MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
VIROINIA ELECTRIC AND POWER COMPANY HIctruonn, VIRGINIA 23261 July 12, 1996 l
l United States Nuclear Regulatory Commission Serial No.96-362
- Attention
- Document Control Desk NLOS/RPC l Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 l MONTHLY OPERATING REPORT Enclosed is the June 1996 Monthly Operating Report for North Anna Power Station l Units 1 and 2.
Very truly yours, a2 M. L. Bowling, Manager Nuclear Licensing and Operations Support 1
Enclosure cc: U.S. Nuc' ear Regulatory Commission Region 11 101 Marietta Street, NW
! Suite 2900 Atlanta, Georgia 30323 l Mr. R. D. McWhorter NRC Senior Resident inspector i
North Anna Power Station 9607190018 960630 ,i
.M Vj l PDR ADOCK 05000338 R PDR ,}(,[ V si
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: June YEAR: 1996 ,
f i
I l
1 1
Approved: l b ,
Station Manager 1
. OPERATING DATA REPORT DOCKET No.: 50-338 j
. DATE: July 5, 1996 '
CONTACT: W. R. Matthews i
PHONE: (540) 894-2101 OPERATING STATUS
- 1. Unit Name:................................ North Anna 1
- 2. Reporting Per i od: . . . . . . . . . . . . . . . . . . . . . . . . . June 1996
- 3. Licensed Thermal Power (MWt):............. 2,893 i
- 4. Nameplate Rating (Gross MWe):............. 994 I S. DIsign Electrical Rating (Net MWe):....... 907
- 6. MIximun Depe xiable Capacity (Gross MWe):.. 940
- 7. M ximun Dependable Capacity (Net MWe):.... 893 l
l
- 8. If changes occur in capacity Ratings (!tems No. 3 thru 7) since last report, give reasons: N/A
)
1 l
- 9. Power level to which restricted, if any (Net MWe): N/A
- 10. Rsasons for restrictions, if any: N/A j 1
This Month Y-t-D Cunulative
- 11. Nours in Reporting Period................................. 720.0 4,367.0 158,003.0
- 12. Number of Hours Reactor was critical...................... 720.0 3,666.5 120,852.9
- 13. Rzactor Reserve Shutdown Hours............................ 0.0 43.0 6,994.4 l
- 14. Hours Generator 0n-Line................................... 720.0 3,638.7 117,826.2 l
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0 )
- 16. Gross Thermal Energy Generated (MWM)...................... 2,082,389.8 9,754,567.5 315,068,304.6 l 17 reoss Electrical Energy Generated (MWH)...........e,.. 683,683.0 3,207,312.0 140,537,925.0 j
- 18. . Electrical Energy Generated (MWH)..................... 649,815.0 3.043,517.0 90,084,671.0
- 19. Unit Service Factor....................................... 100.0% 83.3% 74.6% )
- 20. Unit Availability Factor.................................. 100.0% 83.3% 74.6% !
- 21. Uni t Capaci ty Factor (us i ng MDC Net ) . . . . . . . . . . . . . . . . . . . . . . 101.1% 78.0% 69.5%
- 22. Uni t Capaci ty Fact or (usi ng DE R Net ) . . . . . . . . . . . . . . . . . . . . . . 99.5% 76.8% 68.4%
- 23. Forced Outage Rate................. ...................... 0.0% 0.0% 9.1% ]
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
J
l .
I AVERAGE DAILY UNIT POWER LEVEL i
Docket No.: 50-338 Unit: NA-1 Date: Julv 5, 1996 Contact W.R. Matthews Phone: (540) 894-2101 MONTH: June 1996 l
I l
l DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Ne t) 1 906 17 903 2 906 18 902 3 905 19 901 4 905 20 901 5 905 21 900 6 905 22 901 7 901 23 900 8 905 24 899 9 905 . 25 899 10 905 26 900 11 904 27 899 12 905 28 899 13 904 29 899 l 14 904 30 899 15 904 16 904 l
l Instructions:
l On this format, list the average daily unit power level in MWe-j Net for each day in the reporting month. Compute to the nearest
- whole megawatt.
i
{
1 l
t _
i NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: June
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related' incidents.
Date Time Data June 01, 1996 0000 Began month with unit at 100% power, 953 MWe.
June 07, 1996 0816 Commenced ramp down from 100% power, 953 MWe for Turbine Valve Freedom Test (TVFT). l 0859 Unit stable at 91.4% power, 880 MWe.
0927 Cott.menced ramp from 91% power to 100% power after completion of TVFT.
1120 Unit stable at 100% power, 950 MWe.
June 30, 1996 2400 Ended month with unit stable at 100% power, 947 MWe.
I I
I i
1 eV. .J
~
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.. 50-338 Report Month June Unit Name: NA-1 Year: 1996 Date: Julv 5, 1996
Contact:
W. R. Matthews
i i
Y
UNIT SHUTDOWMS AND POWER REDUCTIONS .
DOCKET NO.: 50-338 .
UNIT NAME: NA-1 DATE: July 5, 1996 REPORT MONTH: June 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code code Action to Down Reactor Report # Prevent Recurrence o No Entry This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source s
____.r_______.._____________________._____..____.________.____.____________.__.___._._______u__.__. _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _. m _
, OPERATING DATA REP 02T DOCKET No.: 50-339
. DATE: July 5, 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 OPERATING STATUS
- 1. Uni t Name : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Nort h Anna 2
- 2. R eport i ng Per i od: . . . . . . . . . . . . . . . . . . . . . . . . . June 1996
- 3. Licensed Thermal Power (MWt) ............. 2893
- 4. Nameplate Rating (Gross MWe):............. 979
- 5. D sign Electrical Rating (Net MWe):....... 907
. 6. Maxinun Dependable Capacity (Gross MWe):.. 944
- 7. C: ximum Dependable capacity (Net MWe):.... 897
- 8. If changes occur in capacity Ratings (ltems No. 3 thru 7) since last report, give reasons: N/A 9 Power level to which restricted, if any (Net MWe): N/A
- 10. Riasons for restrictions, if any: N/A This Month Y-t-D Cumulative
- 11. Hours i n Repor t i ng Per i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 720.0 4,367.0 136,271.0
- 12. Nunber of Hours Reactor was Cri t ical . . . . . . . . . . . . . . . . . . . . . . 720.0 4,367.0 114,424.6
- 13. Riactor Reserve Shutdown Hours............................ 0.0 0.0 6,535.0
- 14. Hours Generator 0n-Line................................... 720.0 4,367.0 113,290.1
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) . . . . . . . . . . . . . . .. . . . . . 2,082,349.3 12,630,434.8 308,607,673.5
- 17. Gross E lect r i cal Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . 682,561.0 4,154,379.0 100,985,797.0
- 18. tat E lect r ical Energy Generated (MWH) . . . . . . . . . . . . . . . . . . . . . 648,520.0 3,955,105.0 96,526,744.0
- 19. Unit Service Factor....................................... 100.0% 100.0% 83.1%
- 20. Unit Availability Factor.................................. 100.0% 100.0% 83.1%
- 21. Unit Capacity Factor (using MDC Net)...... ............... 100.4% 101.0% 78.7%
- 22. Unit Capacity Factor (using DER Net)...................... 99.3% 99.9% 78.1%
- 23. Forced Outage Rate........................................ 0.0% 0.0% 4.7%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Scheduled Refueling
_ outage, September 7, 1996, duration = 30 days.
- 25. If Shutdown at end of Report Period, estimated time of Startup: N/A
- 26. Units in Test Status (Prior to Connercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION A
. AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit: NA-2 Date: Julv 5, 1996 Contact W.R. Matthews Phone: (540) 894-2101 MONTH: June; 1996 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 905 17 901 2 904 18 901 3 903 19 900 4 903 20 899 5 903 21 898 6 903 22 899 7 903 23 898 8 903 24 898 9 903 25 898 ,
10 903 26 899 i 11 902 27 899 '
12 902 28 898 ,
13 903 29 898 14 897 30 898 -
15 902 16 902 i
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l w
. NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: June
SUMMARY
OF OPERATING RYPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data June 01, 1996 0000 Began month with unit stable at 100% power, 953 MWe.
June 14, 1996 0758 Commenced unit rampdown for Turbine Valve Freedom Test. Unit at 100% power, 949 MWe.
0830 Unit stable at 90.5% power, 865 MWe.
0845 Turbine Valve Freedom Test completed.
0923 Commenced ramp up from 90.5%, 86S MWe, 1038 Unit stable at 100% power, 945 MWe.
June 30, 1996 2400 Ended month with unit stable at 100% power, 945 Mwe.
l 1
a P<
Page 1 of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-339 Report Month June Unit Name: NA-2 Year: 1996 Date: July 5. 1996
Contact:
W. R. Matthews
I
DOCKET NO.: 50-339' -
UNIT NAME: NA-2 DATE: July 5, 1996 ,
REPORT MONTH: June 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence o No Entry This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source