's 10 CFR 2.201 Carolina Power & Light Company Robinson Nuclear Plant PO Box 790 HartsviHe SC 29551 RNP File No: 13510 Serial: RNP/94-1983 DEC 0 91994 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 II. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/ LICENSE NO. DPR-23 STATUS OF COMMITMENTS MADE DURING ENFC 2 CEMENT CONFERENCE OF OCTOBER 17.1994 Gentlemen:

This refers to commitments made by Carolina Power & Light Company in an enforcement conference conducted in the NRC Region 11 office on October 17, 1994. In the conference, we committed to corrective actions relative to apparent violations regarding failure to maintain pressurizer cool down rate within the Technical Specifications (TS) limits and failure to establish containment integrity in accordance with TS. These issues were described in Licensee Event Reports 50-261/94-019 and 50-261/94-020, and NRC Inspection Report No. 50-261/94-23.

During the enforcement confew .i certain specific corrective actions relating to the Containment Isolation Generic issue Document (GID) were committed to be completed by December 9,1994. Among these actions was a commitment to perform a review of the GID und to revise plant procedures as appropriate. During this review, concerns were identified with regard to the GID not being consistent with the licensing bases of the plant. As a result, we have decided to withdraw the GID from use, and will reconstitute the GID to assure consistency with the plant's licensing bases. Accordingly, our committed corrective actions are currently being revised.

On November 28,1994, the NRC issued a " Notice of Violation and Proposed Imposition of Civil Penalty - $10r W (NRC Inspection Report No. 50-261/94-23)." A revised scope and related schedule for perfonning the corrective actions associated with the containment isolation issues will be included in the response to the Notice.

130109 94121401ea 941209 gi o DR ADOCK 0500 i Highway 151 and SC 23 Hartsville SC ,

U. S. Nuclear Regulatory Commission 2 Please refer any questions regarding this submittal to Mr. K. R. Jury at (803) 857-1363.

Yours very tnity, s

R. ' rich Manager - Regulatory Affairs c: Mr. S. D. Ebneter, Regional Administrator, USNRC, Region II Ms.11. L. Mozafari, USNRC Project Manager, IIBRSEP Mr. W. T. Orders, USNRC Senior Resident Inspector, IIBRSEP

!