MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
. -.
VIHOINIA 13LECTHIC AND Powen ConIwxy IIIclI M O ND, VIR GINI A 2112 61 October 3,1996 United States Nuclear Regulatory Commission Serial No.96-511 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September 1996 Monthly Operating Report for North Anna Power Station Unit 1 and 2.
I Very truly yours, 4 //s w kt Y < w W. R. Matthews Station Manager Enclosure 1
cc: U. S. Nuclear Regulatory Commission l Region ll 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 ,
s Mr. R. D. McWhorter
\
NRC Senior Resident inspector North Anna Power Station '\(
'~
/
9610160298 960930 PDR ADOCK 05000338 R PDR
L .
l l
I 1
I l
I VIRGINIA POWER COMPANY NORTH ANNA POWER STATION
) MONTHLY OPERATING REPORT l MONTH:Sentember YEAR: 1996 1
I 1
I l
J l
Approved:
s n O8 Station Manager TTd l 1 l !
i l
{
l I
l
3
, OPERATIN3 DATA REPERT DOCKET NO.t 50-338 DATE: October 5, 1996 CONTACTS W. R. Matthews PHONE: (540) 894-2101 OPERATING STATUS
- 1. Unit Names. . ........ ........ ...... North Anna 1
- 2. Reporting Periods......... ....... ... . .. Septencer 1996
- 3. Licensed Thermal Power (MWtl ... ... . 2,893
- 4. Nameplate Rating (Gross MWell. . ... . . . 994
- 5. Design Electrical Rating (Not NWel s . . . . . . . . . 907
- 6. Maximum Dependable Capacity (Gross MWe)s... 940
- 1. Maximusa Dependable Cap 4 city (Net MWe) . . . . . . 893
- 8. If changes occur to Capacity Ratings (Items 3 thru 1) since last report, give reasons: N/A
- 9. Power level to which restricted, if any (Net FMe) N/A
- 10. Reasons for restrictions, if any: N/A This Month Y-t-D Cumulative
- 11. Hours in Reporting Period. .. , ,.. 720.0 6,575.0 160,211.0
- 12. Nanber of Hours Reactor was critical. . . .. . 720.0 5,842.4 123,028.8
- 13. Reactor Reserve Shutdown Hours. . . . . . 0.0 74.4 7,025.8
- 14. Hours Generator On-Line.. . . . . . .. .. 720.0 5,806.0 119,993.5
- 15. Unit Reserve Shutdown Hours. . . . .. 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)... . . . . . 2,082,722.5 15,986,606.5 321,300,343.6
- 17. Gross Electrical Energy Generated (>H{}. . . 682,560.0 5,247,828.0 142,578,441.0
- 18. Het Electrical Energy Generated (MW) ... . . ... . 648,724.0 4,981,800.0 100,022,954.0
- 19. Unit Service Factor.... .. . . . . . 100.04 88.3% 74.96
- 20. Unit Availability factor..... . . .. .. . . 100.04 88.3% 74.96
- 21. Unit Capecity Factor (using MDC Net) . . .... . .. . . . 100,96 83.5% 69.86
- 22. Unit Capacity Factor (using DER Net) . .. .... .. . . .. . 99.3% 83.54 68.86
- 23. Forced Outage Rate.. .... .. . . .. 0.0% 0.7% 8.94 i
i 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Each)1 N/A
- 25. If shutdown at end of Report Period, estimated tin.e of startup N/A
- 26. Units in Test Status (Prior to Commercial Operation) r Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COFNERCIAL OPERATION i
(
i
\
i l
l AVERAGE DAILY UNIT POWER LEVEL 1
Docket No.: 50-338 !
Unit: NA-1 Date: October 5, 1996 i
Contact:
W. R. Matthews !
j Phone: (540) 894-2101 l l
i l
I-l MONTH: September 1996
[ DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 900 17 899 2 898 18 900 3 699 19 901 4 899 20 900 5 899 21 899 6 900 22 901 7 902 23 901 8 901 24 902 l l 9 902 25 904 l 10 903 26 903 l 11 902 27 904 l 12 901 28 905 13 900 29 904 l
14 900 30 904 ;
15 899 I 16 899 l
- Instructions
l On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I I
l 4
f l
_ . _ _ _ . _ . _ . _ _ _ _ _ _ . _ _ _ . . ....m._. _ _ _ . _ . _ _ _ = . _ . . _ _ . . _ _ . . _ . _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _ . . _ .
NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: Eptember ,
1 SUt44ARY OF OPERATING EXPERIENCE )
i Page 1 of 1 I Listed below in chronological sequence is a summary of operating ,
experiences for this month which required load reductions or resulted in l significant non-load related incidents.
Date Time Data September 01, 1996 0000 Began month with unit at 100% power, 947 MWe.
l l ' September 30, 1996 2400 Ended month with unit stable at 100% power, l 951 MWe.
l l
l 1
t 1
I i
i i
e 2
. - . . - ,_ . . . .. . . -- . . . . - - . . - . . - . - . . . - . ~ . . _ . - . - . _ . . - - . . . . . - .
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-338 Report Month September Unit Name: NA-1 l-Year: 1996 Date: October 5, 1996 i
Contact:
W. R. Matthews '
l I
No entries this month. j i
l l
i i
i s
4 T g. W -v
UNIT SHUTDOWS AND POWER REDUCTIONS
. . l DOCKET NO.: 50-338 UNIT NAME: NA-1 ,
DATE: October 5, 1996 -
REPORT MONTH: . September 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 ..
f F
- 1 2 3 4 5 I No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective I
, (hrs) Shutting Event Code Code Action to
- Down Reactor Report 8 Prevent Recurrence j i
'
i t
i i
i 1: Type 2: Reason 3: Method 4: l l F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions i S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3=Autc% tic Scrald Entry Sheets for Licensee D= Regulatory Restriction d'wontinuations Event Report (LER) File j E= Operator Training & License Examination 5= Load Reduction (NUREG-0161) {
F= Administrative 9-Other .
- G= Operational Error 5
H=Other (explain) Exhibit H - Same Source ;
t s
P f
f
, t f
t
\
, 1 l l e CPERATIN3 DATA REPORT I
i DOCKET NO. 50-339 DATE: October 5, 1996 CONTACTS W. R. Matthews PHONE: (540) 894-21;1 OPERATING STATUS
- 1. Unit Namet............. . .. . . . . North Anna 2 l 2. Reporting Periodt...... ..... . . . September 1996
- 3. Licensed Thermal Power (>Mt) .. ., 2,893
- 4. Naneplate Rating (Gross MWels. .. ....... . 979 l S. Design Electrical Rating (Not MWe) . . ... 907
- 6. Masimum Dependable capacity (Gross MWe) s . . . . 944
- 7. Maximum Dependable Capacity (Not MWe)B. 897
- 8. If chonges occur to Capacity Ratings (Items 3 t'su 7) since last report, give rea.ons: N/A
- 9. Power level to which restricted, if any (Net Mhe): N/A
- 10. Reasons for restrictions, if any: N/A )
i i
l This Month Y-t-D Cumulative 1
- 11. Hours in Reporting Period. .. . . . . . 720.0 6,575.0 138,479.0
- 12. Nunter of Hours Reactor was Critical . . . . . . . . .. 169.8 6,024,8 116,082.4 l
- 13. Reactor Reserve Shutdown Hours. ... , , . .. . 17.5 17.5 6,552.5
- 14. Hours Generator On-Line.. .. ... .. . . . .. . . . . 168.8 6,023.8 114.946.9
- 15. Unit Reserve Shutdown Hours.. . . . . . .. . . 0.0 0.0 0.0
- 16. Gross Thermal Energy Generate'l (MWH)... ... .. . .. . 416,730.8 17,280,003.2 313,257,241.9 j 1
- 17. Gross Electrical Energy Generated (MWH).. ... . . 136,920.0 5,676,123.0 102,507,541.0 ;
i 18. Net Electrical Energy Generated (MWH). . . 129,207.0 5,398,839.0 97,970,478.0 l
- 19. Unit Service Factor...... . .. . .. .. ... . 23.4% 91.6% 83.04
- 20. Unit Availability Factor.. .. . .. . . . . . . . 23.46 91.6% 83.04
- 21. Unit Capacity Factor (using MDC Net) . . . . . 20.06 91.54 78.7%
- 22. Unit capacity Factor (using DER Net) . . . . 19.8% 90.5% 78.0%
- 23. Forced Outage Rate..... ......... ... ... . .. . . .... 0.0% 0.0% 4.6% j l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Each): l I l i
l I
- 25. If Shutdown at end of Report Period, estimated time of Startups startup from Scheduled Refeuling Outage currently Projec October 7, 1996.
i l 26. Units in Test states iPrior to Comnercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY _
COP 94ERCIAL OPERATION l
L i
i I
l l
\
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit: NA-2 Date: October 5, 1996
Contact:
W. R. Matthews Phone: (540) 894-2101 MONTH: September 1996 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER ITVEL (MWe-Net) LEVEL (MWe-Net) 1 792 17 0 2 788 18 0 3 771 19 0 4 771 20 0 5 768 21 0 6 766 22 0 7 727 23 0 8 1 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 16 0 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
\
~
NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: September l SUbHARY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in . chronological sequence is a summary of operating experiences for this ~ month which required load reductions or resulted in significant non-load related incidents.
Date Time Data September 01, 1996 0000 Began month in end of cycle coastdown at 88%
power, 838 MWe.
I
~ September 07, 1996 2107 Commenced unit rampdown in preparation for 1996 Refueling Outage from 94.8% power, l 810 MWe.
September 08, 1996 0049 Unit removed from service for scheduled Refueling Outage.
0125 Entered Mode 2.
0147 Manually tripped reactor and entered Mode 3.
1330 Entered Mode 4.
1919 Entered Mode 5.
September 12, 1996 0100 Entered Mode 6.
September 14, 1996 1026 Commenced core offload.
1 September 16, 1996 0328 Unit defueled. l September 22, 1996 0502 Commenced core onload.
September 24, 1996 0321 Core onload completed.
September 28, 1996 1330 Entered Mode 5.
l September 30, 1996 2400 Ended month in Mode 5 for schedule Refueling outage. Several small unit ramp-downs (<5%
- power each) occurred during the month to match Tave and Tref during end-of-cycle coastdown and are not individually recorded in this report.
a Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-339 Report Month September Unit Name: NA-2 Year: 1996 Date: October 5, 1996
Contact:
W. R. Matthews l 96-01 September 8, 1996 l Unit manually taken off-line at 0049 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> and shutdown l for normally scheduled refueling outage.
l l
i l
I l
i l
l l
A 1
L
. UNIT SHUTDOWS AND POWER-REDUCTIONS i DOCKET NO.: 50-339 UNIT NAME: NA -
DATE: October 5, 1996 REPORT MONTH: September 1996 CONTACT: W. R. Matthews PHONE:-(540) 894-2101 ,
E 1 2 3 4 5 l
No. Date Type Duration Reason Method of Licensee - System Component Cause & Corrective (hrs) Shutting Event Code Code -Action to ;
Down Reactor Report # Prevent Recurrence 96-0 960908 S 551.2 C 1 N/A N/A N/A N/A r
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File l E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9-Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source s s
i
. . . . .