VIROINIA ELECTRIC AND POWER COMPANY HIctruonn, VIRGINIA 23261 July 12, 1996 l
l United States Nuclear Regulatory Commission Serial No.96-362 Attention: Document Control Desk NLOS/RPC l
Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 l
MONTHLY OPERATING REPORT Enclosed is the June 1996 Monthly Operating Report for North Anna Power Station l
Units 1 and 2.
Very truly yours, a2 M. L. Bowling, Manager Nuclear Licensing and Operations Support 1
Enclosure cc:
U.S. Nuc' ear Regulatory Commission Region 11 101 Marietta Street, NW Suite 2900 Atlanta, Georgia 30323 l
Mr. R. D. McWhorter NRC Senior Resident inspector i
North Anna Power Station 9607190018 960630
,i Vj l
PDR ADOCK 05000338
.M
,}(,[ V R
PDR s i
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:
June YEAR:
1996 f
i I
l 1
1 Approved:
b Station Manager 1
OPERATING DATA REPORT DOCKET No.:
50-338 j
DATE: July 5, 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 i
OPERATING STATUS 1.
Unit Name:................................ North Anna 1 2.
Reporting Per i od:......................... June 1996 3.
Licensed Thermal Power (MWt):.............
2,893 i
4.
Nameplate Rating (Gross MWe):.............
994 I
S.
DIsign Electrical Rating (Net MWe):.......
907 6.
MIximun Depe xiable Capacity (Gross MWe):..
940 7.
M ximun Dependable Capacity (Net MWe):....
893 l
l 8.
If changes occur in capacity Ratings (!tems No. 3 thru 7) since last report, give reasons:
N/A
)
1 9.
Power level to which restricted, if any (Net MWe):
N/A
- 10. Rsasons for restrictions, if any:
N/A j
1 This Month Y-t-D Cunulative
- 11. Nours in Reporting Period.................................
720.0 4,367.0 158,003.0
- 12. Number of Hours Reactor was critical......................
720.0 3,666.5 120,852.9
- 13. Rzactor Reserve Shutdown Hours............................
0.0 43.0 6,994.4 l
- 14. Hours Generator 0n-Line...................................
720.0 3,638.7 117,826.2
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0 0.0
)
- 16. Gross Thermal Energy Generated (MWM)...................... 2,082,389.8 9,754,567.5 315,068,304.6 17 reoss Electrical Energy Generated (MWH)...........e,..
683,683.0 3,207,312.0 140,537,925.0 j
18.
. Electrical Energy Generated (MWH).....................
649,815.0 3.043,517.0 90,084,671.0
- 19. Unit Service Factor.......................................
100.0%
83.3%
74.6%
)
- 20. Unit Availability Factor..................................
100.0%
83.3%
74.6%
- 21. Uni t Capaci ty Factor (us i ng MDC Net )......................
101.1%
78.0%
69.5%
- 22. Uni t Capaci ty Fact or (usi ng DE R Net )......................
99.5%
76.8%
68.4%
- 23. Forced Outage Rate.................
0.0%
0.0%
9.1%
]
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION J
l I
AVERAGE DAILY UNIT POWER LEVEL i
Docket No.:
50-338 Unit:
NA-1 Date:
Julv 5, 1996 Contact W.R. Matthews Phone:
(540) 894-2101 MONTH: June 1996 l
I l
l DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Ne t) 1 906 17 903 2
906 18 902 3
905 19 901 4
905 20 901 5
905 21 900 6
905 22 901 7
901 23 900 8
905 24 899 9
905 25 899 10 905 26 900 11 904 27 899 12 905 28 899 13 904 29 899 l
14 904 30 899 15 904 16 904 l
l Instructions:
l On this format, list the average daily unit power level in MWe-j Net for each day in the reporting month.
Compute to the nearest whole megawatt.
i
{
1 l
t
i NORTH ANNA POWER STATION UNIT NO.:
1 MONTH:
June
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related' incidents.
Date Time Data June 01, 1996 0000 Began month with unit at 100% power, 953 MWe.
June 07, 1996 0816 Commenced ramp down from 100% power, 953 MWe for Turbine Valve Freedom Test (TVFT).
0859 Unit stable at 91.4% power, 880 MWe.
0927 Cott.menced ramp from 91% power to 100% power after completion of TVFT.
1120 Unit stable at 100% power, 950 MWe.
June 30, 1996 2400 Ended month with unit stable at 100% power, 947 MWe.
I I
i eV.
.J
~
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No..
50-338 Report Month June Unit Name:
NA-1 Year:
1996 Date: Julv 5, 1996
Contact:
W.
R. Matthews No entry this month.
i i
Y
UNIT SHUTDOWMS AND POWER REDUCTIONS DOCKET NO.:
50-338 UNIT NAME:
NA-1 DATE: July 5, 1996 REPORT MONTH: June 1996 CONTACT:
W.
R. Matthews PHONE: (540) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code code Action to Down Reactor Report #
Prevent Recurrence No Entry This Month o
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source s
.r u
m
OPERATING DATA REP 02T DOCKET No.:
50-339 DATE: July 5, 1996 CONTACT:
W. R. Matthews PHONE: (540) 894-2101 OPERATING STATUS 1.
Uni t Name :................................ Nort h Anna 2 2.
R eport i ng Per i od:......................... June 1996 3.
Licensed Thermal Power (MWt).............
2893 4.
Nameplate Rating (Gross MWe):.............
979 5.
D sign Electrical Rating (Net MWe):.......
907
. 6.
Maxinun Dependable Capacity (Gross MWe):..
944 7.
C: ximum Dependable capacity (Net MWe):....
897 8.
If changes occur in capacity Ratings (ltems No. 3 thru 7) since last report, give reasons:
N/A 9 Power level to which restricted, if any (Net MWe):
N/A
- 10. Riasons for restrictions, if any:
N/A This Month Y-t-D Cumulative
- 11. Hours i n Repor t i ng Per i od.................................
720.0 4,367.0 136,271.0
- 12. Nunber of Hours Reactor was Cri t ical......................
720.0 4,367.0 114,424.6
- 13. Riactor Reserve Shutdown Hours............................
0.0 0.0 6,535.0
- 14. Hours Generator 0n-Line...................................
720.0 4,367.0 113,290.1
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)..................... 2,082,349.3 12,630,434.8 308,607,673.5
- 17. Gross E lect r i cal Energy Generat ed (MWH)...................
682,561.0 4,154,379.0 100,985,797.0
- 18. tat E lect r ical Energy Generated (MWH).....................
648,520.0 3,955,105.0 96,526,744.0
- 19. Unit Service Factor.......................................
100.0%
100.0%
83.1%
- 20. Unit Availability Factor..................................
100.0%
100.0%
83.1%
- 21. Unit Capacity Factor (using MDC Net)......
100.4%
101.0%
78.7%
- 22. Unit Capacity Factor (using DER Net)......................
99.3%
99.9%
78.1%
- 23. Forced Outage Rate........................................
0.0%
0.0%
4.7%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Scheduled Refueling
_ outage, September 7, 1996, duration = 30 days.
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
- 26. Units in Test Status (Prior to Connercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION A
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-339 Unit:
NA-2 Date:
Julv 5, 1996 Contact W.R. Matthews Phone:
(540) 894-2101 MONTH: June; 1996 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 905 17 901 2
904 18 901 3
903 19 900 4
903 20 899 5
903 21 898 6
903 22 899 7
903 23 898 8
903 24 898 9
903 25 898 10 903 26 899 i
11 902 27 899 12 902 28 898 13 903 29 898 14 897 30 898 15 902 16 902 i
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
w
NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:
June
SUMMARY
OF OPERATING RYPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data June 01, 1996 0000 Began month with unit stable at 100% power, 953 MWe.
June 14, 1996 0758 Commenced unit rampdown for Turbine Valve Freedom Test.
Unit at 100% power, 949 MWe.
0830 Unit stable at 90.5% power, 865 MWe.
0845 Turbine Valve Freedom Test completed.
0923 Commenced ramp up from 90.5%, 86S MWe, 1038 Unit stable at 100% power, 945 MWe.
June 30, 1996 2400 Ended month with unit stable at 100% power, 945 Mwe.
a P<
Page 1
of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 Report Month June Unit Name:
NA-2 Year:
1996 Date: July 5.
1996
Contact:
W.
R. Matthews No entry this month.
I
DOCKET NO.:
50-339' UNIT NAME:
NA-2 DATE: July 5, 1996 REPORT MONTH: June 1996 CONTACT: W.
R. Matthews PHONE: (540) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence o No Entry This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
-