ML20195B382: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_
e
      $ .7          _
: r.    .. .
NOT-01547 0093e X7GJ17-V600 October 25, 1988 Document Control Desk U. S. Nuclear Regulatory Consnission Washington, D. C. 20555 PLANT V0GTLE - UNIT 1, 2 NRC DOCKET 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 SIMULATOR CERTIFICATION Gentlemen:
Enclosed is the simulator certification package for the Plant Yogtle These documents represent the completion of the training simul ator.                                                            The Plant Vogtle initial simulator certification for Units 1 & 2.
certification has been conducted in accordance            "NuclearwithPower the requirements Plant      of 10 CFR Part 55 and Regulatory Guido 1.149, Simulation Facilities For Use In Operator License Examinations".
Sincerely, SK W. G. Hairston III                    l JAE/PDR:llh
 
==Enclosure:==
: 1.      Plan' Vogtle .iimulator Certification c:  (see next page) 8811010549 08102b PDR      ADOCK 05000424  PNU V
j                                                  NJh ,b
 
G. ., D m : r.'
U. 5. Nuclear Regulatory Commission October 25, 1988 Page Two c: Georgia Power Company Mr. P. D. Rice Mr. G. Bockhold, Jr.
GO-NORMS U. S. Nuclear Regulatory Comission Document control Desk Dr. J. N. Grace, Regional Administrator Mr. J. B. Hopkins Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector - Operations, Yogtle b                                                                      i}}

Latest revision as of 23:41, 16 December 2020

Forwards Simulation Facility Certification for Plant Training Simulator,Per 10CFR55 & Reg Guide 1.149, Nuclear Power Plant Simulation Facilities for Use in Operator License Exams
ML20195B382
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/25/1988
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20195B388 List:
References
RTR-REGGD-01.149, RTR-REGGD-1.149 NOT-01547, NOT-1547, NUDOCS 8811010549
Download: ML20195B382 (2)


Text

_

e

$ .7 _

r. .. .

NOT-01547 0093e X7GJ17-V600 October 25, 1988 Document Control Desk U. S. Nuclear Regulatory Consnission Washington, D. C. 20555 PLANT V0GTLE - UNIT 1, 2 NRC DOCKET 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 SIMULATOR CERTIFICATION Gentlemen:

Enclosed is the simulator certification package for the Plant Yogtle These documents represent the completion of the training simul ator. The Plant Vogtle initial simulator certification for Units 1 & 2.

certification has been conducted in accordance "NuclearwithPower the requirements Plant of 10 CFR Part 55 and Regulatory Guido 1.149, Simulation Facilities For Use In Operator License Examinations".

Sincerely, SK W. G. Hairston III l JAE/PDR:llh

Enclosure:

1. Plan' Vogtle .iimulator Certification c: (see next page) 8811010549 08102b PDR ADOCK 05000424 PNU V

j NJh ,b

G. ., D m : r.'

U. 5. Nuclear Regulatory Commission October 25, 1988 Page Two c: Georgia Power Company Mr. P. D. Rice Mr. G. Bockhold, Jr.

GO-NORMS U. S. Nuclear Regulatory Comission Document control Desk Dr. J. N. Grace, Regional Administrator Mr. J. B. Hopkins Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector - Operations, Yogtle b i