ML14182A306
| ML14182A306 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/16/1999 |
| From: | Brian Bonser NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Young D CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14182A307 | List: |
| References | |
| 50-261-99-03, 50-261-99-3, NUDOCS 9907010260 | |
| Download: ML14182A306 (5) | |
See also: IR 05000261/1999003
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9907010260
DOC.DATE: 99/06/16
NOTARIZED: NO
DOCKET #
.OFACIL:50-261
H.B. Robinson Plant, Unit 2, Carolina Power & Light C
05000261
AUTH.NAME
AUTHOR AFFILIATION
BONSER,B.R.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
YOUNG,D.E.
Carolina Power & Light Co.
SUBJECT: Forwards insp rept 50-261/99-03 on 990411-0522.One violation
of NRC requirements occurred & being treated as non-cited
C
violation consistent with App C of enforcement policy.
DISTRIBUTION CODE: IE01F
COPIES RECEIVED:LTR
ENCL
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
I
NOTES:
E
RECIPIENT
COPIES
RECIPIENT
COPIES
G
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
LPD2-2 PD
1
1
SUBBARATNAM
1
1
C
INTERNAL: AEOD
1
1
DEDRO
1
1
p
CENT
1
1
NRR/DIPM/IOLB
1
1
/IPREXB
1
1
NUDOCS-ABSTRACT
1
1
1
1
OGC/RP
1
1
RGN2
FILE
01
1
1
2
EXTERNAL:
LMITCO MARSHALL
1
1
NOAC
1
1
NRC PDR
1
1
NUDOCS FULLTEXT
1
1
C
C
LOADED FROM
ELECTRM FIL
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
.OR
REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION,
CONTACT THE DOCUMENT CONTRO
DESK (DCD) ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES REQUIRED: LTTR
15
ENCL
15
June 16,
1999
Carolina Power & Light Company
ATTN: Mr. Dale E. Young
Vice President
H. B. Robinson Steam Electric Plant
Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NO. 50-261/99-03
Dear Mr. Young:
This refers to the inspection conducted on April 11 through May 22, 1999, at the Robinson
facility. The enclosed report presents the results of this inspection.
During the six-weeks covered by this inspection period, our inspectors found that your staff
generally took a safety-conscious approach to the activities conducted at the Robinson plant.
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. The violation is being treated as a Non-Cited Violation (NCV),
consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject
inspection report. If you contest the violation or severity level of the NCV, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial to the
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
0001, with copies to the Regional Administrator, Region II, and the Director; Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
(Original signed B. R. Bonser)
Brian R. Bonser, Chief
Reactor Projects Branch 4
Division of Reactor Projects
Docket No. 50-261
License No. DPR-23
.
Enclosure: (See page 2)
9907010260 990616
PDR ADOCK 05000261
2
Enclosure: Integrated NRC Inspection Report
cc w/encl:
John Moyer, Director, Site Operations
Mel Fry, Director
Carolina Power & Light Company
Division of Radiation Protection
H. B. Robinson Steam Electric Plant
N. C. Department of Environment,
3581 West Entrance Road
Health and Natural Resources
Hartsville, SC 29550
3825 Barrett Drive
Raleigh, NC 27609-7721
Tom Walt, Plant General Manager
Carolina Power & Light Company
William D. Johnson
H. B. Robinson Steam Electric Plant
Vice President & Corporate Secretary
3581 West Entrance Road
Carolina Power & Light Company
Hartsville, SC 29550
P. 0. Box 1551
Raleigh, NC 27602
Terry C. Morton, Manager
Performance Evaluation and
John H. O'Neill, Jr.
Regulatory Affairs
CPB 9
Shaw, Pittman, Potts & Trowbridge
Carolina Power & Light Company
2300 N. Street, NW
P. O. Box 1551
Washington, DC 20037-1128
Raleigh, NC 27602-1551
Karen E. Long
H. K. Chernoff, Supervisor
Assistant Attorney General
Licensing/Regulatory Programs
State of North Carolina
Carolina Power & Light Company
P. 0. Box 629
H. B. Robinson Steam Electric Plant
Raleigh, NC 27602
3581 West Entrance Road
Hartsville, SC 29550
Robert P. Gruber
Executive Director
R. L. Warden, Manager
Public Staff - NCUC
Regulatory Affairs
P. 0. Box 29520
Carolina Power & Light Company
Raleigh, NC 27626-0520
H. B. Robinson Steam Electric Plant
3581 W. Entrance Road
Public Service Commission
Hartsville, SC 29550
State of South Carolina
P.O0. Box 11649
Virgil R. Autry, Director
Columbia, SC 29211
Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental
Hartsville Memorial Library
Control
147W. College Avenue
2600 Bull Street
Hartsville, SC 29550
Columbia, SC 29201
Distribution w/encl: (See page 3)
WED, JUN-16-99 1:07PM
NRC ROBINSON RI SITE
803 383 6441
P.01
3
Distribution w/encl:
L. Plisco, RIl
B. Bonser, RIl
R. Subbaratnam, NRR
G. MacDonald, RII
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
2112 West Old Camden Road
Hartsville, SC 29550
OFF~ICEs--[DRPIRI
ORPIR1
DRPIRII
SIGNATURE
7 ,5r' Ao-OrI
NAME
GMaconaid;vg
esai J
AJutto
DATE
ti
199
61
/99
6
199
61
/99
61
/99
6/
199
6/
/99
COPY?
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: A:\\9903rt-2.wpd
TOTAL P.01
.
3
Distribution w/encl:
L. Plisco, RIl
B. Bonser, Rll
R. Subbaratnam, NRR
G. MacDonald, RIl
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
2112 West Old Camden Road
Hartsville, SC 29550
OFFICE
DRPRIIRPRi
DRP/Rll
SIGNATURE
NAME
GMacDonald:vg BDesai
AHutto
DATE
61
199
6/
/99
6/
199
6/
/99
6/
/99
6/
/99
6/
/99
COPY?
YE
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFPICtAL RECORD COPY
DOCUMENT NAME: G:\\ROBINSON\\REPORT19903R1-1.WPD