ML20057E890
ML20057E890 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 09/29/1993 |
From: | Waters D CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
RNP-93-2407, NUDOCS 9310130329 | |
Download: ML20057E890 (1) | |
Similar Documents at Robinson | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20211G9851999-08-26026 August 1999
[Table view]Ltr Contract:Task Order 244 Entitled, Technical Assistance in Evaluating Proposed Increase in Allowed Ultimate Heat Sink Temperature of Hb Robinson,Unit 2, Under NRC-03-95-026 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc RA-99-0071, Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld1999-04-0101 April 1999 Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML20210J5761999-03-0404 March 1999 Requests Route re-approval for Rail Transportation Routes, Previously Approved by NRC by Ltr .Two Routes Requested to Be Reapproved,Rail Route 130 & 135.Util Requests That NRC Renew Route Approvals by 990416 RA-99-0011, Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld1999-01-15015 January 1999 Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld RA-98-0153, Transmits Description of Rev 0 to Physical Security & Safeguards Contingency Plan, Which Contains Plant Industrial Security Plan & Safeguards Contingency Plan,Per 10CFR72.44(e)1998-08-27027 August 1998 Transmits Description of Rev 0 to Physical Security & Safeguards Contingency Plan, Which Contains Plant Industrial Security Plan & Safeguards Contingency Plan,Per 10CFR72.44(e) RA-98-0136, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan, for Hb Robinson Steam Electric Plant,Iaw 10CFR50.54(p)(2) & 50.4(b)(4).Summary of Changes Contained in Attachment 1.Plan Withheld,Per 10CFR73.211998-07-17017 July 1998 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan, for Hb Robinson Steam Electric Plant,Iaw 10CFR50.54(p)(2) & 50.4(b)(4).Summary of Changes Contained in Attachment 1.Plan Withheld,Per 10CFR73.21 ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety RA-98-0115, Forwards Rev 36 to Industrial Security Plan for Unit 2.Rev Withheld,Per 10CFR73.211998-06-18018 June 1998 Forwards Rev 36 to Industrial Security Plan for Unit 2.Rev Withheld,Per 10CFR73.21 ML20217P4601998-05-0101 May 1998 Forwards ERDS Implementation Documents Including Data Point Library Updates for Robinson (Number 248),Peach Bottom (Number 249),Surry (Number 250),Crystal River (Number 251), McGuire (Numbers 252 & 254) & Salem (Number 253).W/o Encl ML20212H2391998-03-24024 March 1998 Forwards Insp Rept 50-261/98-04 on 980223-25.No Violations Noted.Physical Security Program for Power Reactors Was Inspected RA-98-0020, Forwards Rev 35 to Industrial Security Plan for Rsep,Unit 2. Rev Incorporates Changes Associated W/Physical Mods Involved W/Implementation of Enhanced Defensive Strategy & Incorporates Addl Level of Descriptive Detail.Encl Withheld1998-02-26026 February 1998 Forwards Rev 35 to Industrial Security Plan for Rsep,Unit 2. Rev Incorporates Changes Associated W/Physical Mods Involved W/Implementation of Enhanced Defensive Strategy & Incorporates Addl Level of Descriptive Detail.Encl Withheld ML20198S2691998-01-22022 January 1998 Ack Receipt of & Fee in Amount of $55,000 in Payment of Civil Penalty Proposed by NRC in ML20198K6631998-01-0909 January 1998 Responds to NRC 971212 NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Corrective Actions:Switch Was Examined & Returned to Normal on 970820.Check for $55,000 for Payment of Civil Penalty Encl.W/O Encl IR 05000261/19970101997-12-12012 December 1997 Discusses Insp Rept 50-261/97-10 on 970831-1011 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000 RA-97-0248, Forwards Rev 34 to Industrial Security Plan for Unit 2.Rev Made Effective on 971204.Rev Withheld,Per 10CFR73.211997-12-0404 December 1997 Forwards Rev 34 to Industrial Security Plan for Unit 2.Rev Made Effective on 971204.Rev Withheld,Per 10CFR73.21 ML20199F2751997-11-19019 November 1997 Forwards Sent to Nuclear Energy Inst on Plant Recent Improved STS Conversion License Amend ML20199F2891997-11-18018 November 1997 Forwards Copy of Sent to Nuclear Energy Inst on Hb Robinson Recent Improved STS Conversion License Amend,For Info & Consideration in Efforts to Convert to Improved STS ML20199F6561997-11-18018 November 1997 Forwards Copy of to Nuclear Energy Inst on Hb Robinson Recent Improved STS Conversion License Amend,For Info & Consideration in Efforts to Convert to Improved STS ML20199F5251997-11-17017 November 1997 Forwards Copy of Sent by NRC to Nuclear Energy Institute on Hb Robinson Recent Improved STS Conversion License Amend,For Info & Consideration in Efforts to Convert to Improved STS ML20199C0501997-11-0707 November 1997 Requests Addl Info Re TSs Change Request to Convert to Improved STS for Plant.Licensee Should Prepare Similar Tables for Plant Conversion as NRC Writes Safety Evaluation RA-97-0188, Forwards Rev 6 to Security Personnel Training & Qualification Plan. Description of Each Change & Justification That Change Does Not Decrease Effectiveness of Training & Qualification Plan1997-09-18018 September 1997 Forwards Rev 6 to Security Personnel Training & Qualification Plan. Description of Each Change & Justification That Change Does Not Decrease Effectiveness of Training & Qualification Plan ML20217Q2601997-08-25025 August 1997 Forwards CP&L Semiannual FFD Program Performance Data for Period of 970101-0630,per 10CFR26.71(d) ML20137X8581997-04-16016 April 1997 Discusses 970324 Request for Two Rail Routes to Be Used for Transport of Sf from Southport,Nc & Hartsville,Sc to New Hill,Sc.Safeguards Info Encl ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities RA-97-0042, Requests Extension on Sf Rail Transportation Route Approval, Provided by CE Haughney1997-03-24024 March 1997 Requests Extension on Sf Rail Transportation Route Approval, Provided by CE Haughney ML20136A6101997-03-0101 March 1997 Final Response to FOIA Request for Documents.Forwards App C Documents Available in Pdr.App D Records Being Withheld in Part (Ref FOIA Exemption 4).App E Completely Withheld (Ref FOIA Exemption 7) ML20134Q0981997-02-21021 February 1997 Ninth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App P.App Q Documents Partially Withheld (Ref FOIA Exemption 6).Documents Also Available in PDR ML20147G2701997-02-19019 February 1997 Extends Invitation to Attend 970325 Meeting Between NRC & Carolina Power & Light Co to Discuss Robinson Nuclear Power Plants Performance Over Past 20 Years as Observer RA-97-0002, Forwards Rev 33 to Industrial Security Plan.Encl Withheld1997-02-12012 February 1997 Forwards Rev 33 to Industrial Security Plan.Encl Withheld RA-97-0028, Submits Advance Notification of Listed Upcoming Shipment of Irradiated Nuclear Reactor Fuel,Iaw 10CFR73.371997-02-0404 February 1997 Submits Advance Notification of Listed Upcoming Shipment of Irradiated Nuclear Reactor Fuel,Iaw 10CFR73.37 RA-97-0010, Provides Info Re Forthcoming Shipment of Irradiated Nuclear Reactor Fuel by Carolina Power & Light1997-01-21021 January 1997 Provides Info Re Forthcoming Shipment of Irradiated Nuclear Reactor Fuel by Carolina Power & Light ML20147B4181997-01-10010 January 1997 Provides Info Re Forthcoming Shipment of Irradiated Nuclear Reactor Fuel RA-96-0226, Notification of Forthcoming Shipment of Radioactive Matl in IF-300 Series Shipping Casks,To New Hill,Nc1996-12-20020 December 1996 Notification of Forthcoming Shipment of Radioactive Matl in IF-300 Series Shipping Casks,To New Hill,Nc ML20135B6351996-11-21021 November 1996 Notifies of Shipment of Irradiated Nuclear Reactor Fuel by Carolina Power & Light to Hb Robinson Steam Electric Plant, Unit 2 ML20134J8951996-11-0606 November 1996 Forwards Info IAW 10CFR73.37 Re Forthcoming Shipment of Irradiated Nuclear Fuel by CP&L ML20134K3151996-10-24024 October 1996 Forwards Info IAW 10CFR73.37 Re Forthcoming Shipment of Irradiated Nuclear Fuel by CP&L ML18065B0081996-10-14014 October 1996 Informs That Overheads Will Be Presented by Licensee at 961016 Meeting at NRC Headquarters in White Flint.Encl Withheld RA-96-0142, Forwards Correction to Ltr Re Spent Fuel Shipping1996-08-0808 August 1996 Forwards Correction to Ltr Re Spent Fuel Shipping ML20117C3961996-07-30030 July 1996 Provides Info IAW 10CFR73.37 Concerning Forthcoming Shipment of Irradiated Nuclear Reactor Fuel by CP&L RA-96-0133, Submits Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at NPPs1996-07-17017 July 1996 Submits Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at NPPs ML20147C2591996-06-17017 June 1996 Forwards Exam Outline for NRC Exam to Be Administered Wk of 960819 at Plant RA-96-0088, Forwards Three Copies of Rev 32 to Industrial Security Plan. Encl Withheld1996-04-29029 April 1996 Forwards Three Copies of Rev 32 to Industrial Security Plan. Encl Withheld ML20149K0451996-02-0101 February 1996 Final Response to FOIA Request for Records.Apps a & B Records Encl & Being Placed in Pdr.Foia Request 96-33 by CP&L Also Encl,As Requested.W/O FOIA Request 96-33 RA-96-0015, Transmits Three Copies of Rev 31 to Industrial Security Plan for Plant.Plan Withheld1996-01-29029 January 1996 Transmits Three Copies of Rev 31 to Industrial Security Plan for Plant.Plan Withheld RA-95-0194, Forwards Rev 29 to Industrial Security Plan.Rev Incorporates Changes Associated W/Elimination of Commitment to Incorporate TSC Into Protected Area When TSC Activated.Encl Withheld Per 10CFR73.211995-11-0808 November 1995 Forwards Rev 29 to Industrial Security Plan.Rev Incorporates Changes Associated W/Elimination of Commitment to Incorporate TSC Into Protected Area When TSC Activated.Encl Withheld Per 10CFR73.21 ML14183A6931995-09-18018 September 1995 Forwards Safety Evaluation Re Location of Technical Support Ctr.Licensee Request for Exception to TSC Location Requirement of Suppl 1 to NUREG-0737 Acceptable ML20149K1791995-08-22022 August 1995 Informs That NRC Continuing Review of Allegation RII-93-A-0125 Re Questionable Engineering Practices,In Ref to NRC ,Informing That NRC Initiated Actions to Develop & Examine Facts & Circumstances of Concern RA-95-0086, Forwards Rev 28 to Industrial Security Plan & Rev 5 to Safeguards Contingency Plan for Plant Unit 2.Encls Withheld Per 10CFR73.211995-05-0404 May 1995 Forwards Rev 28 to Industrial Security Plan & Rev 5 to Safeguards Contingency Plan for Plant Unit 2.Encls Withheld Per 10CFR73.21 ML20082H0051995-04-0404 April 1995 Requests re-approval of Transportation Route for Irradiated Reactor Fuel Shipment by 951201,per 10CFR73.37(b)(7) 1999-08-26 Category:INCOMING CORRESPONDENCE MONTHYEARRA-99-0071, Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld1999-04-0101 April 1999
[Table view]Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML20210J5761999-03-0404 March 1999 Requests Route re-approval for Rail Transportation Routes, Previously Approved by NRC by Ltr .Two Routes Requested to Be Reapproved,Rail Route 130 & 135.Util Requests That NRC Renew Route Approvals by 990416 RA-99-0011, Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld1999-01-15015 January 1999 Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld RA-98-0153, Transmits Description of Rev 0 to Physical Security & Safeguards Contingency Plan, Which Contains Plant Industrial Security Plan & Safeguards Contingency Plan,Per 10CFR72.44(e)1998-08-27027 August 1998 Transmits Description of Rev 0 to Physical Security & Safeguards Contingency Plan, Which Contains Plant Industrial Security Plan & Safeguards Contingency Plan,Per 10CFR72.44(e) RA-98-0136, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan, for Hb Robinson Steam Electric Plant,Iaw 10CFR50.54(p)(2) & 50.4(b)(4).Summary of Changes Contained in Attachment 1.Plan Withheld,Per 10CFR73.211998-07-17017 July 1998 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan, for Hb Robinson Steam Electric Plant,Iaw 10CFR50.54(p)(2) & 50.4(b)(4).Summary of Changes Contained in Attachment 1.Plan Withheld,Per 10CFR73.21 RA-98-0115, Forwards Rev 36 to Industrial Security Plan for Unit 2.Rev Withheld,Per 10CFR73.211998-06-18018 June 1998 Forwards Rev 36 to Industrial Security Plan for Unit 2.Rev Withheld,Per 10CFR73.21 RA-98-0020, Forwards Rev 35 to Industrial Security Plan for Rsep,Unit 2. Rev Incorporates Changes Associated W/Physical Mods Involved W/Implementation of Enhanced Defensive Strategy & Incorporates Addl Level of Descriptive Detail.Encl Withheld1998-02-26026 February 1998 Forwards Rev 35 to Industrial Security Plan for Rsep,Unit 2. Rev Incorporates Changes Associated W/Physical Mods Involved W/Implementation of Enhanced Defensive Strategy & Incorporates Addl Level of Descriptive Detail.Encl Withheld ML20198K6631998-01-0909 January 1998 Responds to NRC 971212 NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Corrective Actions:Switch Was Examined & Returned to Normal on 970820.Check for $55,000 for Payment of Civil Penalty Encl.W/O Encl RA-97-0248, Forwards Rev 34 to Industrial Security Plan for Unit 2.Rev Made Effective on 971204.Rev Withheld,Per 10CFR73.211997-12-0404 December 1997 Forwards Rev 34 to Industrial Security Plan for Unit 2.Rev Made Effective on 971204.Rev Withheld,Per 10CFR73.21 RA-97-0188, Forwards Rev 6 to Security Personnel Training & Qualification Plan. Description of Each Change & Justification That Change Does Not Decrease Effectiveness of Training & Qualification Plan1997-09-18018 September 1997 Forwards Rev 6 to Security Personnel Training & Qualification Plan. Description of Each Change & Justification That Change Does Not Decrease Effectiveness of Training & Qualification Plan ML20217Q2601997-08-25025 August 1997 Forwards CP&L Semiannual FFD Program Performance Data for Period of 970101-0630,per 10CFR26.71(d) RA-97-0042, Requests Extension on Sf Rail Transportation Route Approval, Provided by CE Haughney1997-03-24024 March 1997 Requests Extension on Sf Rail Transportation Route Approval, Provided by CE Haughney RA-97-0002, Forwards Rev 33 to Industrial Security Plan.Encl Withheld1997-02-12012 February 1997 Forwards Rev 33 to Industrial Security Plan.Encl Withheld ML18065B0081996-10-14014 October 1996 Informs That Overheads Will Be Presented by Licensee at 961016 Meeting at NRC Headquarters in White Flint.Encl Withheld RA-96-0142, Forwards Correction to Ltr Re Spent Fuel Shipping1996-08-0808 August 1996 Forwards Correction to Ltr Re Spent Fuel Shipping RA-96-0133, Submits Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at NPPs1996-07-17017 July 1996 Submits Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at NPPs ML20147C2591996-06-17017 June 1996 Forwards Exam Outline for NRC Exam to Be Administered Wk of 960819 at Plant RA-96-0088, Forwards Three Copies of Rev 32 to Industrial Security Plan. Encl Withheld1996-04-29029 April 1996 Forwards Three Copies of Rev 32 to Industrial Security Plan. Encl Withheld RA-96-0015, Transmits Three Copies of Rev 31 to Industrial Security Plan for Plant.Plan Withheld1996-01-29029 January 1996 Transmits Three Copies of Rev 31 to Industrial Security Plan for Plant.Plan Withheld RA-95-0194, Forwards Rev 29 to Industrial Security Plan.Rev Incorporates Changes Associated W/Elimination of Commitment to Incorporate TSC Into Protected Area When TSC Activated.Encl Withheld Per 10CFR73.211995-11-0808 November 1995 Forwards Rev 29 to Industrial Security Plan.Rev Incorporates Changes Associated W/Elimination of Commitment to Incorporate TSC Into Protected Area When TSC Activated.Encl Withheld Per 10CFR73.21 RA-95-0086, Forwards Rev 28 to Industrial Security Plan & Rev 5 to Safeguards Contingency Plan for Plant Unit 2.Encls Withheld Per 10CFR73.211995-05-0404 May 1995 Forwards Rev 28 to Industrial Security Plan & Rev 5 to Safeguards Contingency Plan for Plant Unit 2.Encls Withheld Per 10CFR73.21 ML20082H0051995-04-0404 April 1995 Requests re-approval of Transportation Route for Irradiated Reactor Fuel Shipment by 951201,per 10CFR73.37(b)(7) RA-95-0037, Forwards Summary of Description of Proposed Vehicle Control Measures & Vehicle Bomb Comparison.Encl Withheld1995-02-28028 February 1995 Forwards Summary of Description of Proposed Vehicle Control Measures & Vehicle Bomb Comparison.Encl Withheld ML20078B8801995-01-24024 January 1995 Transmits Safeguards Info Re 95-0055 Advance Fuel Shipment Notification.Encl Withheld RA-95-0012, Forwards Rev 27 to Industrial Security Plan.Changes Do Not Decrease Effectiveness of Plan & Level of Security Provided. Encl Withheld1995-01-19019 January 1995 Forwards Rev 27 to Industrial Security Plan.Changes Do Not Decrease Effectiveness of Plan & Level of Security Provided. Encl Withheld ML20079B3501994-12-27027 December 1994 Responds to NRC Re Violations Noted in Insp Rept 50-261/94-23.Corrective Actions:Procedure GP-007 Revised,Ts Section 3 Reviewed & Evaluation of RCS Temp Control Practices During Hot Shutdown Conditions Conducted.Fee Paid ML20077K3081994-12-20020 December 1994 Forwards Final Exercise Rept for 931130 Full Participation Plume Exposure & Partial Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to Plant ML20077F5731994-12-0909 December 1994 Discusses Commitments Made During Enforcement Conference Conducted 941017 Re Failure to Maintain Pressurizer Cool Down Rate within TS Limits & Failure to Establish Containment Integrity in Accordance W/Ts ML20077D0151994-12-0505 December 1994 Provides Addl Info to Supporting Request for Exemption from 10CFR73.55(d)(5) Re Issuance,Storage & Retrieval of Picture Badges for Contractors Who Have Been Granted Unescorted Access to Protected Areas of Bsep,Shnpp & Hbrsep.Withheld ML20073H4831994-09-29029 September 1994 Responds to NRC Re Violation Noted in Insp Rept 50-261/94-16.Corrective Action:Emergency Operating Procedures Were Revised to Place Operating Restrictions on HVS-1 ML20073H3181994-09-29029 September 1994 Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in Insp Rept 50-261/94-16. Corrective Actions:Plant Operating Procedures & EOPs Revised to Place Operating Restrictions on RAB Supply Fan HVS-1 ML20082T6121994-09-0606 September 1994 Forwards Rev 26 to Plant Industrial Security Plan for Unit 2.Encl Withheld Per 10CFR73.21 ML20071N0651994-07-29029 July 1994 Requests Exemption from 10CFR73.55(d)(5) Requirements Re Issuance,Storage & Retrieval of Picture Badges for Contractors That Is Granted Unescorted Access to Protected Areas ML20080Q4011994-06-20020 June 1994 FOIA Request for Documents of Any & All Documents,Records & Info Relating to Allegation or Allegations Designated by NRC W/Identifier RII-93-A-0182,relating to CP&L &/Or CP&L Plant, Unit 2 Including But Not Limited to Any NRC Insp ML20070A2481994-06-17017 June 1994 Forwards Rev 25 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20057E8901993-09-29029 September 1993 Forwards Rev 4 to Safeguards Contingency Plan for Hb Robinson Steam Electric Plant,Unit 2,per 10CFR50.54(p). Plan Withheld,Per 10CFR73.21 ML20057E8861993-09-29029 September 1993 Forwards Rev 5 to Security Training & Qualification Plan for Hb Robinson Steam Electric Plant,Unit 2,per 10CFR50.54(p). Plan Withheld,Per 10CFR73.21 ML20057C1671993-09-13013 September 1993 Forwards Rev 23 to Industrial Security Plan.Rev Incorporates Changes Associated W/Mgt Structure of Security Organization, New Equipment Location,Completion of O&M Bldg & Other Administrative Changes.Rev Withheld,Per 10CFR73.21 ML20149K1551993-08-23023 August 1993 Forwards Info Which May Help W/Investigation Re Being Terminated from CP&L in Nov 1992 ML20024H9071993-07-27027 July 1993 Provides Updated Status of Activities Being Performed at Auburn Steel Corporation Facility in Auburn,Ny ML20149K0811993-06-27027 June 1993 Forwards Ltr Sent to NRC on 930525,alleging That Employment W/Cp&L Terminated in Nov 1992 as Result of Compliants to NRC Re Erosion/Corrosion Program at Plant.Requests Info Re Action NRC Plans to Take ML20044G6101993-05-28028 May 1993 Forwards Rev 5 to Design Guide DG-II.20, Design Guide for Civil/Structural Operability Reviews & Rev 0 to 92C1737A, Recommended Operability Criteria for Piping Sys Subj to Level D Svc Ladings for Carolina Power & Light Nuclear.... ML20149K0571993-05-25025 May 1993 Alleges That Employment W/Cp&L Terminated in Nov 1992 as Direct Result of Complaints to NRC Re Erosion/Corrosion Program at Plant.Findings by NRC Outlined in 1992 SALP Rept ML20128M9051993-02-17017 February 1993 Forwards Addl Info for ERDS Data Point Library,Consisting of Revised & Replacement Pages ML20127M3911992-10-0202 October 1992 Forwards Util Response to Appeal to NRC Commissioners of NRC Staff Denial of Nirs Petitions for Immediate Enforcement Action of 920721 & 0812 ML20106C7931992-09-22022 September 1992 Provides Data Point Library Re Emergency Response Data Sys. Submittal Completes Emergency Response Data Sys Info Requirements Contained in NUREG-1394,Rev 1 ML20127E2951992-09-0303 September 1992 Forwards Appeal Under 10CFR2.206 of NRC 920819 Denial of 920721 Petition for Emergency Enforcement Action & 920812 Addenda ML20099F1221992-08-0505 August 1992 Forwards Rev 22 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20101M3501992-06-29029 June 1992 Forwards Rev 21A to Industrial Security Plan,Incorporating Changes Associated W/Access Authorization Program That Implements Requirements of 10CFR73.56.Rev Withheld (Ref 10CFR73.21) ML20095B1021992-04-0909 April 1992 Forwards Rev 21 to Industrial Security Plan for Plant.Rev Incorporates Changes Associated W/Access Authorization Program That Implements Requirements of 10CFR73.36.Rev Withheld (Ref 10CFR73.21) 1999-04-01 |
Text
p l i
'C Cp&L 0
s Carchna Power & Light Company
. gg ~ ~ . .
ROBINSON NUCLEAR PLANT POST OFFICE BOX 790 [
HARTSVILLE, SOUT11 CAROLINA 29551 l t
i Robinson File No. 14050 Serial: RNP/93-2407 v 10CFR50.54(p)
United States Nuclear Regulatory Commission CON ~A:NS :
ATTENTION: Document Control Desk '
Washington, DC 20555 7 @, i .t T. 0 "3;
\i : 0 R "i A H. B. ROBINSON STEAM ELECTRIC PIANT, UNIT NO. 9 DOCKET NO. 50-261/ LICENSE No. DPR-23 REVISION 4 TO Tile SAFEGUARDS CONTINGENCY PLAN i
Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Part 50.54(p), !
Carolina Power 6 Light Company hereby transmits the original and three copies {
of Revision 4 to the Safeguards Contingency Plan for the H. B. Robinson Steam Electric Plant, Unit No. 2.
The enclosed contains no changes which are known to decrease the effectiveness of the plan or level of security provided. The revision incorporates changes assoc.iated with the management structure of the Security Organization, new titles and administrative changes.
t The enclosed information has been designated as Safeguards Information and ;
should be protected in accordance with the provisions of 1GCFR73.21.
Please refer any questions regarding this submittal to Mr. Welton R. Hatcher at (919) 546-7316.
Very truly yours, i YitfEN SET.*RhTLD (I'"l ?.'C'ME a ffANDE THIS D00tNETG A; MCualii]tdD .
David B. Waters !
Manager Regulatory Affairs Section ;
JSK:lst Enclosure cc: Mr. S. D. Ebneter (w/two copies of enclosures)
Mr. W. J. Flanagan, Jr. (w/six copies of enclosures)
Mr. B. L. Monafari (w/o enclosures)
Mr. V. T. Orders (w/o enclosures) [6b 9310130329 930929 7 j o j131 M817f
// 3/ :
PDR F
ADDCK 05000261 PDR i
i f7 i
. .