 2 893 18 896 3 894 19 897 4 895 20 897 5 895 21 -897 6 ~
895 22 897
, 7 896 23 897 8 895 24 898 9 895 25 898 10 896 26 697 !
11 894 27 894 12 896 28 897 13 896 29 897 14 897 30 898 15 896 3 _16 8,96 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in ' the reporting month. Compute to the nearest
-whole megawatt.
1 NORTH ANNA POWER STATION UNIT 40.: 2_
MONTH: September
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for . this month which required load reductions or resulted in significant non-load related incidents.
Date Tinte Data September 1, 1997 0000 Began the Month in Mode 1 at 100% Power 943 Mwe.
September 27, 1997 0309 Commenced rampdown to 92% power for turbine valve freedom test.
September 27, 1997 0348 Unit stable at 92% power, 880 Mwe, Commence TVFT.
September 27, 1997 0411 TVFT Completed Sat. Coommenced ramp to 100%
power.
September 27, 1997 0610 Unit at 100% Power, 943 Mwe.
September 30, 1997 2400 Ended the month at 100% Power, 942 Mwe.
NN
=
e UNIT SEUTDOOWES AND POOMR REDUCTIONS DOCKTT NO.: 50-339 ,
UNIT NN4E: NA-2 DATE: October 5, 1997 REPORT MONTH Septent>er 1997 CONTACT: W. R. Matthews -
PHONE: (540) 894-2101 2 3 4 5 1
Reason Method of Licensee System Component Cause & Corrective No- Date Type Duration Shutting Event Code Code Action to (hrs)
Down Reactor Report # Prevent Recurrence i
3: Method 4:
1: Type 2: Reascn 1= Manual Exhibit F - Instructions F= Forced A= Equipment Failure (explain) 2-Manual Scram for preparation of Data S= Scheduled B-Maintenance or Test 3= Automatic Scram Entry Sheets far Licensee C= Refueling 4= Continuations Event Report (LER) File D= Regulatory Restriction E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9-Other 5:
G= Operational Error Exhibit H - Same Source H=Other (explain)
_ _ _ _ _ _ _ _