ML20102B983
ML20102B983 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 01/25/1985 |
From: | Morgan R CAROLINA POWER & LIGHT CO. |
To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
Shared Package | |
ML20102B980 | List: |
References | |
RNPD-85-194, NUDOCS 8503050059 | |
Download: ML20102B983 (2) | |
Similar Documents at Robinson | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML14314A7831999-10-0808 October 1999
[Table view]Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 2 & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next 5 Months ML14181A4641999-10-0404 October 1999 Discusses Compeletion of Licensing Action for GL 98-01.Staff Reviewed Util Response & Has Concluded That All Requested Info Has Been Provided ML14181A4561999-09-10010 September 1999 Informs That as Result of Ongoing Review of Licensee Submittal Dtd 990527,for Permanent Rev to UHS Temp for Plant,Unit 2,staff Propose to Conduct Site Audit Along with Contractor Staff During Wk of 990920-24 ML14314A7771999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Slide Presentations & List of Questions Received from Participants Encl ML14181A4541999-08-31031 August 1999 Discusses 990825 Telcon & Ltr Which Expressed Intent to Revise Relief Request 25 Re Alternatives to Sys Hydrostatic Testing IAW ASME B&Pv,Section XI to 10CFR50.55(a)(3).Review Will Begin Upon Submittal of Rev ML20211G9851999-08-26026 August 1999 Ltr Contract:Task Order 244 Entitled, Technical Assistance in Evaluating Proposed Increase in Allowed Ultimate Heat Sink Temperature of Hb Robinson,Unit 2, Under NRC-03-95-026 ML14183A9391999-08-19019 August 1999 Forwards SE Authorizing Licensee Which Submitted Third 10-year Interval ISI Program Plan for Relief Request 23 for HBRSEP2 from Performing Exams on Bolted Connections Prescribed in ASME Section Xi,Article IWA 5242(a) ML14314A7731999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Hb Robinson.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML14183A9351999-08-0303 August 1999 Discusses 990731 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3.7.8.Staff Plans to Complete Review & Issue License Amend within 4 Wks of Date of Ltr ML14182A3091999-07-30030 July 1999 Forwards Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML14183A9271999-07-26026 July 1999 Forwards SE Re Relief Requests from ASME Section XI Requirements for Containment Insp ML14183A9221999-07-15015 July 1999 Forwards SE Accepting Licensee 990119 Submittal of Third 10-year Interval ISI Program Plan Request for Relief for Plant,Unit 2,per 10CFR50.55a(a)(3)(i) ML14181A4481999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Revision 2.This Closes Staff Efforts to TAC MA0566 ML14182A3061999-06-16016 June 1999 Forwards Insp Rept 50-261/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML14178B2161999-05-19019 May 1999 Responds to 990510 Request Re Requirements of 10CFR50.68. Staff Directs Licensee to Statement of Consideration at Time of Review Prior to Issuance of Proposed & Direct Final Rule Which Included Adopting CP&L Comments ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML14178B2131999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created.Reorganization Chart Encl ML14314A7651999-05-11011 May 1999 Summarizes 990504 Meeting Re PPR Results for Feb 1997 to Feb 1999.List of Attendees Encl ML14182A3031999-05-11011 May 1999 Forwards Insp Rept 50-261/99-02 on 990228-0410.One Violation Occurred & Being Treated as non-cited Violation ML14314A7631999-05-0707 May 1999 Informs That During 990505 Telcon Between T Natale & M Ernstes,Arrangements Were Made for Administration of Licensing Examinations at Hb Robinson Steam Electric Plant During Week of 990726 ML14182A3001999-05-0606 May 1999 Forwards Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified in Access Authorization Program & NRC Continuing Review of Issues.Notice of Violation Not Presently Issued ML14314A7561999-04-14014 April 1999 Confirms Telephone Conversation Between R Warden & G Macdonald on 990412 Re PPR Scheduled for 990504.Purpose of Meeting Will Be to Discuss Recently Completed PPR at Hb Robinson Unit 2 ML14314A7611999-04-0909 April 1999 Informs That on 990317,A Williams & Ho Christensen Confirmed That No Initial Licensing Exam Scheduled for Year 2000. Initial Exams Requested for March 2001 for Approx 12 Candidates ML14183A9001999-04-0808 April 1999 Discusses CP&L 980831 Request for Relief from Code Scheduling Requirements of RPV Exam Categories B-A,B-D,B-F & B-N-1,Rev 1 for Hb Robinson Steam Electric Plant Unit 2. Forwards SE Supporting Proposed Alternative RA-99-0071, Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld1999-04-0101 April 1999 Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML14182A2971999-03-29029 March 1999 Forwards Insp Rept 50-261/99-01 on 990117-0227.No Violations Were Identified ML14314A7541999-03-23023 March 1999 Advises of Planned Insp Effort Resulting from Plant PPR Review Completed on 990204.Historical Listing of Plant Issues & Details of Insp Plan for Next Eight Months Encl ML14314A7521999-03-11011 March 1999 Informs That During 990309 Telcon Between T Natale & M Ernstes,Arrangements Were Made for Administration of Licensing Exam at Plant During Wk of 990726.Copies of Proposed Exam Outlines Should Be Provided by 990513 ML20210J5761999-03-0404 March 1999 Requests Route re-approval for Rail Transportation Routes, Previously Approved by NRC by Ltr .Two Routes Requested to Be Reapproved,Rail Route 130 & 135.Util Requests That NRC Renew Route Approvals by 990416 ML14183A8911999-03-0101 March 1999 Refers to CP&L 970128 & 990219 Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions. Determined Submittals Acceptable for Resolving Issue of Thermally Induced Pressurization Piping ML14181B0381999-02-12012 February 1999 Forwards Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted.During Insp Period,Inspectors Found That CP&L Staff Generally Took safety-conscious Approach to Activities Conducted at Robinson NPP ML14178B2001999-02-0808 February 1999 Refers to Telcon on 990127 When Mutually Agreeable Date of 990205 Was Established for CP&L to Provide USNRC with Addl Info Re IPEEE Site Audit.Informs That Required Info Had Not Been Received as of 990208 ML14183A8891999-02-0505 February 1999 Ack Receipt of Revising Earlier Commitment to Submit Proposed Change to Ultimate Heat Sink Temp Ts,From mid-December 1998 to 990527 ML14314A7451999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML14178B1951999-02-0101 February 1999 Informs That by 980811 & s,Nrc Has Responded to WOG Positions Re C/As to Address Generic Aspects of part- Length CRD Mechanism Housing Issue That Resulted from Leak at PINGP Unit 2 on 980123.Finds Actions Taken Acceptable RA-99-0011, Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld1999-01-15015 January 1999 Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld ML14178B1891999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of agency-wide Streamlining Effort. Forwards Copy of Organization Charts for Info ML14183A8841999-01-14014 January 1999 Informs of Status of Review of Licensing Actions That Are Required to Support Plant Refueling Outage Number 19 ML14183A8851999-01-13013 January 1999 Informs That NRC Did Not Receive Requested Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Hb Robinson Steam Electric Plant,Unit 2 ML14181B0311999-01-0808 January 1999 Forwards Safeguards Insp Rept 50-261/98-13 on 981207-11.No Violations Noted.Details of Rept Withheld Per 10CFR73.21 ML14183A8831998-12-29029 December 1998 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Motor-Operated Valves ML14181B0341998-12-23023 December 1998 Forwards Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted.Inspectors Found That Licensee Staff Generally Took safety-conscious Approach to Activities Conducted at Robinson Plant ML14314A7401998-12-23023 December 1998 Provides Summary of Training Managers Conference Conducted on 981105.Forwards Agenda,List of Attendees,Handouts & Preliminary Scheduled for FY99 & FY00.Goal of Providing Open Forum for Operator Licensing Issues Met ML14314A7371998-12-0101 December 1998 Provides Summary of 981119 Meeting with CP&L at Region II Ofc Re Configuration Mgt Initiatives & Design Control Organization Changes & Effectiveness of Corporate Support Organization.List of Meeting Attendees & Handouts Encl ML14314A7361998-11-25025 November 1998 Advises of Planned Insp Effort Resulting from Insp Planning Meeting on 981102.Insp Plan for Next 4 Months & Historical Listing of Plant Issues,Called Plant Issues Matrix, Encl ML14181B0281998-11-23023 November 1998 Forwards Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted.Conduct of Activities Was Characterized by safety- Conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML14178B1821998-11-20020 November 1998 Informs That Request for Extension of Time to Respond to GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations, Has Been Extended to 990131 ML14183A8791998-11-19019 November 1998 Forwards SE Accepting 981030 Proposed Change to QAP Description for Hb Robinson Steam Electric Plant,Unit 2. Reduction in Commitment Will Continue to Satisfy Criteria of 10CFR50,App B ML14183A8781998-11-17017 November 1998 Advises That Info Contained in Document Prepared by Siemens Power Corp,EMF-94-157(P),submitted in ,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML14183A8771998-11-13013 November 1998 Discusses Closeout of TAC M98709 Re Request for Exemption from 10CFR70.24(a), Criticality Accident Requirements 1999-09-10 Category:INCOMING CORRESPONDENCE MONTHYEARRA-99-0071, Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld1999-04-0101 April 1999
[Table view]Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML20210J5761999-03-0404 March 1999 Requests Route re-approval for Rail Transportation Routes, Previously Approved by NRC by Ltr .Two Routes Requested to Be Reapproved,Rail Route 130 & 135.Util Requests That NRC Renew Route Approvals by 990416 RA-99-0011, Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld1999-01-15015 January 1999 Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld RA-98-0153, Transmits Description of Rev 0 to Physical Security & Safeguards Contingency Plan, Which Contains Plant Industrial Security Plan & Safeguards Contingency Plan,Per 10CFR72.44(e)1998-08-27027 August 1998 Transmits Description of Rev 0 to Physical Security & Safeguards Contingency Plan, Which Contains Plant Industrial Security Plan & Safeguards Contingency Plan,Per 10CFR72.44(e) RA-98-0136, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan, for Hb Robinson Steam Electric Plant,Iaw 10CFR50.54(p)(2) & 50.4(b)(4).Summary of Changes Contained in Attachment 1.Plan Withheld,Per 10CFR73.211998-07-17017 July 1998 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan, for Hb Robinson Steam Electric Plant,Iaw 10CFR50.54(p)(2) & 50.4(b)(4).Summary of Changes Contained in Attachment 1.Plan Withheld,Per 10CFR73.21 RA-98-0115, Forwards Rev 36 to Industrial Security Plan for Unit 2.Rev Withheld,Per 10CFR73.211998-06-18018 June 1998 Forwards Rev 36 to Industrial Security Plan for Unit 2.Rev Withheld,Per 10CFR73.21 RA-98-0020, Forwards Rev 35 to Industrial Security Plan for Rsep,Unit 2. Rev Incorporates Changes Associated W/Physical Mods Involved W/Implementation of Enhanced Defensive Strategy & Incorporates Addl Level of Descriptive Detail.Encl Withheld1998-02-26026 February 1998 Forwards Rev 35 to Industrial Security Plan for Rsep,Unit 2. Rev Incorporates Changes Associated W/Physical Mods Involved W/Implementation of Enhanced Defensive Strategy & Incorporates Addl Level of Descriptive Detail.Encl Withheld ML20198K6631998-01-0909 January 1998 Responds to NRC 971212 NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Corrective Actions:Switch Was Examined & Returned to Normal on 970820.Check for $55,000 for Payment of Civil Penalty Encl.W/O Encl RA-97-0248, Forwards Rev 34 to Industrial Security Plan for Unit 2.Rev Made Effective on 971204.Rev Withheld,Per 10CFR73.211997-12-0404 December 1997 Forwards Rev 34 to Industrial Security Plan for Unit 2.Rev Made Effective on 971204.Rev Withheld,Per 10CFR73.21 RA-97-0188, Forwards Rev 6 to Security Personnel Training & Qualification Plan. Description of Each Change & Justification That Change Does Not Decrease Effectiveness of Training & Qualification Plan1997-09-18018 September 1997 Forwards Rev 6 to Security Personnel Training & Qualification Plan. Description of Each Change & Justification That Change Does Not Decrease Effectiveness of Training & Qualification Plan ML20217Q2601997-08-25025 August 1997 Forwards CP&L Semiannual FFD Program Performance Data for Period of 970101-0630,per 10CFR26.71(d) RA-97-0042, Requests Extension on Sf Rail Transportation Route Approval, Provided by CE Haughney1997-03-24024 March 1997 Requests Extension on Sf Rail Transportation Route Approval, Provided by CE Haughney RA-97-0002, Forwards Rev 33 to Industrial Security Plan.Encl Withheld1997-02-12012 February 1997 Forwards Rev 33 to Industrial Security Plan.Encl Withheld ML18065B0081996-10-14014 October 1996 Informs That Overheads Will Be Presented by Licensee at 961016 Meeting at NRC Headquarters in White Flint.Encl Withheld RA-96-0142, Forwards Correction to Ltr Re Spent Fuel Shipping1996-08-0808 August 1996 Forwards Correction to Ltr Re Spent Fuel Shipping RA-96-0133, Submits Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at NPPs1996-07-17017 July 1996 Submits Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at NPPs ML20147C2591996-06-17017 June 1996 Forwards Exam Outline for NRC Exam to Be Administered Wk of 960819 at Plant RA-96-0088, Forwards Three Copies of Rev 32 to Industrial Security Plan. Encl Withheld1996-04-29029 April 1996 Forwards Three Copies of Rev 32 to Industrial Security Plan. Encl Withheld RA-96-0015, Transmits Three Copies of Rev 31 to Industrial Security Plan for Plant.Plan Withheld1996-01-29029 January 1996 Transmits Three Copies of Rev 31 to Industrial Security Plan for Plant.Plan Withheld RA-95-0194, Forwards Rev 29 to Industrial Security Plan.Rev Incorporates Changes Associated W/Elimination of Commitment to Incorporate TSC Into Protected Area When TSC Activated.Encl Withheld Per 10CFR73.211995-11-0808 November 1995 Forwards Rev 29 to Industrial Security Plan.Rev Incorporates Changes Associated W/Elimination of Commitment to Incorporate TSC Into Protected Area When TSC Activated.Encl Withheld Per 10CFR73.21 RA-95-0086, Forwards Rev 28 to Industrial Security Plan & Rev 5 to Safeguards Contingency Plan for Plant Unit 2.Encls Withheld Per 10CFR73.211995-05-0404 May 1995 Forwards Rev 28 to Industrial Security Plan & Rev 5 to Safeguards Contingency Plan for Plant Unit 2.Encls Withheld Per 10CFR73.21 ML20082H0051995-04-0404 April 1995 Requests re-approval of Transportation Route for Irradiated Reactor Fuel Shipment by 951201,per 10CFR73.37(b)(7) RA-95-0053, Forwards Revs to Emergency Plan & Procedures.Changes to Plan Includes Inclusion of New Ltrs of Agreement from Byerly Hosp & Darlington County 911 Ctr & Change in Name of CP&L Meteorology Unit to Contract Meteorologic Personnel1995-03-21021 March 1995 Forwards Revs to Emergency Plan & Procedures.Changes to Plan Includes Inclusion of New Ltrs of Agreement from Byerly Hosp & Darlington County 911 Ctr & Change in Name of CP&L Meteorology Unit to Contract Meteorologic Personnel RA-95-0056, Forwards Rept of Change Made Per 10CFR72.48(a) at Plant Isfs.Change Described in Encl Accomplished in 1993 & Inadvertently Omitted from Rept Submitted in 19941995-03-20020 March 1995 Forwards Rept of Change Made Per 10CFR72.48(a) at Plant Isfs.Change Described in Encl Accomplished in 1993 & Inadvertently Omitted from Rept Submitted in 1994 RA-95-0037, Forwards Summary of Description of Proposed Vehicle Control Measures & Vehicle Bomb Comparison.Encl Withheld1995-02-28028 February 1995 Forwards Summary of Description of Proposed Vehicle Control Measures & Vehicle Bomb Comparison.Encl Withheld ML20078B8801995-01-24024 January 1995 Transmits Safeguards Info Re 95-0055 Advance Fuel Shipment Notification.Encl Withheld RA-95-0012, Forwards Rev 27 to Industrial Security Plan.Changes Do Not Decrease Effectiveness of Plan & Level of Security Provided. Encl Withheld1995-01-19019 January 1995 Forwards Rev 27 to Industrial Security Plan.Changes Do Not Decrease Effectiveness of Plan & Level of Security Provided. Encl Withheld ML20079B3501994-12-27027 December 1994 Responds to NRC Re Violations Noted in Insp Rept 50-261/94-23.Corrective Actions:Procedure GP-007 Revised,Ts Section 3 Reviewed & Evaluation of RCS Temp Control Practices During Hot Shutdown Conditions Conducted.Fee Paid ML20077K3081994-12-20020 December 1994 Forwards Final Exercise Rept for 931130 Full Participation Plume Exposure & Partial Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to Plant ML20077F5731994-12-0909 December 1994 Discusses Commitments Made During Enforcement Conference Conducted 941017 Re Failure to Maintain Pressurizer Cool Down Rate within TS Limits & Failure to Establish Containment Integrity in Accordance W/Ts ML20077D0151994-12-0505 December 1994 Provides Addl Info to Supporting Request for Exemption from 10CFR73.55(d)(5) Re Issuance,Storage & Retrieval of Picture Badges for Contractors Who Have Been Granted Unescorted Access to Protected Areas of Bsep,Shnpp & Hbrsep.Withheld ML20073H4831994-09-29029 September 1994 Responds to NRC Re Violation Noted in Insp Rept 50-261/94-16.Corrective Action:Emergency Operating Procedures Were Revised to Place Operating Restrictions on HVS-1 ML20073H3181994-09-29029 September 1994 Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in Insp Rept 50-261/94-16. Corrective Actions:Plant Operating Procedures & EOPs Revised to Place Operating Restrictions on RAB Supply Fan HVS-1 ML20082T6121994-09-0606 September 1994 Forwards Rev 26 to Plant Industrial Security Plan for Unit 2.Encl Withheld Per 10CFR73.21 ML20071N0651994-07-29029 July 1994 Requests Exemption from 10CFR73.55(d)(5) Requirements Re Issuance,Storage & Retrieval of Picture Badges for Contractors That Is Granted Unescorted Access to Protected Areas ML20080Q4011994-06-20020 June 1994 FOIA Request for Documents of Any & All Documents,Records & Info Relating to Allegation or Allegations Designated by NRC W/Identifier RII-93-A-0182,relating to CP&L &/Or CP&L Plant, Unit 2 Including But Not Limited to Any NRC Insp ML20070A2481994-06-17017 June 1994 Forwards Rev 25 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20057E8901993-09-29029 September 1993 Forwards Rev 4 to Safeguards Contingency Plan for Hb Robinson Steam Electric Plant,Unit 2,per 10CFR50.54(p). Plan Withheld,Per 10CFR73.21 ML20057E8861993-09-29029 September 1993 Forwards Rev 5 to Security Training & Qualification Plan for Hb Robinson Steam Electric Plant,Unit 2,per 10CFR50.54(p). Plan Withheld,Per 10CFR73.21 ML20057C1671993-09-13013 September 1993 Forwards Rev 23 to Industrial Security Plan.Rev Incorporates Changes Associated W/Mgt Structure of Security Organization, New Equipment Location,Completion of O&M Bldg & Other Administrative Changes.Rev Withheld,Per 10CFR73.21 ML20149K1551993-08-23023 August 1993 Forwards Info Which May Help W/Investigation Re Being Terminated from CP&L in Nov 1992 ML20024H9071993-07-27027 July 1993 Provides Updated Status of Activities Being Performed at Auburn Steel Corporation Facility in Auburn,Ny ML20149K0811993-06-27027 June 1993 Forwards Ltr Sent to NRC on 930525,alleging That Employment W/Cp&L Terminated in Nov 1992 as Result of Compliants to NRC Re Erosion/Corrosion Program at Plant.Requests Info Re Action NRC Plans to Take ML20044G6101993-05-28028 May 1993 Forwards Rev 5 to Design Guide DG-II.20, Design Guide for Civil/Structural Operability Reviews & Rev 0 to 92C1737A, Recommended Operability Criteria for Piping Sys Subj to Level D Svc Ladings for Carolina Power & Light Nuclear.. ML20149K0571993-05-25025 May 1993 Alleges That Employment W/Cp&L Terminated in Nov 1992 as Direct Result of Complaints to NRC Re Erosion/Corrosion Program at Plant.Findings by NRC Outlined in 1992 SALP Rept ML20035B4001993-03-26026 March 1993 Confirms That $114,452 Electronically Transferred to Dept of Treasury,Nrc on 930324 for Fees for Period 920322-0627 for Listed Invoices ML20128M9051993-02-17017 February 1993 Forwards Addl Info for ERDS Data Point Library,Consisting of Revised & Replacement Pages ML20127M3911992-10-0202 October 1992 Forwards Util Response to Appeal to NRC Commissioners of NRC Staff Denial of Nirs Petitions for Immediate Enforcement Action of 920721 & 0812 ML20106C7931992-09-22022 September 1992 Provides Data Point Library Re Emergency Response Data Sys. Submittal Completes Emergency Response Data Sys Info Requirements Contained in NUREG-1394,Rev 1 ML20127E2951992-09-0303 September 1992 Forwards Appeal Under 10CFR2.206 of NRC 920819 Denial of 920721 Petition for Emergency Enforcement Action & 920812 Addenda 1999-04-01 Category:UTILITY TO NRC MONTHYEARML17348B4941990-08-30030 August 1990
[Table view]Forwards Semiannual 10CFR26 fitness-for-duty Program Data for 900103-0630.Mgt Decision Made to Utilize Alcohol Breath Instruments as Screening Devices for Unscheduled Work Call Outs in Determining fitness-for-duty ML14188B6961990-04-23023 April 1990 Forwards Proprietary Thermal Hydraulic Compatibility Analysis of Advanced Nuclear Fuel High Thermal Performance for Hb Robinson,Unit 2. Rept Withheld (Ref 10CFR2.790(b)) ML18033B7561990-03-0202 March 1990 Responds to Crdr Portion of post-implementation Audit of TMI Action Plan Items I.D.1 & I.D.2 Conducted on 890613-16. Implementation of Reactor Coolant Pump Temp Indication Project Rescheduled for Refueling Outage 14 in 1992 ML20011F2531990-02-23023 February 1990 Forwards Rev 18 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML14188B6731990-02-0606 February 1990 Forwards Proprietary Hb Robinson Unit 2,Cycle 14 SAR & Mechanical Licensing Rept for Hb Robinson High Thermal Performance Fuel Assemblies. Repts Withheld (Ref 10CFR2.790) ML19332B9011989-11-10010 November 1989 Responds to Generic Ltr 89-07 Re Power Reactor Safeguards Contingency Planning for Surface Vehicle bombs.Short-term Actions Included in Safeguards Planning ML19327B4751989-10-24024 October 1989 Forwards Rev 17 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML19327B4721989-10-24024 October 1989 Forwards Rev 3 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) ML18033B7471989-06-16016 June 1989 Responds to Violations Noted in Insp Rept 50-261/89-08. Corrective Actions:Surveillance Procedures Used for safety- Related Steam Driven Auxiliary Feedwater Pump Being Revised to Ensure Compatability When Performed Concurrently ML20245F3481989-04-24024 April 1989 Forwards Rev 16 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20245C1361989-04-17017 April 1989 Forwards Transcript of Dept of Labor 851216 Hearing in Columbia,Sc Re PA Blackburn Vs Metric Constructors,Inc. Believes That Hearing Record Strongly Supports Position That Enforcement Action Against CP&L Unwarranted ML20236B8371989-03-0202 March 1989 Provides Listing of Results of Util Analysis for Sr-89, Sr-90,Fe-55 & Tritium in NRC Spiked Samples Received on 890103 ML20151E6011988-07-15015 July 1988 Responds to Violations Noted in Insp of License DPR-23 & Enforcement Action 88-88 Re Proposed Imposition of Civil Penalties.Takes Exception to Violation as Stated.Analyses Indicate 10CFR50,App K Criteria Fully Met ML18033B7411988-05-27027 May 1988 Responds to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants, Per 10CFR50.54(f) ML20196J4351988-03-0707 March 1988 Responds to Regulatory Effectiveness Review on 871207-11. Corrective Actions Withheld (Ref 10CFR2.790) ML20236W2421987-12-0202 December 1987 Requests That Listed Name & Address Be Published in Fr as Atty for Licensee in All Notices Re Brunswick Steam Electric Plant,Units 1 & 2,Shearon Harris Plant & H.B.Robinson Steam Electric Plant Unit 2 ML20236Q8321987-11-13013 November 1987 Responds to SALP Repts 50-261/87-22,50-324/87-19, 50-325/87-19 for Nov 1985 - June 1987 & 50-400/87-24 for Aug 1986 - June 1987.Issues Noted in Repts Re Util Overall Performance Discussed ML20236H1091987-10-27027 October 1987 Forwards Response to Insp Rept 50-261/87-26.Response Withheld (Ref 10CFR2.790(d) & 10CFR73.21) ML20236C5031987-10-21021 October 1987 Forwards Amended Rev 13 to Plant Security Plan,Per NRC 870925 Request for Addl Info.Rev Withheld (Ref 10CFR73.21) ML18004B9531987-09-30030 September 1987 Submits Results of Followup at Hb Robinson from Commitment for Further Action in Util Response to Insp Rept 50-400/87-22 Re Exposure to Noble Gas.Potential Unassigned Skin Dose to 11 Personnel Found Insignificant ML20235G7971987-09-23023 September 1987 Clarifies Response to 870824 RII-87-07-01-SL4 Notice of Violation.Corrective Actions:Procurement of 8-inch Schedule 160 Calibr Block Initiated ML20234F4021987-09-17017 September 1987 Forwards Addl Info Re Facility Responses to IE Bulletin 85-003,per NRC 870818 Request.Water Hammer Due to Valve Closure Not Considered in Determination of Differentials for Valves Listed in 860730 Response ML20238A2921987-08-21021 August 1987 Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/87-22 & Assessment of Applicability of Finding at Facility.Util Denies Violation Re TLD Concentration of Noble Gas in Containment ML20235T7491987-08-14014 August 1987 Forwards Util Comments Re Exam Rept 50-261/OL-87-01 on 870811-14.Comments Made by Listed Instructors from Plant Training Unit ML20235X9721987-07-21021 July 1987 Forwards List of Changes to Facility Described in Fsar,Per 10CFR50.59 ML20215C8461987-06-11011 June 1987 Forwards Listing of Pressure Isolation Valves,Description of Periodic Testing,Leakage Acceptance Criteria,Operational Limits & Testing Frequency,In Response to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity.. ML20214R5051987-06-0202 June 1987 Forwards Rev 1 to Monthly Operating Rept for Apr 1987 Due to Mathematical Errors Re Operation Statistics & Shutdown Experience ML20210B3911987-04-29029 April 1987 Forwards Rev 1 to Monthly Operating Rept for Mar 1987.Rev Includes Addl Unit Shutdown Not Reported in Original Issue ML20206C2091987-03-20020 March 1987 Forwards Amend 1 to ISFSI SAR, for Incorporation Into Sar. Requests Completion of Encl Ack Form ML20205Q3681987-03-0606 March 1987 Documents Agreements Reached in 870105 Meeting W/Shearon Harris Energy & Environ Ctr & State of Sc Bureau of Radiological Health Re Environ Monitoring Program Coordination W/State of Sc.Sampling Calendar for 1987 Encl ML20212H4821987-02-27027 February 1987 Submits 1986 Annual Rept on Primary Safety & Relief Valve Challenges as Required by Tech Spec 6.9.1.b.3 ML20210T6411987-02-11011 February 1987 Advises That Redemonstration of Facility Exercise Scenario Forwarded to W Sartor for Exercise Scheduled on 870218. Controller/Evaluator Meeting Will Be Held on 870217 in Technical Support Ctr/Emergency Facility Training Bldg ML20210B3011987-02-0303 February 1987 Confirms 870109 & 13 Telcons W/Region II Re Violation Noted in Insp Rept 50-261/86-21.Corrective Actions:Training for Accident Assessment Team & Damage Control Team Completed on 861231 & 870109,respectively ML20212J9291987-01-16016 January 1987 Forwards Rev 4 to Security Personnel Training & Qualification Plan Re Use of Newly Installed Electronic Security Search Equipment.Rev Withheld (Ref 10CFR2.790 & 73.21) ML20210B5041987-01-16016 January 1987 Suppls Info Discussed in Insp Rept 50-261/86-12 Re IE Bulletin 82-02, Degradation of Threaded Fasteners in RCPB of PWR Plants. Reactor Vessel Head Closure Studs Addressed by Inservice Insp 05000261/LER-1986-012-01, Forwards LER 86-012-01,revising Level of Reactor Power from Which Unit Tripped from 42% to 13%.Operating Mode Marked N as Recommended by NUREG-10221987-01-15015 January 1987 Forwards LER 86-012-01,revising Level of Reactor Power from Which Unit Tripped from 42% to 13%.Operating Mode Marked N as Recommended by NUREG-1022 ML20207L6281987-01-0606 January 1987 Responds to Violations Noted in Insp Rept 50-261/86-28. Corrective Actions:Event Discussed W/Operators Involved & Disciplinary Action W/Operator & Two I&C Technicians Taken to Emphasize Importance of Following Procedures Correctly ML20207N7771987-01-0202 January 1987 Forwards Rev 0 to CPL-18-120, Supplemental Info in Support of Conservatisms in Criticality Analysis Performed for Hb Robinson ISFSI, Per NRC 861202 Request for Addl Info to Support Review of 861031 Application for Amend to License ML20207K1791987-01-0202 January 1987 Forwards Revs to Emergency Plan & Procedures & List of Revs. W/O Plan & Procedures ML20215F4081986-12-11011 December 1986 Forwards Rev 14 to Industrial Security Plan.Rev Involves Realignment of Portion of Protected Area Barrier & Associated Hardware.Rev Withheld (Ref 10CFR2.790(d)(1) & 73.21) ML20215A1231986-12-0505 December 1986 Forwards Meeting Notes Documenting 861020-24 Tech Spec Meeting in Bethesda,Md,Per Request ML20214K6551986-11-26026 November 1986 Forwards Rev 13 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20214L3921986-11-18018 November 1986 Responds to Violations Noted in Insp Rept 50-261/86-26. Corrective Actions:Changes to 1985 Facility Summary Rept Prepared & Submitted to NRC on 860926 & Personnel Responsible for Submittal of Rept Counseled ML20213G0801986-11-0404 November 1986 Forwards Revs to Emergency Plans & Procedures.W/O Encls ML20213G1161986-11-0303 November 1986 Forwards Response to IE Bulletin 86-003 Re Potential Failure of Multiple ECCS Pumps Due to Single Failure of air- Operated Valve in Min Flow Recirculation Line.Mechanical Block Installed on Each Valve Actuator & Procedures Revised ML20213D6531986-10-30030 October 1986 Forwards Rev 12 (Annex B) to Industrial Security Plan Re Security for Isfsi.Rev Withheld (Ref 10CFR73.21 & 2.790(d)(1)) ML20215J9621986-10-17017 October 1986 Responds to Violations Noted in Insp Rept 50-261/86-21. Corrective Actions:Accident Assessment & Damage Control Team Members Designated & Appropriate Training Initiated ML20215K0161986-10-16016 October 1986 Responds to Violations Noted in Insp Rept 50-261/86-20. Corrective Actions:Procedure Revised to Allow for SCBA Fit Testing & Personnel Trained in Procedural Guidance for Doing Surveys of Matls Prior to Release from Radiation Area ML20210C7911986-10-0202 October 1986 Forwards Comments Re 860930 Reactor & Senior Reactor Operator Written Exams Administered by CA Casto.Exams Reviewed by Listed Instructors from Training Unit ML18022A4451986-09-29029 September 1986 Requests Approval to Provide NRC W/Npdes Permit & Any Authorized Changes to Enable Adequate Notification of Significant Environ Events 1990-08-30 |
Text
1 i
L
' ' .N, '..' ,
1 CP&L Carolina Power & Light Company o '
85 J AN zu e c H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 JAN 2 51985 Robinson File No: 13510E Serial: RNPD/85-194 Mr. James P. O'Reilly Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30323 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 I. E. INSPECTION REPORT IER-84-48
Dear Mr. O'Reilly:
Carolina Power and Light (CP&L) has received and reviewed the subject report and provides the following response.
Severity Level V Violation (IER-84-48-01-SL5) 10CFR50, Appendix B, Criterion XIII requires measures be established to control the handling, storage, and preservation of materials and equipment in accordance with work and inspection procedures to prevent damage or deterioration. FSAR Section 1.8 - Regulatory Guide 1.38 requires that tapes and adhesive materials when used on austenitic stainless steel and nickel alloy materials, shall not be compounded from or treated with chemical compounds containing lead, zinc, copper, sulfur, or mercury or more than 0.1 percent (1,000 ppm) halogens where such elements are leachable or where they could be released by breakdown of the compounds under expected environmental conditions.
Contrary to the above, adequate measures were not established to control the preservation of austenitic stainless steel from contamination, in that Health Physics signs were applied to safety-related austenitic stainless steel piping without verification that the sign adhesive analysis was consistent with the licensee's Quality Assurance Program requirements.
Response
- 1. Admission or Denial of the Alleged Violation CP&L acknowledges the alleged violation.
8503050059 EH50208 gDR ADOCK 05000261 PDR
5
.h tt:r to Mr. Jcmes P. O'Railly S; rial: RNPD/85-194 Page 2
- 2. Reason for the Violation The lasue of Health Physics stickers being used on stainless steel components at H. B. Robinson had been previously identified. At that ,
time a decision was made to discontinue their use on safety-related stainless steel and nickel alloy components. An extensive effort ensued to remove the existing stickers from stainless steel components.
It is felt that the few Health Physics stickers found on the stainless steel piping were missed when this effort was conducted.
3 Corrective Steps Which Have Been Taken The Health Physics stickers were removed and a detailed search was conducted to ensure no others were attached to stainless steel or nickel alloy components. The stickers have been analyzed for chlorides and found to be within the allowed specification.
A memorandum to Robinson Nuclear Project Department Managers and Supervisors has been issued to ensure personnel are familiar with the requirements for controlling the use of material in contact sith stainless steel components.
- 4. Corrective Steps Which Will be Taken TMM-003, "Q-List Control Procedure" will be revised to contain a note stating that the use of any materials not specifically contained in this list shall be prohibited unless previously approved.
- 5. Date When Full Compliance Will be Achieved Full compliance will be achieved by March 1, 1985.
If you have any questions concerning this response, please contact Mr. David C. Stadler at (803) 383-4524, Extension 363 Very truly yours,
. i W R. E. Morgan General Manager H. B. Robinson S. E. Plant JCS/tk