MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
_ _ - - _ - _ - - - - _ . _ _.-- _ - _ - __ - - -
- a
- VIHOINIA 13Ll:CTHIC AND l' owl:H COMI'ANY MICitMOND,VIHUINIA DOD 68 r
4, September 11, 1997 United States Nuclear Regulatory Commission Serial No.97-524 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the August 1997 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, l'< ) /&
W. R. Matthews Statloa Manager Enclosure gq '
cc: U. S. Nuclear Regulatory Commission Region ll Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station I
_. '.7 C 0 0 9709170110 970831 DR ADOCK 050003 8 hlllllllllllll<)l!.lllllll.l 3
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: Aucust YEAR .1997.
Approved:
b Station Manager
. + OFRRATIN3 DATA REPORT l t/CFit NO.1 50 330
, .. l.ATL t S eg't est e t $. 1991 Cptfi Act s M. h. 6 tat ti.ews IONt s 0406 464*2101 OrtkA1]N3 51 A.TV3
- 1. Unit liaset. ..... . . ... Werth Ar.na 1
- 2. keeportthe forledi. .. . . . ... .. . Aug#st 1671 l 3, 14 cert 963 Thettal Power (6 tdt s e . . . .. 2,tt)
- 4. hereglete Ratthe (Gross HHett. .. .... 694
$. tonign Electrical Datifit (Net HHelt. ... . 901
- 4. Heatmun t eg,enaat te Capacit y Gttee Hwel l . . . $4B 1 ha < spa t#per.dat,te Cat acit y Het HWell.. .. 461
- 4. !! chaneet Occur to Capetity latir gt (!temt 3 thru il pat.t's last tel. cit, gave 86a6Dnal N/A
- 9. Power level to which teettleted, if triy (Net Hdel t N/A
- 10. Dessons for testrictions, if any ti/A 2
ft.4p Hanth Y. t + 15 Cumulat ive 116 H>ute in Petettisig Petted. .. . .. .... .. . .. 144.0 6,031.0 160,t$1.0
!!. Hunt.et of Neut e ficact et was (titical . . . .. . . . 144,0 $,ltit 9 130,126,0
- 13. besct er he* erve shut aawn H>uta. . . . .. .. .. 0.0 46.0 1 C95.9
- 14. Haut p C.et.e t at or On-l.ine , . . . . . , .. . ,, .. . 144.0 6.064.6 !!),239.4
- 15. Unit baserve Shutdown Hours. .. . 0.0 0.0 0.0 16 Gross Theraial Energy cer etated tHwW). . .. . . . 2,151,020.1 14,401,444.0 341,045,100.4 11 Grose Elc1t tical Lnergy Genes ated (HWHl . . . . . .. .. . 10).4 H.0 4,149,804.0 146,392,460.0 l$. tiet tiect-ical inetay Generated Ote) . . .. . . . .. . 461,921.0 4.tl$.114.0 104.501,112.0
- 19. Unit fervice Factor . . 4. .... . . . . 100.Ct 56.9% 15.6%
- 20. Unit Avellactitty f actor. . .. . . . 100.0'. tt.ht 16.6%
- 21. Unit Capacaty f acter tusing H:.c Net) .. ... ..., .. .. ,, 101. $n _ g6.1% 10.8%
- 22. L'ait Cat =aett y Factor tusing 14R Net) . . . ..... 66.0% SS.4% (6.9%
- 23. foteed Dutage kate... . . .. .. .. . . . 0.0% 0.04 8.6%
- 24. Ehutdowria Scheduled Over Next 6 Hanths (Type, t> ate, turet ton of Evh _ N/A
- 21. If Shetaswn at end of Deport le: Lod. estJMtes t ane of stattunt N'A
- 26. Units in Test Status (Frior to commercial Ci eration):
forecast Achieved IDITIpa. CRITICALITY IN171AL ELECTRICITY CrAetEkclA1 C pef 4TICM
\L . . . _ -
AVERAGE DAILY UNIT POWER LEVEL Docket No.t 50-338 Unitt NA-1 Datet September 5, 1997
Contact:
W. R. Matthews Phonet (540) 894-2101 1
MONTH August 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (Mite-Nat) LEVEL (MWe-Het) 1 _
898 17 896 2 899 18 895 _
3 898 19 897 4 897 20 898 5 085 21 898 6 898 22 899 7 890 23 899 8 899 24 899 9 896 25 900 10 899 _ 26 900 11 898 ~
27 900 12 898 28 898 13' 898 29 899 14 897 30 899 15 d98 31 900
-16 898 Instructionst on this format, list the average daily unit power level in-MWe-Het for each-day in the reporting month, compute to the nearest whole megawatt.
HORTH NOE POWER STATICH UNIT HO.t J MJHTH: August i
l SOH4ARY OP OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data August 01, 1997 0000 Began month in Mode 1 at 100% power, 949 Hwe.
August 02, 1997 1615 Lowered unit power due to IB IV heater level oscillations, 99 % power 930 Hwe.
August 02, 1997 1630 Increased unit power after correction to level control valve 1B IV Heater level, 100% power, 946 Hwe. I i
August 04, 1997 2237 Commenced ramp down of unit for maintenance on 1B feedwater level control valve . 90% power 925 Hwe.
August 05, 1997 1338 Commenced ramp up to 100%. 98% power, 936 Hwe.
August 05, 1997 1355 Unit stable at 100% power, 945 Hwo.
August 09, 1997 0028 Commenced ramp to 890 Hwe for turbine valve freedom test.
August 09, 1997 0102 Stopped unit ramp at 93% power, 890 Hwe .
August 09, 1997 0136 Completed TVFT, ramping to 100% power.
August 09, 1997 0243 Unit stable at 100 % power,-946 Hwe.
August 31, 1997 2400 Ended month in mode-1 at 100-% power,-949 Hwe.
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet *.
Docket No.: 50-330_
Report Month August Unit H,une NA-1 Year _1997 Dates _ September 5, 199~/
Contact:
W. R. Matthews_
l
l
1 UNIT SEUTDOUUNS AND POWER REDUCTICOt3 j
,l DOCKET 980.: 50-339 CtCTIC+T: NA-1 OATE:3*pte h r 5,1997 .,
REPORT MONTH: AuJust 1997 C 2f*AO: W. R. Matthews FPor:E: (540) 894-2101 1 2 3 4 5 No. Cate Typ* D: ration Peason MethM of Licensee System Corp::mont Cause & Corrective thrs) Shutting Event Code Code Actien to Down Feactor Report 0 Frevent Recurrence
1: Type 2: Reason 3: Method 4:
F= Forced M Equi m t Failure (explain) 1-Manual Exhibit F - Instructions s= scheduled B-Maintenance or Test 2-Manual Scram for prweration of Data C-Refueling 3-Automatic Scram Entry Sheets for License.
> Regulatory Restriction 4-Continuations Event Report (LER) File E-Cperator Training & License Examination 5= Load Reduction (NUrCG-0161)
F-Administrative 9-Other G= Operational Error 5:
H-Other (explain)
Exhibit H - Same source
CPERATING DATA DSP097 toc 62T W3.s 14 33)
(Atta Septest.or 5, 1991 Colt! AC t a W. R. Mattf.ews PHONt1 ($40) $$4*2101 QPLPATING STATVS
- 1. Unit dames............ ................... North Anna 2
- 2. kepettlet F4tiodi................. ........ August 1991
- 3. Lt.sneed thermal Powet itMtit.......... .. fell)
- 4. pameplate hating (Gross Mwels.............. til
- 6. tesign t.ectrical P,ating (Wet Mutli.. ... .... 907
- 4. Masimum to;endable Car-acity (Grote Mwel a.... 944 1 Manimum fotendette Capacit y (Net Mwel s . . .. . . .. III
- t. If changes occur to Capacity katings titems 3 thru il since test report, give reasonas N/A
- 9. Power level to which testricted. if any (Net Mwel t N/A
- 10. Dessent for teatrictions, if aby: N/A a
l l
l This Month T*t-D Cumulative
- 11. Nouts in Deporting Petiod.. . . . , .. . ..... 144.0 S.931.0 146.619.0
- 12. Numa4r of House Peactor was Critical. .... . .............. 144.0 5.831.0 122,106.2 1). Peact or meser ve shutdown tiouro . . . . . . . ......... 0.0 0.0 1.163.2
- 14. Ilours Generator on Line........ .. . . . ... .. .......... 144.0 b.031.0 121,615.2
! 15. Unit koserve shutoown Hours. ... . .., ....... ..... 0.0 0.0 0.0
- 14. Gross Ttiermal Lnergy Generated (Mwin . ... . . ....... ......... 2,1$1.490.3 14.661,414.1 332,443,392.1
- 11. Gr os s Elec t r i cal Ene r g y Gene r a t es (Mww > . . . . . . . . . . . . . . . . . . . . . . . . . . . . 469.494.0 $,$09.391.0 100,110,626.0
- 10. Net Flect rical Energy r.enerated (MwH) . . . ..... . ..... ....... .... 664,411.0 8,243,640.0 103.936,130.0
- 19. Unit Service factot....... . ........ . ................... ...... 100.06 100.0% $1.0%
- 20. Unit Availatiilit y Factor. . . . . . . . . . .. ...... ......... 100.0% 100.0% 13.06
- 21. AJnit Cag acity f actor tusing MDC Net) . . . .. . .......... . .. .. 99.66 100.3% 19.3%
- 22. Unit Capacity Factor tuatog DLR Net). , . . .. .... . .. .... 90,St 69.1% 10.2%
- 23. f orced CNt a ge 644t e . . . . . . . . . . . , , , . ......... ..... .... 0.04 0.04 6.24
- 24. Shutdowns Sct.edgled Over Heat 4 Plonths (T)te, l' ate Duration of tach)1 N/A
- 26. If Shutdown at end of Pepost Period, estimated time of Startup: N/A
- 24. Units in feet Status (Prior to Commercial Operatick):
Forecast A Fieved
!NITI AL CRITICAL 17Y ,
IN!T1AL t1.tC7PICITY cCe94thC1/ OPLkAf!*W I
AVERAGE DAILY UNIT POWER LEVEL Docket No.t 50-339 Unit NA-2 Date: September 5, 1997
Contact:
W. R. Matthews l
Phonet J 5_4_0 ) 894-2101-l MDHTH: August 1997 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (Mite-Net) ' LEVEL (MWe-Net) 1 894 17 891 2 892 18 3
891 893 19 892 4 893 20 893 5 894 21 893 6 895 _22 893
- 7. 895 23 8
893 894 24 894 9 894 25 893 10 895 26 893 11 894 27 894 12 893 28 893 13 893 29 14 892 893 30 894 15 893 31 894 16 892 Instructions :
On this format, list the average daily _ unit _ power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
HORTH ANNA POWER STATION UNIT NO.1 2 HCHTH: August stM%RY OF OPERATING EXPERIENCE l Page 1 of 1 l
Listed below in chronological sequence is a summary of operating
' experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data August 01, 1997 0000 Began month in Mode 1 at 100% power, 943 Mwe.
-August 01, 1997 2310 Commenced-ramp down to 870 Mwe for turbine valve freedom test, from 100 % power, 938.5 Mwe.
August 02, 1997 0009 Completed TVFT, commenced ramp up to-100%
power from 91 % power .
August 02, 1997 0102 Unit stable at 100 % power, 937 Mwe.
August 29, 1997 2254 Commenced unit ramp down for turbine valve freedom test, from 100% power, 936 Mwe.
August 29, 1997 2359 Completed TVFT, ramping unit to 100 % power from 95 % power, 893 Mwe .
August 30, 1997 0136 Unit stable at 100 % power, 944 Mwe .
August 31, 1997 2400 Ended month in Mode 1 at 100% power, 943 Mwe.
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIOHs Explanation sheet Docket No.t 50-339 Report Month August Unit Name NA-2 Year: 1997 Date: September 5, 1997 Contactt W. R. Matthews
UNIT SHUTDOWNS AND POIER 3tEDUCTIONS -
DOCKET No.: 50-339 TWIT MAME: NA-2 DATE: Septerter 5,1997 REPORT MotCM: August 1997 CONTACT: W. R. Matthews
- FHONE: (5401 594-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Ctmponent Cause & Cctrective (hrs) Shuttine Event Code Code Action to Down Reactor Report # Frevent Recurrence
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Tailure (explain) 1= Manual Exhibit F - Instructions S-Scheduled B-Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LE'O Tile E= Operator Training & License Examination 5= Lead Reduction thJREG-0161) f=Adttinist r ative 9-Other G=0perational Error 5:
H-Other (explain) Exhibit H - Same Source
. _ _ _ _ _ . __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _