MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
. _ . - - . . _- . . - , - . = . .
VIRGINIA ELECTRIC AND Powen COMI'ANY
- , RICIIMOND,VIROINIA 200 61 November 8,1995 4
i U. S. Nuclear Regulatory Commission Serial No.95-580 Attention: Document Control Desk NL&OS/JHUCMC Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 .
l Gentlemen: l VIRGINIA ELECTRIC AND POWER COMPANY l NORTH ANNA POWER STATION UNITS 1 AND 2 '
MONTHLY OPERATING REPORT Enclosed is the October 1995 Monthly Operating Report for North Anna Power Station )
Units 1 and 2. l Very truly yours, R. F. Saunders Vice President-Nuclear Operations Enclosure cc: U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 j
Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station
.<.4 i s i i V '_ e1 ;
951114o138 951031 .
PDR ADOCK 0500o338 /
R PDR l l
_ - . . . . . ~.. . ~ . . . . . . .. - .. . .- .-. .
4 l
i j
i VIRGINIA POWER COMPANY !
NORTH ANNA POWER STATION !
MONTHLY OPERATING REPORT l 1
1 MONTH: October YEAR: 1995 1 l l l
1 l ,
I l
l l
I f ,
l Approved:
Oh ELL' -
pT stauon Manager m ----
. OPERATING DATA REPORT
. DOCKET NO.: 50-338 DATE: November 5, 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS
- 1. Unit Name:................................ North Anna 1
- 2. R eport i ng Per i od: . . . . . . . . . . . . . . . . . . . . . . . . 0c t ober 1995
- 3. Licensed Thermal Power (MWt):............. 2,893
- 4. Nameplate Rating (Gross MWe):............. 994
- 5. Design Electrical Rating (Net MWe):....... 907
- 6. Maximum Dependable capacity (Gross MWe):.. 940
- 7. Maxiran Dependable Capacity (Net MWe):.... 893
- 8. If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons: N/A
- 9. Power level to which restricted, if any (Net MWe): _N /A
- 10. Reasons for restrictions, if any: N/A This Month Y t-D Cumulative
- 11. Hours i n R eport i ng Per i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 745.0 7,296.0 152,172.0
- 12. Nunber of Hours Reactor was Cr i t ical . . . . . . . . . . . . . . . . . . . . . . 745.0 7,274.6 115,722.4
- 13. R: actor Reserve Shutdown Hours............................ 0.0 20.9 6,951.4 it. Hours Generator 0n-Line................................... 745.0 7,269.8 112,723.5
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH ) . . . . . . . . . . . . . . . . . . . . . . 2,154,437.2 20,960,264.4 301,145,844.3
- 17. Gross Electrical Energy Generated (MWH)................... 706,678.0 6,878,827.0 98,954,447.0
- 18. nit Electrical Energy Generated (MWH)..................... 671,999.0 6,541,165.0 93,743,451.0
- 19. Unit Service Factor....................................... 100.0% 99.6% 74.1%
- 20. Unit Availability Factor.................................. 100.0% 99.6% 74.1%
- 21. Unit Capacity Factor (using MDC Net)...................... 101.0% 99.9% 68.9%
- 22. Uni t Capaci ty Fact or (using DER Net) . . . . . . . . . . . . . . . . . . . . . . 99.5% 98.8% 67.9%
- 23. Ftrced Outage Rate........................................ 0.0% 0.4% 9.4%
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_ Refueling Outage Scheduled far February 10, 1995, Duration 34 Days
- 25. If Shutdown at end of Report Period, estimated time of Startup: _N/A
- 26. Units in Test Status (Prior to Connercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
l AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 l Unit: NA-1
! Date: November 5, 1995 Contact J. A. Stall Phone: (703) 894-2101 l
l MONTH: October 1995 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) t- 1 902 17 904 l 2 902 18 905 l 3 901 19 901 l 4 901 20 902 5 901 21 902 6 901 22 901 7 901 23 901 8 901 24 901 9 902 25 902 10 904 26 901 11 904 27 894 12 904 28 903 13 904 29 902 14 904 30 902 15 905 31 902 16 903 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, I
NORTH ANNA POWER STATION I
.. i UNIT NO.s 1 MONTH: October
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 ,
Listed below in chronological sequence is a summary of operating i experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data i I
October 01, 1995 0000 Began month with unit at 100% power, 948 MWe.
October 27, 1995 0918 Commenced power reduction from 100%, 948 MWe for l Turbine Valve Freedom Test (TVFT).
1004 Unit stable at 93% power, 875 MWe for TVFT.
1111 Completed TVFT satisfactorily.
1133 Commenced ramp up to 100% power from 92% power, 873 MWe, 1245 Unit stable at 100% power, 944 MWe.
October 31, 1995 2400 Ended month with unit at 100% power, 947 MWe.
l l
1 i
. Page 1 of __1 i
UNIT SHUTDOWN AND POWER REDUCTIONS i Explanation Sheet I Docket No.: 50-338 Report Month October Unit Name: NA-1 Years 1995 Date: November 5, 1995
Contact:
J. A. Stall
i 1
l l
l i
i I
i l
l l
l.
l i
L 4
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-338 UNIT NAME: NA-1, DATE: November 5, 1995 REPORT MONTH: October 1 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence o No Entry This Month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source
. OPERATING DATA REPORT l
.' DOCKET Wo.: 50-339 DATE: November 5,1995 ,
CONTACT: J. A. Stall J PHONE: (703) 894-2101 i
l i
OPERATING STATUS
- 1. Unit Name:................................ North Anna 2
- 2. Repor t i ng Per i od: . . . . . . . . . . . . . . . . . . . . . . . . 0ctober 1995
- 3. Licensed Thermal Power (MWt) ............. 2893
- 4. Nameplate Rating (Gross MWe):............. 979
- 5. Design Electrical Rating (Net MWe):....... 907
- 6. Maximun Dependable Capacity (Gross MWe):.. 944
- 7. Maximum Dependable Capacity (Net MWe):.... 897 j i
l
- 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons: N/A
)
- 9. Power level to which restricted, if any (Net MWe): N/A
- 10. R;csons for restrictions, if any: N/A l
This Month Y-t D Cumulative i
- 11. Hours i n R eport i ng Per i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 745.0 7,296.0 130,440.0
- 12. Number of H ours R eactor was Cri t i cal . . . . . . . . . . . . . . . . . . . . . . 745.0 5,685.7 108,619.2 j
- 13. R actor Reserve Shutdown Hours............................ 0.0 1.3 6,510.2 l
- 14. H our s Generat or 0n- L i ne. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 745.0 5,653.9 107,489.6 l
- 15. Unit Reserve Sherdown Hours............................... 0.0 0.0 0.0 l
- 16. Gross The rmal Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . . . 2,149,192.2 15,236,340.1 291,852,304.1 '
- 17. Gross E lectri cal Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . 708,837.0 4,993,762.0 95,470,619.0
- 18. N;t E lect ri cal Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . . . 674,144.0 4,735,B81.0 91,275,849.0
- 19. Unit Service Factor....................................... 100.0% 77.5% 82.4%
- 20. Unit Availability Factor.................................. 100.0% 77.5% 82.4%
- 21. Unit Capacity Factor (using MDC Net)...................... 100.9% 72.8% 77.8%
- 22. Uni t capaci ty Factor (us i ng DER Net ) . . . . . . . . . . . . . . . . . . . . . . 99.8% 71.6% 77.2%
- 23. Fcreed Outage Rate........................................ 0.0% 0.0% 4.9%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A j i
l i
- 25. If Shutdown at end of Report Period, estimated time of Startup: N/A
]
- 26. Units in Test Status (Prior to Commercial Operation): !
Forecast Achieved l INITIAL CRITICALITY ]
INITIAL ELECTRICITY COMMERCIAL OPERATION
__ _ _ . = . . . . _ . ._ .
- t c
AVERAGE DAILY UNIT POWER LEVEL i i
Docket No.: 50-339 Unit: NA-2 L November 5, 1995 l
Dates i
Contact J. A. Stall -
Phone: (703) 894-2101 l l i
I l MONTH: October 1995 ;
f i
f DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 910 17 906 2 909 18 907 '
- 3 908 ,
19 909 4 908 20 909 5 908 21 909 ,
6 841 22 909 l
7 884 23 909 l l 8 907 24 909 l 9 906 25 910 10 905 26 909 11 905 27 909 -
12 904 28 910 13 905 29 910 i 14 905 30 910 l
15 906 31 911 l 16 905 i
1 i
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
4 1
l l
i _ _
, . NORTH ANNA POWER STATION UNIT NO.: 2
. MONTH: October
SUMMARY
OF OPERATING EXPERIENCE
~
Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data October 01, 1995 0000 Began month with unit stable at 100% power, 954 MWe.
October 06, 1995 0738 Commenced unit ramp down for Turbine Valve Freedom Test (TVFT) from 100% power, 946 MWe.
- 0809 Unit stable at 90% power, 862 MWe, 0900 Completed TVFT satisfactorily. Holding power ,
at 90% for Condenser Waterbox inspections. !
October 07, 1995 0418 Commenced unit ramp . following "A" Condenser Waterbox maintenance from 90% power, 854 Mwe. -
One tube was plugged. I i
l 0517 Stopped ramp at 98% power, 924 Mwe for calorimetric. -
l 0625 Commenced ramp to 100% power.
I
! 0647 Unit stable at 100% power, 947 Mwe. j l
l October 31, 1995 2400 Ended month with unit stable at 100% power, l 959 Mwe. l l
l I
1 l
i I
l
. . . . ~ . . . . _ . . . . . _ - . . . . . _ - . . ~.. . . ..
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-339 Report Month October Unit Names NA-2 Year 1995 Date November 5, 1995
Contact:
J. A. Stall
l t
I r t
e t
i l
L f
i
L' .
DOCKET NO.: 50-339- ' " '
UNIT NAME: ; N A - 2'. .
DATE: November 5, 1995 REPORT MONTH: October 1 1995 CONTACT: J. A. Stal-1 ;
PHONE: (703) 894-2101' i
1 2 3 4 5 Mo.
Date Type Duration Reason Method of Licensee System- Component Cause & Corrective (hrs) Shutting Event Code Code ' Action-to Down Reactor Report # Prevent Recurrence ONo Entry This Month 1: Type 2: Reason 3: Method. 4: I F= Forced A= Equipment Failure (explain)- 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data' 2 C= Refueling 3= Automatic Scram- Entry Sheets for Licensee {
D= Regulatory Restriction 4= Continuations Event Report (LER) File '
E= Operator Training & License Examination 5= Load Reduction (NUREG-0161) '
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H .Same Source i