ML20210J576
| ML20210J576 | |
| Person / Time | |
|---|---|
| Site: | Brunswick, Robinson |
| Issue date: | 03/04/1999 |
| From: | Morton T CAROLINA POWER & LIGHT CO. |
| To: | Bennington G NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| PE&RAS-99-019, NUDOCS 9908050048 | |
| Download: ML20210J576 (2) | |
Text
N 3-05o o0 R G/ ?.To R CP&L 4 M57 05co o MY660 TL MAR 4 1999 Mrs. Gloria M. Bennington Serial: PE& RAS99-019 Spent Fuel Project Office, NMSS 10CFR73.37(b)(7)
Mail Stop O-6 F18 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/ LICENSE NO. DPR-23 BRUNSWICK NUCLEAR PLANT, UNITS NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324/ LICENSE NOS. DPR-71 AND DPR-62 ROUTE RE-APPROVAL FOR 10 CFR 73 RAIL SHIPMENTS
Dear Mrs. Bennington:
The purpose of this letter is to request a route re-approval for the rail transportation routes, previously approved by the NRC in accordance with 10 CFR 73.37(b)(7) by letter dated April 16,1997. That letter provided a two year approval for the rail transportation routes from the H.
3 B. Robinson Steam Electric Plant, Unit No. 2, and from the Brunswick Steam Electric Plant, Units 1 and 2, to the Shearon Harris Nuclear Power Plant. The two routes requested to be re-approved are Rail Route #130 and Rail Route #135.
In order to support desired shipping schedules, Carolina Power & Light Company requests that j
the NRC renew the route approvals by April 16,1999.
Should you have any questions concerning this matter, please contact either me at (919) 546-6901 or Carey Fleming at (919) 362-2313.
Sincerely, I
& GLL O
b 9908050048 990304 PDR ADOCK 05000261 Aerry Morton P
PDR Manager-Performance Evaluation &
f Regulatory Affairs I
CP&L Nuclear Generation Group ob f
CWF P.O. Box 1551. CPB 9A, RAWGH. NC 27602
.]
p.
. w e Mrs. Gloria M. Bennington j.
U. S. Nuclear Regulatory Commission PE& RAS99-019 Page 2 c:
USNRC Document Control Desk Mr. T. A. Eastick (BSEP Senior NRC Resident)
Mr. B. B. Desai (RNP Senior NRC Resident)
Mr. I A. Reyes (NRC Regional Administrator, Region II)
Mr. D. C. Trimble (NRC - NRR Project Manager, BSEP)
Mr. R. Subbaratnam (NRC - NRR Project Manager, RNP) l I
i I
i