Revised Monthly Operating Rept for Jan 1979
ML19210D137
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200575
Download: ML19210D137 (4)


Text

.%.VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Jan.

YEAR 1979 (Revised 11-05-79)

SUBMITTED:

\%J'A cxA SUPERIflTENDENT - OPERATIONS APPROVED:.MANAGER ()

1367 7,06 7 911200 f7I

.OPERATING DATA REPORT DOCKET NO. 50-338 DATE 11-5-79 D**D*D'3~](1,'Co3!PLETED 11Y W. R. Madison ,J,}TELEPflONE 703_ 894-5151

, gj , OPERATING STATUS

.-Morth Anna Notes .1. Unit Name:

nuaq Im WenseQ 2. Reporting Period:

3. Licenwd Thermal Power (51Wt):

2775 4. Nameplate Rating (Grod51We):

947 ,907 5. Design Electrical Rating (Net 51We):

6. 51aximum Dependable Capacity (Gross 51We):

090 7. Sf aximum Dependable Capacity (Net SIWE):

8. If Changes Occur in Capacity Ratings (Items Number 3 Though 7) Since Last Report, Give Reasons:

N/A 9. Power Level To Which Restricted,if Any (Net 51We):

N/A 10. Reasons For Restrictions,if Any:

N/A._.._-This 51onth ._ _ Yr..to.Date Cumulative

11. ilours In Reporting Period 744 744 5,761 12. Number of Flours Reac:or Was Critical 640.7 640.7 ~5,327.5 0 0 96.8 13. Reactor Reserve Shutdown IIours 640./640.7 5,292.4 14. Ilours Generator On-Line
15. Unit Reserve Shutdown flours 0 0 0 16. Grms Thermal Energy Gener::ed (31Wil) 1,710,165 1,710,165 13,906 960 2 17. Cross Elec:rical Ener;y Generated (SiWFI) 544,465 , 544,465 4,444,902 Sl 3,4TO 513,410 4.177,990 18. Net Electrical Energy Generated (51WH) 80.I 86.I 92.5 19. Unit Service Factor
20. Unit Availability Factor 86.1 86.1 92.5 21. Unit Capacity Factor (Using 51DC Net)

_76.8 80Tti 76.8 22. Unit Capacity Factor (Using DER Net) 76.I 76.1 80.0 13.9 13.9 3.2 23. Unit Forced Outage Rate

  • 24. Shutdowns Scheduled Over Next 6 Slonths(Type.Date.and Duration of Each):

Snubber Inspection April 1979, I week

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

February 3,1979

26. Units In Test Status (Prior to Commercial Operation):

Foreca>t Achieved.INITIA L CRITICA LITY INITIAL ELECTRICITY C05151ERCI AL OPERATION 1367?)D7 ml 50-333 UNIT SHUTDOWNS AND POWER REDUCTIONS y o_ borth Anna ~

t DATE Il-S-79 REPORT MONT11 January 1979 (Revised)

COMPLETED BY __lL_R._Ea discn TELEPl!CNE (703) 894-5151

.**=-No.Date-._5 y}h[f Licernee 5-r,~Cause & Corrective

-, ,=c:-Event u7 c2 Action to S j@-N 3 -j ]Report : A0 ,! C Present Re.mtrence

,-c-5 i i I 79-01 790127 F 103.3 A*1 LER/R0 79-012 CF VALVEX Manual reactor, turbine generator shutdown due to excessive unidenti-fied primary plant leakage.

Repacked MOV-1700 residual heat removal systun isolation valve, also outage was extended for other primary and secondary maintenance.

g$GED E@t b 2@EB C::ta', ul: 3 4& F: Forced Reason: Method: Exhibit G - Instructions N S: Scheduled A-Eqmpment Fai!ure (Explain) 1 -Manual for Preparation of Data B Maintenance of Test 2-Manual Seram.

Entry Sheets for Liecmee C Refueling 3-Automatic Seram.

Event Repo.t (LER) Fi!c lNUREG-s o D Regulatory Restriction 4-Other ( Explain )

0161)g E-Operator Training & License Examination F-Administotive 5 G-Operational Error (Explain)

Exhibit I - Same Source

  • Se/77) Attached Sheet !!-Other ( E xplain)

N e NOTE: Outage 79 01 Page 1 of 1 UflIT SHUTDOWil AtlD P0'.!ER REDi]CTIOllS EXPLAllATI0tl SHEET DOCKET i;0.

50-333_REPORT !!OllTil Janirary

__UllIT FLAME florth Anna

_YEAR 1979 DATE 11-5-79 COMPLETED BY W. R. f4ADIS0tl 79-01 (A)Excessive packing gland leakage from fl0V-1700, the residual heat removal system suction valve, of greater than 1 gallon per minute.

Technical specifications permit primary plant unidentified leakage of 1 gpm or less. The unit was rer.oved from service and the reactor shutdown at 1641. The plant was then cooled down and depressurized.

The maintenance was completed on 1-28-79 at 1940. The plant was heated to 547 F on 1-29-79 at 1245 and a leakrate calculation was performed.

Agairi leakage was excessive.

It was determined that the pressurizer spray valves were leaking between their bodies and bonnets. The plant was then cooled down and depressurized to allow maintenance. January shutdovin 78-33 continued into February 1979.

1d7309: