VINGINIA EI.ECTRIC AND PowEn COMPANY I i RicnwoNo,VINGINIA 20261 August 10,1998 i
United States Nuclear Regulatory Commission Serial No.98-466 Attention: Document Control Desk NAPS /JHL i
Washington, D. C. 20555 Docket Nos.
50-338 I
50-339 License Nos. NPF-4 NPF-7 Gentlemen:
i VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT L
Enclosed is the July 1998 Monthly Operating Report for North Anna Power Station Units 1 and 2.
l Very truly yours, hgW W. R. Matthews Site Vice President i
Enclosure i
i Commitments made in this letter: None.
I I
l cc:
U. S. Nuclear Regulatory Commission M [j i l
Region 11 l
l Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85
/
Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station 9808140057 990731 PDR ADOCK 05000338 R
PDR e-_____________---__________________
J
r
)
I I
l i
l
)
)
i 1
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT July 1998 I
l l
b Approved:
Site Vice President Date l
l t
i l
I'
OPERATING DATA REPORT Docket No.:
50-338 Date: 08/05/98
Contact:
W. R. Matthews Te!ephone: (540) 894-2101 1.
- Unit Name:
North Anna Unit 1 2.
Reporting Period.,.
July,1998
- 3.
Licensed Thermal Power (MWt):..
2893 4.
Nameplate Rating (Gross MWe):
979.74 5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross MWe):.
940 7.
Maximum Dependable Capacity (Net MWe):
893 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, if Any (Net MWe):
10.
Reasons For Restrictions, if Any:-
This Month Year-To-Date Cu,nulative r
- 11. Hours in Reporting Period 744.0 5,087.0 176,267.0
- 12. Hours Reactor Was Critical 744.0
- 5,087.0 138,342.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 7,095.0
- 14. Hours Generator On-Line 686.0 5,029.0 135,196.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,944,683.0 14,433,866.4 364,968,338.9 i
17, _ Gross Electrical Energy Generated (MWH) 627,788.0 4,707,195.0 -
156,877,848.0
- 18. Net Electrical Energy Generated (MWH) 596,103.0 4,476,507.0 113,620,690.0
- 19. Unit Service Factor 92.2 %
98 9%
76.7 %
- 20. Unit Availability Factor 92.2 %
98.9 %
76.7 %
- 21. Unit Capacity Factor (Using MDC Net) 89.7 %
98.5 %
72.1 %
- 22. Unit Capacity Factor (Using DER Net) 88.3 %
97.0 %
71.1 %
- 23. Unit Forced Outage Rate 7.8%
1.1%
8.0%
l 24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling, September 13,1998, 35 Days l
l 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
i 26.
Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
l AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 08/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 MONTH:
July,1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net)
Day (Mwe - Net) l 1
895 17 897 2
895 18 897 3
895 19 897 4
894 20 897 5
894 21 896 6
895 22 895 7
894 23 895 8
895 24 894 9
894 25 894 10 864 26 894 11 21 27.
895 12 0
28 894 13 128 29 893 14 558 30 892 15 896 31 892 16 888 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
L l
l
i i
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 08/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.:J MONTH: July 1998
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Qate Time i Dgtg July 01,1998 0000 Began month in Mode 1 at 100% power, 942 MWe.
July 10,1998 2028 Commenced unit rampdown from 100% power, 941 Mwe due to a generator hydrogen leak.
July 11,1998 0223 Main generator taken offline.
July 13,1998 1226 The hydrogen leak on the main generator was repaired.
Unit 1 was placed on-line.
1345 Holding power at 30% to perform Calorimetric.
I 1732 Calorimetric completed satisfactorily.
July 14,1908 1225 Commenced ramp to 90% power.
1258 Ramp stopped at 58% power due to upper and lower detector deviation alarms not clearing as expected. Will perform Quadrant Power Tilt Ratio (QPTR).
1315 QPTR completed satisfactorily. Commence ramp to 90% power.
1422 Stopped ramp at 69% power,627 MWe due to receiving computer tilt / rod deviation alarm. Will perform QPTR.
1437 QPTR completed satisfactorily. Commence ramp to l
90% power.
1700 Unit at 90% power,847 Mwe. Performing calorimetric.
1713 Calorimetric completed satisfactory. Commencing ramp to 100% power.
2125 Unit at 100% power, 942 Mwe.
July 31,1998 2400 Ended the month in Mode 1 100%, 942Mwe.
Docket No.: 50-338 Unit Name: North Anna Unit i Date: 08/05/98
Contact:
W. R. Matthews Telephone: (540)894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To om GREATER THAN 20%)
REPORT MONTH: July,1998 (1)
(2)
(3)
(4)
(5)
Method Duration of LER No.
. System Component Cause & Corrective Action Date Type Hours.
Reason Shutting Code Code to Prevent Recurrence Down Reactor 7-11-98 F
58 B
NA NA NA NA Removed turbine generator from the line to -
repair a hydrogen leak.
The reactor remained critical.
(1)
(2)
(3)
F: Forced REASON:
h*ETHOD:
S: Scheduled A-Equipment Failure (Explain) 1 Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain) l E-Operator Training & Licensing Examination l
F-Administrative l.
G-Operational Error (Explain)
(4)
(5)
Exhibit G -instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
I OPERATING DATA REPORT Docket No.:
50-339 Date: 08/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 1.
Unit Name:
North Anna Unit 2 2.
Reporting Period:.
July,1998 3.
Licensed Thermal Power (MWt):.
2893 4.
Nameplate Rating (Gross MWe):.
979 5.
Design Electrical Rating (Net MWe):
907-6.
Maximum Dependable Capacity (Gross MWe):..
944 7.
Maximum Dependable Capacity (Net MWe):.
897 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
1 9.
Power Level To Which Restricted, if Any (Net MWe):
10.
Reasons For Restrictions, if Any:
This Month Year-To-Date Cumulative 11.
Hours in Reporting Period 744.0 5,087.0 14,535.0 12.
Hours Reactor Was Cntical 744.0 4,416.8 130,132.0 13.
Reactor Reserve Shutdown Hours.
0.0 40.9 7225.1 14.
Hours Generator On-Line 744.0 4,398.6 128,920.8 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 2,151,714.7 12,381,412.9 353,174,592.9-17.
Gross Electrical Energy Generated (MWH) 696,211.0 4,027,528.0 115,530,042.0 18.
Net Electrical Energy Generated (MWH) 661,157.0 3,826,661.0 110,354,629.0 19.
Unit Service Factor 100.0 %
86.5 %
83.4%
20.
Unit Availabihty Factor 100.0 %
86.5 %
83.4%
21.
Unit Capacity Factor (Using MDC Net) 99.1 %
83.9 %
79.4 %
22.
Unit Capacity Factor (Using DER Net) 98.0%
82.9%
78.7 %
23.
Unit Forced Outage Rate 0.0%
0.0%
4.9%
i 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None j
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
i l
- 26. - Unit in Test Status (Prior to Commercial Operation):
FORECAST
__ __ ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name: North Anna Unit 2 I
Date: 08/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 MONTH:
July,1998 j
Average Daily Power Level Average Daily Power Level Day (MWe - Net)
Day (Mwe - Net) 1 892 17 888 2
892 18 889 3
895 19 888 4
891 20 888 5
891 21 888 6
891 22 888 f
7 891 23 888 8
891 24 888 9
891 25 888 10 890 26 889 11 886 27 889 12 885 28 888 13 886 29 888 14 897 30 887 15 888 31 886 16 896 INSTRUCTIONS I
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
l Docket No.: 50-339 Unit Name: North Anna Unit 2 Date:
08/05/98 l
Contact:
W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION
)
UNIT NO.:_2 l
MONTH: July 1998 i
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
Date Time Data July 1,1998 0000 Began the month in Mode 1,100% power,942 Mwe.
July 31,1998 2259 Commenced unit rampdown to approximately 870 Mwe to perform turbine valve freedom test (TVFT).
2338 Holding power at 92%, 872 Mwe for TVFT.
2400 Ended the month in Mode 1, 92% power, 872 Mwe.
)
j
! O Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 08/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To on GREATER THAN 20%)
REPORT MONTH: July,1998 (1)
(2)
(3),
(4)
(5)
Method Duration of LER No.
System Component Cause & Corrective Action Date.
Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx None during the repoi'ing period.
i l
i (1)
(2)
(3)
F-For:ed REASON:
METHOD-I S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram l
C-Refueling 3-Automatic Scram l.
D-Regulatory Restriction 4
Other (Explain)
E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
(4).
(5)
Exhibit G -Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)