Interim Deficiency Rept Re Omission of Protective Coating & Existence of Damaged Coating on Unit 1 Containment Liner, Initially Reported 801114.Corrective Actions Scheduled for Completion by 810315
ML18017B341
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 02/27/1981
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, 400-80-23-10, NUDOCS 8103110716
Download: ML18017B341 (6)


Text

REGULA Y INFORMATION OISTRIBUTIO YSTEM (BIOS)ACCESSION NBR:8103110716 OOC~DATE: 81/02/27 NOTARIZED'O FACIL:50-400 Shearon Harris Nuclear power Plants Unit ii Carol fna 50-401 Shearon Harris Nuclear power PlantP Unit 2i Carolina 50-402 Shearon Harris Nuclear Pawer PlantP Unit 3P Carolina 50-403 Shear on Harris Nuclear Pawer PlantP Unit 4~Carolina AUTH INANE AUTHOR AFF ILI ATION CHIANGIPN.J.

Carolina Power 8 Light Co~RECIPN NAME RECIPIENT AFFILIATION O~REILLYP JRP~Region 2i Atlanta<Office of the Director

SUBJECT:

Interim deficiency rept re ommission of protective coating II existence of damaged caating on Unit.f cantainment'iners inftfally reported 801114.Corrective actions scheduled for completion by 810315~DISTRISUTION CODE: SOISS COPIES RECEIVED:LTR J.ENCL SIZE'.TITLE: Construction Deficiency Report (fOCFR50.55E)

NOTES!DO 0500 01 05000402 05000403 RECIPIENT ID CODE/NAME ACTION!A/D L ICENSNG 04 RUSHBROOKPM

~06 INTERNAL!AD/RC I/IE 17 D/DIR HUM FAC15 EQUIP QUAL 8R11 ISE 09 MPA 20 OELO 21 QA BR f4 RUTHERFORDPW

~IE COPIES LTTR EN L 1 1 RECIPIENT ID CODE/NAME YOUNGBLOOOPB 05 AULUCKPR~07 ASLBP/J~HARO EDO L STAFF 19 HYD/GEO BR 22 LIC QUAL BR 12 NRC POR 42 PROC/ST REV 13 01 STANDRDS DEV 21 COPIES LTTR ENCL 1 1 1 EXTERNAL: ACRS NSIC ib 08 16 1 LPDR 03-tR 14~FZ~" TOTAL NUMBER OF COPIES REQUIRED: LTTR 38 ENCL

'I'I N I

~Fur(M 21 t CPRL Carolina Pov]er&Light Company Raleigh, N.C.27602 Pi1e!SH N-2/18 Item 49 Pebruary 27, 1981 i~fr.James P.O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POHL~i<PLAIG UNITS 1, 2, 3 mVO 4 DOCKET NOS.50-400, 50-401, 50-402, AND 50-403 OIIISSION OP PROTECTIVE COATING AL&L'XISTENCE OP DANGED COATING ON THE UNIT 1 CONTAINIQWZ LINER-INTERIi1 REPORT OPEN ITI7i4 400/80-23-10

Dear Hr.O'Reilly:

Per our November 14, 1980, interim report on the subject deficiency, we had indicated that all corrective action would be completed by March 1, 1981, at whicn time the final 10CPR50.55(e) report would be submitted.

The intent of this letter is to inform you that all corrective action has not yet been completed due to the encountering of the concrete bulge;the details of which are given below.It is now anticipated that all corrective action will be completed by IIarch 15, 1981, at which time the final 10CPR50.55(e) report will be submitted.

I To date the surface preparation for subsequent coating application has been completed and the primer coat applied.During the application of the primer coat, it was discovered that, midway down the slab, a concrete bulge existed that resulted from form leakage during the placement of the slab.This bulge had to be removed since it violated the gap tolerance that is to exist between the slab and the containment liner.The chipping out of the bulge is now complete and it is anticipated that the work (top coat applica-tion and damaged primer coat repairs)will be finished by Harch 15, 1981.

~J~-I Mr.James P.O'Reilly Pebruary 27, 1981 Thank you for your consideration in this matter.HJC/mt Yours very truly, Original Signed By N.i.Chiangi N.J.Chiangi-Manager Engineering