Mr. D. E. Young, Vice Pr ent September 10, Carolina Power & Light C p
0pany H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
SITE AUDIT BY NRC AND CONTRACTOR STAFF ON YOUR SUBMITTAL DATED MAY 27, 1999, FOR TECHNICAL SPECIFICATION CHANGE TO ULTIMATE HEAT SINK (UHS) TEMPERATURE - H. B. ROBINSON, UNIT 2 (TAC NO. MA5612)
Dear Mr. Young:
As a result of our ongoing review of your submittal dated May 27, 1999, for a permanent revision to the UHS temperature for the H. B. Robinson Steam Electric Plant, Unit No. 2, the staff proposes to conduct a site audit along with contractor staff during September 20-24, 1999. The purpose of this audit is to review documents containing the needed information and verify the calculation bases related to this submittal. It is our understanding that your licensing staff would like to start the review with an initial kick off meeting and a presentation on the first day of the audit, i.e., September 20, 1999, for which the NRC staff will be present and the subsequent review will be conducted by the contractor. We realize that at that time H. B. Robinson 2 will be in the preparation mode for Refueling Outage 19 (RFO-19). We would like to make sure that you are able to support this audit and provide answers to questions that may arise during the review, and ensure that the calculations are readily available. Our goal is for the contractor to do the review and not have any unanswered questions when they leave the site, thus eliminating the need for a Request for Additional Information. Please confirm that the week of September 20-24, 1999, is all right with you and that you will be able to provide the necessary technical support for this effort.
If you have any questions regarding this request, please do not hesitate to contact me at (301) 415-1478.
Sincerely, Original signed by:
9909140101 990910 Ram Subbaratnam, Project Manager, Section2 PDR ADOCK 05000261 Project Directorate II P
PDR -
Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page DISTRIBUTION:
CD ck~et Fi@
PUBLIC PDIILReading File E. Dunnington J. Tatum/ SPLB J. Zwolinski/S. Black S. Peterson R. Subbaratnam ACRS B. Bonser, RII FILENAME - G:\\PDII-2\\Robinson\\MA5612.AUD PM:PDi-S2 LA:PDiI-S2 SC:PDl-S2
'V rtaga
_EDunningta T_
SVeterso 9~9
/9
,/1 99 9/10/o99 Ybs/No es o Yes/No OFFICIAL-RtCORD COPY
UNITED STATFS NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 1999 Mr D. E. Young, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
SITE AUDIT BY NRC AND CONTRACTOR STAFF ON YOUR SUBMITTAL DATED MAY 27, 1999, FOR TECHNICAL SPECIFICATION CHANGE TO ULTIMATE HEAT SINK (UHS) TEMPERATURE - H. B. ROBINSON, UNIT 2 (TAC NO.
MA5612)
Dear Mr. Young:
As a result of our ongoing review of your submittal dated May 27, 1999, for a permanent revision to the UHS temperature for the H. B. Robinson Steam Electric Plant, Unit No. 2, the staff proposes to conduct a site audit along with contractor staff during September 20-24, 1999. The purpose of this audit is to review documents containing the needed information and verify the calculation bases related to this submittal. It is our understanding that your licensing staff would like to start the review with an initial kick off meeting and a presentation on the first day of the audit, i.e., September 20, 1999, for which the NRC staff will be present and the subsequent review will be conducted by the contractor. We realize that at that time H. B. Robinson 2 will be in the preparation mode for Refueling Outage 19 (RFO-19). We would like to make sure that you are able to support this audit and provide answers to questions that may arise during the review, and ensure that the calculations are readily available. Our goal is for the contractor to do the review and not have any unanswered questions when they leave the site, thus eliminating the need for a Request for Additional Information. Please confirm that the week of September 20-24. 1999, is all right with you and that you will be able to provide the necessary technical support for this effort.
If you have any questions regarding this request, please do not hesitate to contact me at (301) 415-1478.
SiRcerely, Ram Subbaratnam, Project Manager, Sectio 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page
vr. D. E. Young H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:
Mr. William D. Johnson Mr. Mel Fry, Director Vice President and Corporate Secretary N.C. Department of Environment Carolina Power & Light Company and Natural Resources Post Office Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 3825 Barrett Dr.
Raleigh, North Carolina 27609-7721 Ms. Karen E. Long Assistant Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director Post Office Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 Post Office Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Resident Inspector's Office Mr. Virgil R. Autry, Director H. B. Robinson Steam Electric Plant South Carolina Department of Health 2112 Old Camden Road Bureau of Land & Waste Management Hartsville, South Carolina 29550 Division of Radioactive Waste Management 2600 Bull Street Columbia, South Carolina 29201 Mr. Terry C. Morton Manager Performance Evaluation and Mr. J. W. Moyer Regulatory Affairs CPB 7 Director of Site Operations Carolina Power & Light Company Carolina Power & Light Company Post Office Box 1551 H. B. Robinson Steam Electric Plant Raleigh, North Carolina 27602-1551 Unit No. 2 3581 West Entrance Road Mr. John H. O'Neill, Jr.
Hartsville, South Carolina 29550 Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.
Public Service Commission Washington, DC 20037-1128 State of South Carolina Post Office Drawer 11649 Columbia South Carolina 29211 Mr. R. L. Warden Manager - Regulatory Affairs Mr. H. K. Chernoff Carolina Power & Light Company Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Carolina Power & Light Company Unit No. 2 H. B. Robinson Steam Electric Plant, 3581 West Entrance Road Unit No. 2 Hartsville, South Carolina 29550-0790 3581 West Entrance Road Hartsville, South Carolina 29550