Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17348B49430 August 1990Forwards Semiannual 10CFR26 fitness-for-duty Program Data for 900103-0630.Mgt Decision Made to Utilize Alcohol Breath Instruments as Screening Devices for Unscheduled Work Call Outs in Determining fitness-for-dutyFitness for Duty
ML14188B69623 April 1990Forwards Proprietary Thermal Hydraulic Compatibility Analysis of Advanced Nuclear Fuel High Thermal Performance for Hb Robinson,Unit 2. Rept Withheld (Ref 10CFR2.790(b))Affidavit
ML18033B7562 March 1990Responds to Crdr Portion of post-implementation Audit of TMI Action Plan Items I.D.1 & I.D.2 Conducted on 890613-16. Implementation of Reactor Coolant Pump Temp Indication Project Rescheduled for Refueling Outage 14 in 1992Emergency Lighting
ML20011F25323 February 1990Forwards Rev 18 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21)
ML14188B6736 February 1990Forwards Proprietary Hb Robinson Unit 2,Cycle 14 SAR & Mechanical Licensing Rept for Hb Robinson High Thermal Performance Fuel Assemblies. Repts Withheld (Ref 10CFR2.790)Shutdown Margin
Affidavit
ML19332B90110 November 1989Responds to Generic Ltr 89-07 Re Power Reactor Safeguards Contingency Planning for Surface Vehicle bombs.Short-term Actions Included in Safeguards Planning
ML19327B47224 October 1989Forwards Rev 3 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)Safeguards Contingency Plan
ML19327B47524 October 1989Forwards Rev 17 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21)
ML18033B74716 June 1989Responds to Violations Noted in Insp Rept 50-261/89-08. Corrective Actions:Surveillance Procedures Used for safety- Related Steam Driven Auxiliary Feedwater Pump Being Revised to Ensure Compatability When Performed Concurrently
ML20245F34824 April 1989Forwards Rev 16 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20245C13617 April 1989Forwards Transcript of Dept of Labor 851216 Hearing in Columbia,Sc Re PA Blackburn Vs Metric Constructors,Inc. Believes That Hearing Record Strongly Supports Position That Enforcement Action Against CP&L Unwarranted
ML20236B8372 March 1989Provides Listing of Results of Util Analysis for Sr-89, Sr-90,Fe-55 & Tritium in NRC Spiked Samples Received on 890103
ML20151E60115 July 1988Responds to Violations Noted in Insp of License DPR-23 & Enforcement Action 88-88 Re Proposed Imposition of Civil Penalties.Takes Exception to Violation as Stated.Analyses Indicate 10CFR50,App K Criteria Fully MetUnanalyzed Condition
Incorporated by reference
Backfit
ML18033B74127 May 1988Responds to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants, Per 10CFR50.54(f)Boric Acid
ML20196J4357 March 1988Responds to Regulatory Effectiveness Review on 871207-11. Corrective Actions Withheld (Ref 10CFR2.790)
ML20236W2422 December 1987Requests That Listed Name & Address Be Published in Fr as Atty for Licensee in All Notices Re Brunswick Steam Electric Plant,Units 1 & 2,Shearon Harris Plant & H.B.Robinson Steam Electric Plant Unit 2
ML20236Q83213 November 1987Responds to SALP Repts 50-261/87-22,50-324/87-19, 50-325/87-19 for Nov 1985 - June 1987 & 50-400/87-24 for Aug 1986 - June 1987.Issues Noted in Repts Re Util Overall Performance DiscussedHigh Radiation Area
Weld Overlay
Locked High Radiation Area
Missed surveillance
Systematic Assessment of Licensee Performance
Integrated leak rate test
Scaffolding
Backfit
ML20236H10927 October 1987Forwards Response to Insp Rept 50-261/87-26.Response Withheld (Ref 10CFR2.790(d) & 10CFR73.21)
ML20236C50321 October 1987Forwards Amended Rev 13 to Plant Security Plan,Per NRC 870925 Request for Addl Info.Rev Withheld (Ref 10CFR73.21)
ML18004B95330 September 1987Submits Results of Followup at Hb Robinson from Commitment for Further Action in Util Response to Insp Rept 50-400/87-22 Re Exposure to Noble Gas.Potential Unassigned Skin Dose to 11 Personnel Found Insignificant
ML20235G79723 September 1987Clarifies Response to 870824 RII-87-07-01-SL4 Notice of Violation.Corrective Actions:Procurement of 8-inch Schedule 160 Calibr Block Initiated
ML20234F40217 September 1987Forwards Addl Info Re Facility Responses to IE Bulletin 85-003,per NRC 870818 Request.Water Hammer Due to Valve Closure Not Considered in Determination of Differentials for Valves Listed in 860730 ResponseSafe Shutdown
ML20238A29221 August 1987Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/87-22 & Assessment of Applicability of Finding at Facility.Util Denies Violation Re TLD Concentration of Noble Gas in ContainmentGrab sample
ML20235T74914 August 1987Forwards Util Comments Re Exam Rept 50-261/OL-87-01 on 870811-14.Comments Made by Listed Instructors from Plant Training UnitBoric Acid
Loss of condenser vacuum
ML20235X97221 July 1987Forwards List of Changes to Facility Described in Fsar,Per 10CFR50.59
ML20215C84611 June 1987Forwards Listing of Pressure Isolation Valves,Description of Periodic Testing,Leakage Acceptance Criteria,Operational Limits & Testing Frequency,In Response to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity..Stroke time
ML20214R5052 June 1987Forwards Rev 1 to Monthly Operating Rept for Apr 1987 Due to Mathematical Errors Re Operation Statistics & Shutdown Experience
ML20210B39129 April 1987Forwards Rev 1 to Monthly Operating Rept for Mar 1987.Rev Includes Addl Unit Shutdown Not Reported in Original Issue
ML20206C20920 March 1987Forwards Amend 1 to ISFSI SAR, for Incorporation Into Sar. Requests Completion of Encl Ack FormFire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Incorporated by reference
Finite Element Analysis
Tornado Generated Missile
Design basis earthquake
Earthquake
Fuel cladding
Scaffolding
ML20205Q3686 March 1987Documents Agreements Reached in 870105 Meeting W/Shearon Harris Energy & Environ Ctr & State of Sc Bureau of Radiological Health Re Environ Monitoring Program Coordination W/State of Sc.Sampling Calendar for 1987 Encl
ML20212H48227 February 1987Submits 1986 Annual Rept on Primary Safety & Relief Valve Challenges as Required by Tech Spec 6.9.1.b.3
ML20210T64111 February 1987Advises That Redemonstration of Facility Exercise Scenario Forwarded to W Sartor for Exercise Scheduled on 870218. Controller/Evaluator Meeting Will Be Held on 870217 in Technical Support Ctr/Emergency Facility Training Bldg
ML20210B3013 February 1987Confirms 870109 & 13 Telcons W/Region II Re Violation Noted in Insp Rept 50-261/86-21.Corrective Actions:Training for Accident Assessment Team & Damage Control Team Completed on 861231 & 870109,respectively
ML20212J92916 January 1987Forwards Rev 4 to Security Personnel Training & Qualification Plan Re Use of Newly Installed Electronic Security Search Equipment.Rev Withheld (Ref 10CFR2.790 & 73.21)
ML20210B50416 January 1987Suppls Info Discussed in Insp Rept 50-261/86-12 Re IE Bulletin 82-02, Degradation of Threaded Fasteners in RCPB of PWR Plants. Reactor Vessel Head Closure Studs Addressed by Inservice InspStress corrosion cracking
05000261/LER-1986-012, Forwards LER 86-012-01,revising Level of Reactor Power from Which Unit Tripped from 42% to 13%.Operating Mode Marked N as Recommended by NUREG-102215 January 1987Forwards LER 86-012-01,revising Level of Reactor Power from Which Unit Tripped from 42% to 13%.Operating Mode Marked N as Recommended by NUREG-1022
ML20207L6286 January 1987Responds to Violations Noted in Insp Rept 50-261/86-28. Corrective Actions:Event Discussed W/Operators Involved & Disciplinary Action W/Operator & Two I&C Technicians Taken to Emphasize Importance of Following Procedures Correctly
ML20207N7772 January 1987Forwards Rev 0 to CPL-18-120, Supplemental Info in Support of Conservatisms in Criticality Analysis Performed for Hb Robinson ISFSI, Per NRC 861202 Request for Addl Info to Support Review of 861031 Application for Amend to License
ML20207K1792 January 1987Forwards Revs to Emergency Plan & Procedures & List of Revs. W/O Plan & Procedures
ML20215F40811 December 1986Forwards Rev 14 to Industrial Security Plan.Rev Involves Realignment of Portion of Protected Area Barrier & Associated Hardware.Rev Withheld (Ref 10CFR2.790(d)(1) & 73.21)
ML20215A1235 December 1986Forwards Meeting Notes Documenting 861020-24 Tech Spec Meeting in Bethesda,Md,Per RequestTime of Discovery
ML20214K65526 November 1986Forwards Rev 13 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20214L39218 November 1986Responds to Violations Noted in Insp Rept 50-261/86-26. Corrective Actions:Changes to 1985 Facility Summary Rept Prepared & Submitted to NRC on 860926 & Personnel Responsible for Submittal of Rept Counseled
ML20213G0804 November 1986Forwards Revs to Emergency Plans & Procedures.W/O Encls
ML20213G1163 November 1986Forwards Response to IE Bulletin 86-003 Re Potential Failure of Multiple ECCS Pumps Due to Single Failure of air- Operated Valve in Min Flow Recirculation Line.Mechanical Block Installed on Each Valve Actuator & Procedures Revised
ML20213D65330 October 1986Forwards Rev 12 (Annex B) to Industrial Security Plan Re Security for Isfsi.Rev Withheld (Ref 10CFR73.21 & 2.790(d)(1))
ML20215J96217 October 1986Responds to Violations Noted in Insp Rept 50-261/86-21. Corrective Actions:Accident Assessment & Damage Control Team Members Designated & Appropriate Training Initiated
ML20215K01616 October 1986Responds to Violations Noted in Insp Rept 50-261/86-20. Corrective Actions:Procedure Revised to Allow for SCBA Fit Testing & Personnel Trained in Procedural Guidance for Doing Surveys of Matls Prior to Release from Radiation Area
ML20210C7912 October 1986Forwards Comments Re 860930 Reactor & Senior Reactor Operator Written Exams Administered by CA Casto.Exams Reviewed by Listed Instructors from Training UnitBoric Acid
Overspeed trip
ML18022A44529 September 1986Requests Approval to Provide NRC W/Npdes Permit & Any Authorized Changes to Enable Adequate Notification of Significant Environ Events