Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
g) . .
w.
VIRGINIA ELucTRIC AND PownH COMI%NY Ricnwonn,VIROINIA 20261 September 10,1998 United States Nuclear Regulatory Commission Serial No.98-537 A.ttention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINlA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT
)
Enclosed is the August 1998 Monthly Operating Report for North Anna Power Station Units 1 and 2.
I Very truly yours, it W. R. Matthews l Site Vice President Enclosure l Commitments made in this letter: None.
cc: U. S. Nuclear Regulatory Commission
! Region ll l Atlanta Federal Center
! 61 Forsyth St., SW, Suite 23T85 I Atlanta, Georgia 30303 i
. Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station , ,t 98091503P.7 900831 l, PDR ADOCK 05000338 /)'Y R PDR
,o. : a
i l
l 1
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT l AUGUST 1998 i
1 l
i t
r i
l 1
i l
Approved: , M Site Vice President N/ 3-%-)[
Date l
1 e
a a
1 i
_, - . _ . _ _ _ . _ . _ . _ _ _ . _ _ . . _ . _ _ . _ _ ..-.m. _ . _ _ . _ _ _ . . . _ _ . _ . . _ _ . _ _ .
i l OPERATING DATA REPORT Docket No.: 50-338 Date: 09/05/98 !
Contact:
W. R. Matthews Telephone: (540) 894-2101 :
- 1. Unit Name: ,, North Anna Unit 1 f
- 2. . Reporting Period:. August,1998 l 3. Licensed Thermal Power (MWt): 2,893
- 4. Nameplate Rating (Gross MWe): . 979.74 ,
- 5. Design Electrical Reting (Net MWe): 907 !
- 6. Maximum Dependable Capacity (Gross MWe): 940 y
- 7. Maximum Dependable Capacity (Net MWe): 893 j
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A i
- 9. Power Level Tu Which Restricted, if Any (Net MWe): N/A
- 10. teasons For Restrictions, if Any: N/A l
t This Month Year-To-Date Cumulative '
11, Hours in Reporting Period 744.0 5,831.0 177,011.0
- 12. Hours Reactor Was Critical 744.0 5,831.0 139,086.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 7,095.0
- 14. Hours Generator On-Line 744.0 5,773.0 105,940.4 l l 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 I
- 16. Gross Thermal Energy Generated (MWH) 2,151,925.9 16,585,792.3 367,120,264.8
- 17. Grots Electrical Energy Generated (MWH) 698,157.0 5,405,352.0 157,576,005.0
- 18. Net ElecW ul E,crgy Generated (MWH) 663,578.0 5,140,085.0 114,284,268.0 i 19. Unit Service Factor 100.0 % 99.0 % 76.8 %
- 20. Unit Avallability Factor 100.0 % 99.0 % 76.8 %
- 21. Unit Capacity Factor (Usirig MDC Net) 99.9% 98.7 % 72.2 %
- 22. Unit Capacity Factor (Using DER Net) 98.3 % 97.2%
{
71.2 %
- 23. Unit Forced Outage Rate 0.0% 1.0% 8.0%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling, September 13.1998, 35 Dyys j 25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A
- 26. Unit in Test Status (Prior to Commercial Operation):
l l
FORECAST ACHIEVED I
I INITIAL CRITICALITY
, INITIAL ELECTRICITY COMMERCIAL OPERATION l
$ I l
l I
J I 4 l
....-. . . - - - . . - . - . . . -- . . . . - - - . - . _ - . - . . . . -. - . -.. _ ~ ... - . . - .
,- i AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 i Unit Name: North Anna Unit 1 !
Date: 09/05/98 l
Contact:
W. R. Matthews j j Telephone: (540) 894-2101
- MONTH: August,1998 l
l Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) '
1 895 17 890 2 895 18 890 l 3 895 19 891 4 894 20 893 l
5- 894 21 892 6 894 22 892 7 894 .23 891 8 893 24 891
! 9 894 25 890 t
l 10 894 26 889 l
l 11 692 _-
27 888 12 893 28 891 13 891 29 892 l 14 890 30 892 i
)
15 891 31 891 l 16 890 INSTRUCTIONS i.
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
3.
5.
4 _ _ - . _ _ , , . . ~ . _ . _ , . . _ , - , - . . . .,_, . ,. .
__ _ -. , m-.. -
- - . - . ._. . .. . ~ . . - ~ . - - - . - - - - - . - - . . _ . - . _ . . . . . . . - . . . . - . - - . . . _ . .
l .
1.
l- . .
- J i
l Docket No.: 50-338 UnR Name: Nodh Anna Unit i
- l. Date: 09/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION I UNIT NO.: j, .,
MONTH: August 1998
SUMMARY
OF OPERATING EXPERIENCt!
Page 1 of 1 )
Usted below in chronological sequence is a surnmary of operating experiences for this month which required load I reductions or resulted in significant ncn-load related incidents. l l
ggg . Time pga l 1
August 01,1998 0000 Began month in Mode 1, at 100% power,938 MWe.
August 31,1998 2400 Ended the month in Mode 1, at 100% power, 933 MWe.
1 l
l l
i i
i d
i e
9 7 . . , , - - , .-. . . , . . - e
. . . . . - . ...-. -. - - . . . . . - . - ~ . - _ ~ . - . . ._~ - ~~,- _ . - . ~ . - , , , _ . - . . . - - -
4
\ .
l*
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 09/05/98
Contact:
W. R. Matthews Telephone: (540)894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQuALTo on GnEATEn THAN 20%)
REPORT MONTH: August,1998 (1) (2) (3) (4) (5)
Method Duration of LER No. System Component Cause & Conective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down l Reactor NA NA NA NA NA NA NA NA NA I
None during the reporting period.
l l
i 1
i l
l 1
(1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2- Manual Scram C- Refueling 3- Automatic Scram D- Regulatory Restriction 4- Other (Explain) '
E- Operator Training & Licensing Examination F- Administrative i G- Operational Error (Explain)
[ (4) (5)
- Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) 1 i
4 4
5 4
i i
_ . ~ . , _ , _ . . _ . . , . , , . , , . . . - _ , , . . ,
l OPERATING DATA REPORT Docket No..: 50-339 Date: 09/05/98 I
Contact:
W. R. Matthews l Telephone: (540) 894-2101 l
- 1. Unit Name: ,
Nortn Anna Unit 2 l
- 2. Reoorting Period;. , August,1998 !
- 3. Licensed Therrnal Power (MWt): . 2,893 I
- 4. Narneplate Rating (Gross MWe): ,
979 ;
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): . 944 )
i
- 7. Maximum Dependable Capacity (Net MWe): 897
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, if Any: N/A This Month Year-To-Date Cumulative 11, Hours in Reporting Period 744.0 5,831.0 -155,279.0
- 12. Hours Reactor Was Critical 744.0 5,160.8 130,876.0
- 13. Reactor Reserve Shutdown Hours 0.0 40.9 7,225.1
.14. Hours Generator On-Line 744.0 5,142.6 129,664.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2,152,044.6 14,533,457.5 355,326,637.5
- 17. Gross Electrical Energy Generated (MWH) 695,636.0 4,723,164.0 116,225,678.0
- 18. Net Electrical Energy Generated (MWH) 660,784.0 4,487,445.0 111,015,413,0
- 19. Unit Service Factor 100.0 % 88.2 % 83.5 %
- 20. Unit Availability Factor 100.0 % 88.2 % 83.5 %
l 21. Unit Capacity Factor (Using MDC Net) 99.0 % 85.8 % 79.5 %
! 22. Unit Capacity Factor (Using DER Net) 97.9 % 84.8 % 78.8 %
- 23. Unit Forced Outa9e Rate 0.0% 0.0% 4.9%
t
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A l l
- 26. Unit in Test Status (Prior to Commercial Operation):
l
, FORECAST ACHIEVED INITIAL CRITICALITY
! INITIAL ELECTRICITY 3'
COMMERCIAL OPERATION 1
t j
4 l.
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 09/05/98
Contact:
W. R. Matthews Telephone. (540) 894-2101 MONTH: August,1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1- 888 17 888 2 890 18 887 5 l
3 891 19 889 i 4 891 20 890 I 4
5 890 21 889 i
6 890 22 890 I 1
7 889 23 888 i
8 888 24 887 l
9 888 25 887 10 888 26 886 11 889 27 885
. 12 889 28 887 0 13 888 29 886 14 888 30 886 15 888 31 886 16 888 _
l l
INSTRUCTIONS
. On this format, list the average daily unit power level in MWe - Net for each day in the reporting tronth. Compute
- to the nearest whole megawatt.
a
- c. , . - . - - - , -
. . - - . , + . - - . . , -
= >
Docket No.: 50-339 Unit Name: North Ama Unit 2 Date: 09/05/98
Contact:
W. R Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT No.:2 MONTH: August 1998 l
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
Date Time t ga,ta August 1,1998 0000 Began the month in Mode 1,92% power,872 MWe. Turbine Valve Freedom l Test (TVFT)in progress. !
l 0014 TVFT completed satisfactorily.
0045 Ramped unit to 100% power,931 Mwe.
August 31,1998 2400 Ended the month in Mode 1,100% power,933 MWe.
1 i
l i
l.
l e
d
I l
1 Docket No.: 50-339 I Unit Name: North Anna Unit 2 Date: 09/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To om GREATER THAN 20%) l i
REPORT MONTH: August,1998 (1) (2) (3) (4) (5)
Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Preven,t Recurrence Down Rx None during the reporting period.
l l
l l
(1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2- Manual Scram C- Refueling 3- Automatic Scram D- Regulatory Restriction 4 -' Other (Explain)
- E- Operator Training & Licensing Examination
- i. F- Administrative G- Operational Error (Explain)
, (4) (5)
- . Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) 4 4
4 1
i 4
4
, _ _