ML18017B285

From kanterella
Revision as of 05:03, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Interim Deficiency Rept Re Procurement,Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Submittal of Final Rept Delayed Until 810119,pending Completion of Investigation
ML18017B285
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/14/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8011240365
Download: ML18017B285 (4)


Text

I REGULATOR INFORMATION DISTRIBUTION"TEM (RIDS)ACCESSION>>VBR o 80112tl0365 OOC~DATE: 80/11/10 iVOTARIZEO:

NO FACIL:50-400 Shearon Harris Nuc,lear Power Planti Unit li Carolina 50-401 Shearon Harris Nuclear Power Plantg Unit 2i Carol,ina 50-402=Shearon Harris Nuclear Power Planti Unit 3i Carolina 50-403 Shearon Harris Nuclear Power Plant~Unit 4i Carolina AUTH, NAME.AUTHOR AFFIL'IAT ION CHIANGIiN.J., C'arol ina Power 8 Light Co., REC IP NAME RECIPIEiVT AFFIL'IAT ION O'R'EILLY~

J.P., Region ii Phi l adel phi ag Of f i ce oif the Di rector OO 050 00 1 05000002, 05000003

SUBJECT:

Interim deficiency rept re procurementifabr.ication 8 insp of engineered plates for concrete embedment>>

L support of safety-related lopds.Submittal of final rept delayed until 810119ipending coppletion o.f investigation',.

DISTRIBUTION CODE.: 8019S COP I ES RECE'I VED;Lf R 3<ENCLil 4 SIZE: TITLE: Construction Deficiency.

Repor t (10CFRSO,SSE0 NOTES: ', ACTION: I ,1 INTERNALI:

RECIPIENT-ID CODE'/NAME, A/D LilCENSNG'4 RUSHBROOK M~, 06 AO/RC I'/I El 1,7 ASLBP/J~HARO EDO'STAFF<19 HYD/GEO BR 22 L>>IC: QVALl BR 12 NRC-POR 02 PRO'EV 13 G F'1 ANDRDS DEV 21 COPIES Lfl'TR ENCL', 1 1, l.1 1 1 11 1, RECIP'IENT'D GODE/NAMEil YOUNGBLOODgB OS NILSONi JERRY 07 AEOO 18 D/DIR HUM FACil5 EQUIP QUAL)BR11 I8 EI 09 MPA 20 OELD 2'1 QA BR 10 RUTHERFORDiÃ

~IE.'OPIES LTTR ENCL: 1 1, 1 1 1 1 1 1 EXTERNAL: ACRS NSIC, 16 08 16 1 1, LPDR-03 Oy 25'tsGA 9 TOTAL NUMBER OF>>COP'IES REQUIRED: L7TR 39 ENCL.'/

If il j I 4, f I.I' FORM 21 50M File: SH N-2/18 Item 12 November 14, 1980 CPSL Carolina Power&Light Company Raleigh, H.C.27602 US NRC OlSTRlBOTJON SERV1CES BRANCH>~tlOV 2)g]9~~k(Mr.James P.O'R illy United States Nuclear Regulatory Commission Region II 101 Maxietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3 AND 4 DOCKET NOS~50-400, 50-4l)1, 50-402 AND 50"403 DEFICIENCIES IN THE PROCURENEVZ, FABRICATION AND INSPECTION OF ENGINEERED PLATES FOR CONCRETE EKEDi~AND SUPPORT OF SAFETY RELATED LOADS-INTERIM REPORT OPEN ITEM 400 AND 401/79-14<<01, 402 AND 403/79<<13-01 Dear Mr.O'Reilly'er our August 29,.1980, interim report on the subject deficiency, we'informed you that 22 plates still required some form of corrective action and it was estimated that the corxective action completion date and submittal of final report was November 15, 1980.The intent, of this letter is to inform you that submittal of the final report will'be delayed due to all investigation not being completed on oni plate.Corrective action on 21 out of the 22 plates has been completed and that it is anticipated that the corrective action on the remaining plate wiU.be completed by January 19, 1981, at which time the final 10CFR50.'55(e) xeport will be submitted.

Thank you for your consideration in this matter.NJC/mt cc!Mr.V.Stello (2)+Mx.G.Maxwell Yours very truly,'riginal Signed By N.3.Chiangi N.J.Chiangi-Manager Engineering 6 Construction

+ality Assurance yo I II'Vvtv,>>t jul 5 (~'j-", pg r UH 55~tvgP/g tj)Q))lW>>HUWW>>U c HI I I I W g 5 r V'">>.Ct U 5>>I~5 r l vr 51 5 5 UH vr (H'Hj Vt 110 K,l UV't.t'f jj"I" 5".'3 I.j,W>>v'jig>>'U)lj Hvtl t'If)IH tjW QI pl'5')WV I U'fwj[(1.4i,w (,"A,,ICIC)'g-Ug'H (w>Q I v~,~>>tent~5 5~IIUH'I't g H I"" jH((t 5$f f U I'" Uljv W Wg',*l UHUHI (Q I't W 5r~g>>WP>>>>~""','1","~,H,H.'P.",H~~jjJJ,'5 f'H J)I(t pCjr'vv 5+rv r(vtt t~tt~;II 5 t~I$HJ'4V I~)It rr~tt~Uv