Line 30: | Line 30: | ||
: 6. MAIIMU5 DEPENDABLE CAPACITY (GROSS 8W E) : 1098 I l l l | : 6. MAIIMU5 DEPENDABLE CAPACITY (GROSS 8W E) : 1098 I l l l | ||
: 7. MAXIBUS DEPENDABLE CAPACITY (NET NWE): 1051 l i | : 7. MAXIBUS DEPENDABLE CAPACITY (NET NWE): 1051 l i | ||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITERS EDEBER 3 THROLC1 7) SINCE LAST REPORT, GIVE REASONS: | : 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITERS EDEBER 3 THROLC1 7) SINCE LAST REPORT, GIVE REASONS: | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (EET BWE): | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (EET BWE): | ||
Line 39: | Line 38: | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 J.0 | : 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 J.0 | ||
: 14. HOURS GENERATOR ON-LINE 521.9 2,597.0 44,109.8 | : 14. HOURS GENERATOR ON-LINE 521.9 2,597.0 44,109.8 | ||
: 15. UNIT RESERTE SHOTDOWN HOURS 0.0 0.0 0.0 | : 15. UNIT RESERTE SHOTDOWN HOURS 0.0 0.0 0.0 l 16. GROSS THEB5AL ENERGY GEEERATED (MWH) 1,702,910 8,149,370 128,570,442 | ||
l 16. GROSS THEB5AL ENERGY GEEERATED (MWH) 1,702,910 8,149,370 128,570,442 | |||
-.__. - == --- ._. . .. | -.__. - == --- ._. . .. | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 576,770 2,745,600 42,358,700 | : 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 576,770 2,745,600 42,358,700 | ||
: 18. NET ELECTRICAL REERGY GENERATED (BWH) 555,841 2,654,655 40,614,319 | : 18. NET ELECTRICAL REERGY GENERATED (BWH) 555,841 2,654,655 40,614,319 | ||
: 19. UNIT SERVICE FACTOR 72.6 90.2 73.8 | : 19. UNIT SERVICE FACTOR 72.6 90.2 73.8 | ||
: 20. UNIT AVAILABILITY FACTOR 72.6 90.2 73.8 | : 20. UNIT AVAILABILITY FACTOR 72.6 90.2 73.8 | ||
=_ | =_ | ||
: 31. UNIT CAPACITY FACTOR (OSING 3DC NET) 73.6 87.7 64.6 | : 31. UNIT CAPACITY FACTOR (OSING 3DC NET) 73.6 87.7 64.6 | ||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 72.6 86.6 63.8 | : 22. UNIT CAPACITY FACTOR (USING DER NET) 72.6 86.6 63.8 | ||
: 23. UNIT FORCED OUTAGE BATE 27.4 9.8 6.3 | : 23. UNIT FORCED OUTAGE BATE 27.4 9.8 6.3 24 SHUTDOWNS SCHEDULED OVER NEIT 6 505THS (TYPE, DaTE, AND DURATION OF EAC3) : | ||
24 SHUTDOWNS SCHEDULED OVER NEIT 6 505THS (TYPE, DaTE, AND DURATION OF EAC3) : | |||
: 25. IF SHUTDOWs AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUTDOWs AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COM5EBCI AL OPERATION) : FORECAST ACHIEYED IMITIAL CRITICALITY | : 26. UNITS IN TEST STATUS (PRIOR TO COM5EBCI AL OPERATION) : FORECAST ACHIEYED IMITIAL CRITICALITY IIITIAL ELECTRICITY C055ERCIAL OPERATION 8105200 fly | ||
IIITIAL ELECTRICITY | |||
C055ERCIAL OPERATION 8105200 fly | |||
seP R471L3 D.T1 3 L .% M*. | seP R471L3 D.T1 3 L .% M*. | ||
DOCKET us. 50 - 278 DATE SAY 10,1981 COMPLETED BY P4ILADELPHI A ELECTRIC ConPANY W.R.ALDEN E NGIN EE R-IN -CH A RG E 50 CLEAR SECTZON GENERATION DIYISION-NGCLEAD TELEPHONE (215) 841-5022 OPERATING STATUS | DOCKET us. 50 - 278 DATE SAY 10,1981 COMPLETED BY P4ILADELPHI A ELECTRIC ConPANY W.R.ALDEN E NGIN EE R-IN -CH A RG E 50 CLEAR SECTZON GENERATION DIYISION-NGCLEAD TELEPHONE (215) 841-5022 OPERATING STATUS | ||
Line 78: | Line 62: | ||
: 5. DESIGN ELECTRICAL RATIEG (NET 85E) : 1065 l l | : 5. DESIGN ELECTRICAL RATIEG (NET 85E) : 1065 l l | ||
..__. . g g | ..__. . g g | ||
: 6. 5111MU5 DEPENDABLE CAPACITY (GROSS MWE) : 1098 l l | : 6. 5111MU5 DEPENDABLE CAPACITY (GROSS MWE) : 1098 l l i i | ||
i i | |||
: 7. MAIIMUM DEdENDABLE CAPACITY (EET NWE): 1035 l l | : 7. MAIIMUM DEdENDABLE CAPACITY (EET NWE): 1035 l l | ||
== .... | == .... | ||
Line 89: | Line 71: | ||
: 11. HOURS 15 a'EPORTING PERIOD 719 2,879 55,703 | : 11. HOURS 15 a'EPORTING PERIOD 719 2,879 55,703 | ||
: 12. AUMBER OF HOURS REACTGR WAS CRITICAL 0 1,547.7 43,709.9 | : 12. AUMBER OF HOURS REACTGR WAS CRITICAL 0 1,547.7 43,709.9 | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 | : 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 | ||
=. .. | =. .. | ||
Line 97: | Line 78: | ||
== | == | ||
: 16. GROSS THERSAL ENERGY GENERATED (MWH) 0 4,932,216 121,775,165 | : 16. GROSS THERSAL ENERGY GENERATED (MWH) 0 4,932,216 121,775,165 | ||
: 17. G80SS ELECTRICAL EXERGY GENERATED (HW H) 0 1,643,900 39,745,990 l = - | : 17. G80SS ELECTRICAL EXERGY GENERATED (HW H) 0 1,643,900 39,745,990 l = - | ||
( 18. NET ELECTRICAL ENERGY GENERATED (BWH) * -5,875 1,581,143 38,159,786 | |||
( 18. NET ELECTRICAL ENERGY GENERATED (BWH) * -5,875 | |||
1,581,143 38,159,786 | |||
: 19. U$1T SERVICE FACTOR 0.0 53.6 76.4 l 20. UNIT AVAILABILITY FACTOR 0.0 53.6 76.4 1 _. _____.. .. - - | : 19. U$1T SERVICE FACTOR 0.0 53.6 76.4 l 20. UNIT AVAILABILITY FACTOR 0.0 53.6 76.4 1 _. _____.. .. - - | ||
: 21. UNIT CAPACITY FACTOR (USING MDC EET) 0.0 53,1 66.2 | : 21. UNIT CAPACITY FACTOR (USING MDC EET) 0.0 53,1 66.2 | ||
: 22. UNIT CA PACITI FACTOR (USING DER NET) 0.0 51.6 64.3 | : 22. UNIT CA PACITI FACTOR (USING DER NET) 0.0 51.6 64.3 | ||
: 23. UNIT FORCED OUTAGE RATE 0.0 1.1 7.3 | : 23. UNIT FORCED OUTAGE RATE 0.0 1.1 7.3 | ||
: 24. SUUTDOWMS SCHEDULED OVER NLIT 6 MONTHS (!Y PE, DATE, AND DOR ATION OF EACH) : | : 24. SUUTDOWMS SCHEDULED OVER NLIT 6 MONTHS (!Y PE, DATE, AND DOR ATION OF EACH) : | ||
i R EFU ELING/M AINTEN A Ns 'E , 3/06/81, TVEETYTEREE WEEKS l | i R EFU ELING/M AINTEN A Ns 'E , 3/06/81, TVEETYTEREE WEEKS l | ||
l i | l i | ||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIC 2) : FORECAST ACHIEY ED INITIAL CRITICALITY | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIC 2) : FORECAST ACHIEY ED INITIAL CRITICALITY INITIAL ELECTEICITY COM5ERCIAL OPERATION | ||
INITIAL ELECTEICITY | |||
COM5ERCIAL OPERATION | |||
* - NEG ATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY COBBISSION REPORTS. | * - NEG ATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY COBBISSION REPORTS. | ||
AVERAGE DAILY UNIT PCVER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTT05 DMIT 2 DATE HAY 10, 1981 C05PANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE EUCLEAR SECTION GREERATION DIVISION-MUCLEAR TELEPHONE (215) 841-5022 MONTH APRIL 1981 DAY AVERAGE DAILY POWER LEYEL DAT AYERAGE DAILY POWER LEYEL (MU E-NET) (RNR-NET) 1 1075 17 1075 2 1075 18 1076 3 1072 19 1075 4 1079 20 , 1066 5 1075 21 1079 6 1076 22 641 7 1075 23 0 8 1065 24 0 9 1068 25 0 10 1075 26 0 11 1075 27 0 12 1077 28 0 13 1076 29 0 14 1077 30 0 15 1078 16 1076 | |||
AVERAGE DAILY UNIT PCVER LEVEL DOCKET NO. 50 - 277 | |||
UNIT PEACH BOTT05 DMIT 2 DATE HAY 10, 1981 C05PANY PHILADELPHIA ELECTRIC COMPANY | |||
W.M.ALDEN ENGINEER-IN-CHARGE EUCLEAR SECTION GREERATION DIVISION-MUCLEAR TELEPHONE (215) 841-5022 MONTH APRIL 1981 | |||
DAY AVERAGE DAILY POWER LEYEL DAT AYERAGE DAILY POWER LEYEL (MU E-NET) (RNR-NET) 1 1075 17 1075 2 1075 18 1076 3 1072 19 1075 4 1079 20 , 1066 5 1075 21 1079 6 1076 22 641 7 1075 23 0 8 1065 24 0 9 1068 25 0 10 1075 26 0 11 1075 27 0 12 1077 28 0 13 1076 29 0 14 1077 30 0 15 1078 16 1076 | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTON UNIT 3 DATE MAY 10,1981 C05PANY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH APRIL 1981 l DAY AVERAGE DAILY POWER LEVEL DAY AVENLGE DAILY POWER LEVEL (MW E-N P,T) (BVE-NET) 1 0 17 0 2 0 18 0 i | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 | |||
UNIT PEACH BOTTON UNIT 3 DATE MAY 10,1981 C05PANY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 | |||
MONTH APRIL 1981 | |||
l DAY AVERAGE DAILY POWER LEVEL DAY AVENLGE DAILY POWER LEVEL (MW E-N P,T) (BVE-NET) 1 0 17 0 2 0 18 0 i | |||
l 3 0 19 0 l | l 3 0 19 0 l | ||
4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 16 0 | |||
4 0 | |||
e UNIT SBUTDOWNS 3 d' POWER REDUCTIONS DOCKET Mo. 50 - 277 8 UNIT M&RE PEACH BOTToa D&IT 4 | |||
e UNIT SBUTDOWNS 3 d' POWER REDUCTIONS DOCKET Mo. 50 - 277 8 | -- 4 DATE att 10, 1981 APRIL, 1981 CORPLETED BT PHIL&DELPMI& ELECTRIC COBP&BY ' | ||
REPORT BOMTH w.a.ALDEu e | |||
UNIT M&RE PEACH BOTToa D&IT 4 | |||
-- 4 DATE att 10, 1981 | |||
APRIL, 1981 CORPLETED BT PHIL&DELPMI& ELECTRIC COBP&BY ' | |||
REPORT BOMTH | |||
w.a.ALDEu e | |||
EuGIuEER-IN-Cu1BGE NUCIEAR SECTION GFWSB& TION DIVISION-NUCLEAR e | EuGIuEER-IN-Cu1BGE NUCIEAR SECTION GFWSB& TION DIVISION-NUCLEAR e | ||
TELEPHONE (215) 841-5022 _ | TELEPHONE (215) 841-5022 _ | ||
8 1 I I I l BETHOD OF l LICENSEE lSTSTERICO5FOWENTl CAUSE AND CORRECTIVE I ITIPElDURATIOulkEASOutSuuTTING DOWut EVENT l CODE I CODE l ACTION TO CO.l DATE I (1) (HOURS)I (2) l REACTOR (3) l REPORT 8 I (4) I (5) i PREVENT RECURRENCE - | |||
8 1 I I I l BETHOD OF l LICENSEE lSTSTERICO5FOWENTl CAUSE AND CORRECTIVE I ITIPElDURATIOulkEASOutSuuTTING DOWut EVENT l CODE I CODE l ACTION TO CO.l DATE I (1) (HOURS)I (2) l REACTOR (3) l REPORT 8 I (4) I | |||
(5) i PREVENT RECURRENCE - | |||
4 i i i i i i i i i 13 1 810422 l rl 197.1 1 & l 1 l NA l CB { BOTORI l 2B BEACTOR RECIRCULATION PURP MOTOR 8 I I i i i I i I i BEARING r&ILURE. | 4 i i i i i i i i i 13 1 810422 l rl 197.1 1 & l 1 l NA l CB { BOTORI l 2B BEACTOR RECIRCULATION PURP MOTOR 8 I I i i i I i I i BEARING r&ILURE. | ||
I I I - - --- 3 I I I I l t I i 197.1 1 I I I I I i | I I I - - --- 3 I I I I l t I i 197.1 1 I I I I I i | ||
Line 180: | Line 109: | ||
Y - FORCED REASON HETHOD EIMIBIT G - INSTRUCTIONS S - SCHEDULED & - EQUIPRENT FAILURE (EIPLAIN) 1 - B&MUEL FOR PREP &B& TION OF D&TA 8 B - MAINTEuhuCE OR TEST 2 - n&MUAL SCR&a. EuTRY SERETS FOR LICEMSEE C - REFUELING 3 - AUTOS & TIC SCR&B. EVENT REPORT (LER) b - REGULATORI RESTRICTION 4 - OTHER (EIPLAIB) FILE (EU R EG-0161) 4 E - OPERATOR TR AINING + LICENSE EIA51 NATION F - ADMINISTRATIVE (5) 8 G - OPER ATIOu1L ERROR (EIPLAIB) | Y - FORCED REASON HETHOD EIMIBIT G - INSTRUCTIONS S - SCHEDULED & - EQUIPRENT FAILURE (EIPLAIN) 1 - B&MUEL FOR PREP &B& TION OF D&TA 8 B - MAINTEuhuCE OR TEST 2 - n&MUAL SCR&a. EuTRY SERETS FOR LICEMSEE C - REFUELING 3 - AUTOS & TIC SCR&B. EVENT REPORT (LER) b - REGULATORI RESTRICTION 4 - OTHER (EIPLAIB) FILE (EU R EG-0161) 4 E - OPERATOR TR AINING + LICENSE EIA51 NATION F - ADMINISTRATIVE (5) 8 G - OPER ATIOu1L ERROR (EIPLAIB) | ||
H - OtuER (EIPLAIM) IIMIBIT I - S&BE SOURCE i | H - OtuER (EIPLAIM) IIMIBIT I - S&BE SOURCE i | ||
0 | 0 t | ||
t | |||
h $ | h $ | ||
4 i | 4 i | ||
e a | e a | ||
UNIT SHUTDONNS AND PONER REDUCTIONS DOCKET NO. 50 - 278 i ________________ | UNIT SHUTDONNS AND PONER REDUCTIONS DOCKET NO. 50 - 278 i ________________ | ||
, UNIT NABE PE1CH 80T708 UNIT 3 4 | , UNIT NABE PE1CH 80T708 UNIT 3 4 l DATE s&Y 10,1981 g | ||
REPOkT RONTH APRIL, 1981 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY N.M.ALDEN g ENGINEEk'IM-CHARGE NUCLE &B SECTION GENERATION DIVISION-NUCLEAR q-TELEPHONE (215) 841-5022 | |||
l DATE s&Y 10,1981 | |||
N.M.ALDEN g ENGINEEk'IM-CHARGE NUCLE &B SECTION GENERATION DIVISION-NUCLEAR q-TELEPHONE (215) 841-5022 | |||
=-. ___.___ | =-. ___.___ | ||
g l l l l l NETHOD OF l LICENSEE lhYSTEnl COMPONENT l CAUSE AND CORRECTIVE | g l l l l l NETHOD OF l LICENSEE lhYSTEnl COMPONENT l CAUSE AND CORRECTIVE | ||
[ l TYPE lDUMaTIONlkEASONl SHUTTING DONNl EVENT l CODE l CODE l ACTION TO NO.! DATE l (1)l (HOURS)l (2) l REACTOR (3) l REPORT 4 l (4) l (5) l PREVENT RECURRENCE q l l l l l l l l l b i d10401 l S l 719.0 l C l 1 l Na l RC l FUELII l CONTINUING REFUELING OUTAGE. g i l ! ----- l l t I i I l l l 719.0 l l l l l l 4 | [ l TYPE lDUMaTIONlkEASONl SHUTTING DONNl EVENT l CODE l CODE l ACTION TO NO.! DATE l (1)l (HOURS)l (2) l REACTOR (3) l REPORT 4 l (4) l (5) l PREVENT RECURRENCE q l l l l l l l l l b i d10401 l S l 719.0 l C l 1 l Na l RC l FUELII l CONTINUING REFUELING OUTAGE. g i l ! ----- l l t I i I l l l 719.0 l l l l l l 4 | ||
(1) (2) (3) (4) , | (1) (2) (3) (4) , | ||
j F - FOGCLD REASON METHOD EIMIBIT G - INSTRUCTIONS 5 - SCt!EDULED A - EQUIP 5ENT FAILUBE (EX PL AIN) 1 - BANUAL FOR PREP &R& TION OF DAT6 g B - n&INTENANCE OR TEST 2 - M&NUAL SCkAR. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTON& TIC SCR&B. EVENT REPORT (LFt) | j F - FOGCLD REASON METHOD EIMIBIT G - INSTRUCTIONS 5 - SCt!EDULED A - EQUIP 5ENT FAILUBE (EX PL AIN) 1 - BANUAL FOR PREP &R& TION OF DAT6 g B - n&INTENANCE OR TEST 2 - M&NUAL SCkAR. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTON& TIC SCR&B. EVENT REPORT (LFt) | ||
Line 208: | Line 125: | ||
E - OPERATOR TRAINING | E - OPERATOR TRAINING | ||
* LICENSE EIANINATION F - ADMINISTRATIVE (5) | * LICENSE EIANINATION F - ADMINISTRATIVE (5) | ||
G - OPEk&TIONAL EkROR (EXPLAIN) g H - OTHER (EIPLAIN) EIHIBIT I - Sant SOURCE | G - OPEk&TIONAL EkROR (EXPLAIN) g H - OTHER (EIPLAIN) EIHIBIT I - Sant SOURCE | ||
, 4 I | , 4 I | ||
ix v . - !k. 'o Attachment to Monthly Operating ut+ '" | |||
ix v . - !k. 'o | |||
Attachment to Monthly Operating ut+ '" | |||
April, 1981 REFUELING IN}TRMATION | April, 1981 REFUELING IN}TRMATION | ||
: 1. Name of facility: | : 1. Name of facility: | ||
Peach Botton Unit 2 | Peach Botton Unit 2 | ||
Line 249: | Line 155: | ||
September, 1990 l | September, 1990 l | ||
l 00ROR8iNA!. | l 00ROR8iNA!. | ||
* | * | ||
* 15cke t. No , i'v -2 1 | * 15cke t. No , i'v -2 1 Attachm:nt to Monthly Operatin % .cu t For April, 1%il 1 . | ||
Attachm:nt to | |||
Monthly Operatin % .cu t For April, 1%il 1 . | |||
s REFUELDIG DUMMATION t | s REFUELDIG DUMMATION t | ||
i 1. Name,of facility: | i 1. Name,of facility: | ||
Line 270: | Line 170: | ||
Modifications to reactor core operating limits aro expected. | Modifications to reactor core operating limits aro expected. | ||
1 5 Scheduled date(s) for submitting proposed licensing actica and supporting information: | 1 5 Scheduled date(s) for submitting proposed licensing actica and supporting information: | ||
Submitted | Submitted | ||
! March 30, 1981 | ! March 30, 1981 | ||
: 6. Important licensing considerations associated with refueling, e.g., | : 6. Important licensing considerations associated with refueling, e.g., | ||
new or different fuel design or supplior, unroviewed desi,gn or performance analycia methods, significant changes in fuel design, new cperating precedures: | new or different fuel design or supplior, unroviewed desi,gn or performance analycia methods, significant changes in fuel design, new cperating precedures: | ||
Line 282: | Line 180: | ||
9 The projected date of the last refueling that can be discharssd to the spent fuel pool assuming the ) resent licensed capacity: | 9 The projected date of the last refueling that can be discharssd to the spent fuel pool assuming the ) resent licensed capacity: | ||
September, 1991 1 | September, 1991 1 | ||
PEACH BOTTOM ATOMIC POWER STATION NARRATIVE | PEACH BOTTOM ATOMIC POWER STATION NARRATIVE | ||
Line 292: | Line 186: | ||
OF OPERATING EXPERIENCES APRIL 1981 Unit 2 The Unit operated at full power until early April 20 when an orderly shutdown was begun as a result of two Core Spray pumps failing to meet the Inservice Inspection operability criteria during a scheduled surveillance test. The Unit was returned to full power later on the same day following recalibration of tne Core Spray punp flow indicator and retesting of the pumps. | OF OPERATING EXPERIENCES APRIL 1981 Unit 2 The Unit operated at full power until early April 20 when an orderly shutdown was begun as a result of two Core Spray pumps failing to meet the Inservice Inspection operability criteria during a scheduled surveillance test. The Unit was returned to full power later on the same day following recalibration of tne Core Spray punp flow indicator and retesting of the pumps. | ||
Early on April 22, load was reduced to 800 MWe to verify a load relationship with a high " combustibles" indication on the 2A phase main transformer. The Unit was removed from service later in the day following the failure of the 28 recirculation pump seal. Subsequently, the 2B recirculation pump motor bearing was found to be badly damaged. The unit remains shutdown to effect repairs to the 2B recirculation pump motor. | Early on April 22, load was reduced to 800 MWe to verify a load relationship with a high " combustibles" indication on the 2A phase main transformer. The Unit was removed from service later in the day following the failure of the 28 recirculation pump seal. Subsequently, the 2B recirculation pump motor bearing was found to be badly damaged. The unit remains shutdown to effect repairs to the 2B recirculation pump motor. | ||
Unit 3 The Unit remains shutdown'to accommodate refueling, modifi-cations and maintenance work. The Torus has been drained, decontaminated and structural modifications are in progress. | Unit 3 The Unit remains shutdown'to accommodate refueling, modifi-cations and maintenance work. The Torus has been drained, decontaminated and structural modifications are in progress. | ||
During blocking for Emergency Core Cooling System (EECS) sensor replacement, a false ECCS initiation signal was received which led to draining of 160,000 gallons of water from the Unit 3 condensate storage tank into the Unit 3 High Pressure Coolant Injection (HPCI) pump room via the pump suction line and the disassembled pump. Flooding of this room also caused a spurious initiation of the CO, fire protection for the room. | During blocking for Emergency Core Cooling System (EECS) sensor replacement, a false ECCS initiation signal was received which led to draining of 160,000 gallons of water from the Unit 3 condensate storage tank into the Unit 3 High Pressure Coolant Injection (HPCI) pump room via the pump suction line and the disassembled pump. Flooding of this room also caused a spurious initiation of the CO, fire protection for the room. | ||
There were no resultant personnel exposures or injuries. | There were no resultant personnel exposures or injuries. | ||
The Feedwater Spargers have been removed and the machining of the reactor vessel feedwater nozzles has begun. Changeout of Control Rod drives continues.}} | The Feedwater Spargers have been removed and the machining of the reactor vessel feedwater nozzles has begun. Changeout of Control Rod drives continues.}} |
Revision as of 04:24, 31 January 2020
ML19345H368 | |
Person / Time | |
---|---|
Site: | Peach Bottom ![]() |
Issue date: | 05/10/1981 |
From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
To: | |
Shared Package | |
ML19345H366 | List: |
References | |
NUDOCS 8105200214 | |
Download: ML19345H368 (9) | |
Text
. .
OPERATIN3 DATA REPORT DOCK ET 50. 50 - 277 DATE MAY 10, 1981 O COBPLETED SY PHILADELPHIA ELECTRIC COMPANY W.R.ALDEN EEGIEERB-IN-CHARGE NGCLEAR SBCTION GENERATION DITISION-NUCLEAR TELEPHOWE (215) 841-5022 OPER% TING STATUS
- 1. UNIT NABE: PEACH BOTTOM osIT 2 1 BOTES: TEIS DEIT EXPERIENCID l
,. .. ._. .. ; g
- 2. REPORTING PERIOD: SPRIL, 1981 l ONE BAJOR OWTAGE. l
. . . . . .____. g g
- 3. LICENSED THERMAL POWER (suT) : 3293 l l
.___ . - g g 4 NAMEPLATE RATING (GROSS EVE) : 1152 1 I
. ..___... __ g l
- 5. DESIGN ELECTRICAL RATING (EET REE) : 1065 l 1
________. g ;
- 6. MAIIMU5 DEPENDABLE CAPACITY (GROSS 8W E) : 1098 I l l l
- 7. MAXIBUS DEPENDABLE CAPACITY (NET NWE): 1051 l i
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITERS EDEBER 3 THROLC1 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (EET BWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS 80ETH YB-TO-DAT3 CU50LATITE
- 11. HOURS IN REPORTING PERIOD 719 2,879 59,807
- 12. NUM*ER OF HOURS REACTOR W AS CRITICAL 522.7 2,640.1 45,192.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 J.0
- 14. HOURS GENERATOR ON-LINE 521.9 2,597.0 44,109.8
- 15. UNIT RESERTE SHOTDOWN HOURS 0.0 0.0 0.0 l 16. GROSS THEB5AL ENERGY GEEERATED (MWH) 1,702,910 8,149,370 128,570,442
-.__. - == --- ._. . ..
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 576,770 2,745,600 42,358,700
- 18. NET ELECTRICAL REERGY GENERATED (BWH) 555,841 2,654,655 40,614,319
- 19. UNIT SERVICE FACTOR 72.6 90.2 73.8
- 20. UNIT AVAILABILITY FACTOR 72.6 90.2 73.8
=_
- 31. UNIT CAPACITY FACTOR (OSING 3DC NET) 73.6 87.7 64.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 72.6 86.6 63.8
- 23. UNIT FORCED OUTAGE BATE 27.4 9.8 6.3 24 SHUTDOWNS SCHEDULED OVER NEIT 6 505THS (TYPE, DaTE, AND DURATION OF EAC3) :
- 25. IF SHUTDOWs AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COM5EBCI AL OPERATION) : FORECAST ACHIEYED IMITIAL CRITICALITY IIITIAL ELECTRICITY C055ERCIAL OPERATION 8105200 fly
seP R471L3 D.T1 3 L .% M*.
DOCKET us. 50 - 278 DATE SAY 10,1981 COMPLETED BY P4ILADELPHI A ELECTRIC ConPANY W.R.ALDEN E NGIN EE R-IN -CH A RG E 50 CLEAR SECTZON GENERATION DIYISION-NGCLEAD TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT MAME: PEACH BOTT08 DEIT 3 l EOTES: TMIS UNIf IS DOWB FOR l
..... . . .. . .. g g
..... __. .. ._ g g
- 3. LICENSED THERMAL POWER (HWT): 3293 l l
_ _ _ . - . _ . . . . . _ _ _ g g 4 NAMEPLATE RATING (GROSS NWE): 1152 l l
. .__. __ g i
- 5. DESIGN ELECTRICAL RATIEG (NET 85E) : 1065 l l
..__. . g g
- 6. 5111MU5 DEPENDABLE CAPACITY (GROSS MWE) : 1098 l l i i
- 7. MAIIMUM DEdENDABLE CAPACITY (EET NWE): 1035 l l
== ....
S. IF CHANGES OCCUR IN CAPACITY RATINGS (ITIES 50RBER 3 TEBOUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (EET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CURD;ATIVS
- 11. HOURS 15 a'EPORTING PERIOD 719 2,879 55,703
- 12. AUMBER OF HOURS REACTGR WAS CRITICAL 0 1,547.7 43,709.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
=. ..
14 HOURS GENERATOR OB-LINE 0.0 1,541.8 42,566.6
....___...__ =-
- 15. OMIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
==
- 16. GROSS THERSAL ENERGY GENERATED (MWH) 0 4,932,216 121,775,165
- 17. G80SS ELECTRICAL EXERGY GENERATED (HW H) 0 1,643,900 39,745,990 l = -
( 18. NET ELECTRICAL ENERGY GENERATED (BWH) * -5,875 1,581,143 38,159,786
- 19. U$1T SERVICE FACTOR 0.0 53.6 76.4 l 20. UNIT AVAILABILITY FACTOR 0.0 53.6 76.4 1 _. _____.. .. - -
- 21. UNIT CAPACITY FACTOR (USING MDC EET) 0.0 53,1 66.2
- 22. UNIT CA PACITI FACTOR (USING DER NET) 0.0 51.6 64.3
- 23. UNIT FORCED OUTAGE RATE 0.0 1.1 7.3
- 24. SUUTDOWMS SCHEDULED OVER NLIT 6 MONTHS (!Y PE, DATE, AND DOR ATION OF EACH) :
i R EFU ELING/M AINTEN A Ns 'E , 3/06/81, TVEETYTEREE WEEKS l
l i
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIC 2) : FORECAST ACHIEY ED INITIAL CRITICALITY INITIAL ELECTEICITY COM5ERCIAL OPERATION
- - NEG ATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY COBBISSION REPORTS.
AVERAGE DAILY UNIT PCVER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTT05 DMIT 2 DATE HAY 10, 1981 C05PANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE EUCLEAR SECTION GREERATION DIVISION-MUCLEAR TELEPHONE (215) 841-5022 MONTH APRIL 1981 DAY AVERAGE DAILY POWER LEYEL DAT AYERAGE DAILY POWER LEYEL (MU E-NET) (RNR-NET) 1 1075 17 1075 2 1075 18 1076 3 1072 19 1075 4 1079 20 , 1066 5 1075 21 1079 6 1076 22 641 7 1075 23 0 8 1065 24 0 9 1068 25 0 10 1075 26 0 11 1075 27 0 12 1077 28 0 13 1076 29 0 14 1077 30 0 15 1078 16 1076
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTON UNIT 3 DATE MAY 10,1981 C05PANY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH APRIL 1981 l DAY AVERAGE DAILY POWER LEVEL DAY AVENLGE DAILY POWER LEVEL (MW E-N P,T) (BVE-NET) 1 0 17 0 2 0 18 0 i
l 3 0 19 0 l
4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 16 0
e UNIT SBUTDOWNS 3 d' POWER REDUCTIONS DOCKET Mo. 50 - 277 8 UNIT M&RE PEACH BOTToa D&IT 4
-- 4 DATE att 10, 1981 APRIL, 1981 CORPLETED BT PHIL&DELPMI& ELECTRIC COBP&BY '
REPORT BOMTH w.a.ALDEu e
EuGIuEER-IN-Cu1BGE NUCIEAR SECTION GFWSB& TION DIVISION-NUCLEAR e
TELEPHONE (215) 841-5022 _
8 1 I I I l BETHOD OF l LICENSEE lSTSTERICO5FOWENTl CAUSE AND CORRECTIVE I ITIPElDURATIOulkEASOutSuuTTING DOWut EVENT l CODE I CODE l ACTION TO CO.l DATE I (1) (HOURS)I (2) l REACTOR (3) l REPORT 8 I (4) I (5) i PREVENT RECURRENCE -
4 i i i i i i i i i 13 1 810422 l rl 197.1 1 & l 1 l NA l CB { BOTORI l 2B BEACTOR RECIRCULATION PURP MOTOR 8 I I i i i I i I i BEARING r&ILURE.
I I I - - --- 3 I I I I l t I i 197.1 1 I I I I I i
4 4
(1) (2) (3) (4)
Y - FORCED REASON HETHOD EIMIBIT G - INSTRUCTIONS S - SCHEDULED & - EQUIPRENT FAILURE (EIPLAIN) 1 - B&MUEL FOR PREP &B& TION OF D&TA 8 B - MAINTEuhuCE OR TEST 2 - n&MUAL SCR&a. EuTRY SERETS FOR LICEMSEE C - REFUELING 3 - AUTOS & TIC SCR&B. EVENT REPORT (LER) b - REGULATORI RESTRICTION 4 - OTHER (EIPLAIB) FILE (EU R EG-0161) 4 E - OPERATOR TR AINING + LICENSE EIA51 NATION F - ADMINISTRATIVE (5) 8 G - OPER ATIOu1L ERROR (EIPLAIB)
H - OtuER (EIPLAIM) IIMIBIT I - S&BE SOURCE i
0 t
h $
4 i
e a
UNIT SHUTDONNS AND PONER REDUCTIONS DOCKET NO. 50 - 278 i ________________
, UNIT NABE PE1CH 80T708 UNIT 3 4 l DATE s&Y 10,1981 g
REPOkT RONTH APRIL, 1981 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY N.M.ALDEN g ENGINEEk'IM-CHARGE NUCLE &B SECTION GENERATION DIVISION-NUCLEAR q-TELEPHONE (215) 841-5022
=-. ___.___
g l l l l l NETHOD OF l LICENSEE lhYSTEnl COMPONENT l CAUSE AND CORRECTIVE
[ l TYPE lDUMaTIONlkEASONl SHUTTING DONNl EVENT l CODE l CODE l ACTION TO NO.! DATE l (1)l (HOURS)l (2) l REACTOR (3) l REPORT 4 l (4) l (5) l PREVENT RECURRENCE q l l l l l l l l l b i d10401 l S l 719.0 l C l 1 l Na l RC l FUELII l CONTINUING REFUELING OUTAGE. g i l ! ----- l l t I i I l l l 719.0 l l l l l l 4
(1) (2) (3) (4) ,
j F - FOGCLD REASON METHOD EIMIBIT G - INSTRUCTIONS 5 - SCt!EDULED A - EQUIP 5ENT FAILUBE (EX PL AIN) 1 - BANUAL FOR PREP &R& TION OF DAT6 g B - n&INTENANCE OR TEST 2 - M&NUAL SCkAR. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTON& TIC SCR&B. EVENT REPORT (LFt)
D - BEGULatokY MESTRICTION 4 - OTHER (EIPLAIN) FILE (N UR EG-0161)
E - OPERATOR TRAINING
- LICENSE EIANINATION F - ADMINISTRATIVE (5)
G - OPEk&TIONAL EkROR (EXPLAIN) g H - OTHER (EIPLAIN) EIHIBIT I - Sant SOURCE
, 4 I
ix v . - !k. 'o Attachment to Monthly Operating ut+ '"
April, 1981 REFUELING IN}TRMATION
- 1. Name of facility:
Peach Botton Unit 2
- 2. SA*duled date for next rettioling shutdown:
January 2, 1982
- . Scheduled date for restart following refueling
February 13, 1982
- h. Will refueling or resumption of operation thereafter require a techn*,=1 specification chalige or other license amendment?
Yes.
If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Mo'tifications to reactor core operating lir.its are expected.
5 scheduled date(s) for aubmitting proposed licensing action and '
.suppgrting information:
l November 13, 1981
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, signifloar.t changes in fuel design, new operating procedures None expected.
7 The number of fuel assemblies (a) in the core and (b) in the spent j
fuel storage pools 1
a Core - 7% Fuel Assemblies b Fuel Pool - 910 Fuel Assemblies l 8. h prisent licensed spent fuel pool storage capacity and the size I
of any increase in licensed storage ospecity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool stcrage capacity has been relicensed for 2816 fuel assemblies.
9 The projected date of the last refueling that aan be discharged to the spent fuel pool asstering the present licensed capacity.
September, 1990 l
l 00ROR8iNA!.
- 15cke t. No , i'v -2 1 Attachm:nt to Monthly Operatin % .cu t For April, 1%il 1 .
s REFUELDIG DUMMATION t
i 1. Name,of facility:
Peach Bottom Unit 3
- 2. Scheduled date for next refueling shutdown:
Refueling Began March 6, 1981 3 Scheduled date for restart following refueling:
August 14, 1981 L h. Vill refueling or resumption of operation thereafter require a L technical specification charage or other license amendment?
I .
I Yes. ,
p If answer is yes, what, in L.;eneral, will these be?
L L Technical specification chan6es to ac c=modate rsload fuel.
Modifications to reactor core operating limits aro expected.
1 5 Scheduled date(s) for submitting proposed licensing actica and supporting information:
Submitted
! March 30, 1981
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplior, unroviewed desi,gn or performance analycia methods, significant changes in fuel design, new cperating precedures:
None expected.
7 The number of fuel assemblies (a) in the core a=d (b) in the spent fuel storage pools (a) Core - 76' jaal Assemblies (b) Fuel Pocl - 712 Irradiated hel Assemblies
- 8. The present licansed apont. fuel pool storage capacity and the size l of any increase in licensed storage capacity that has been requested or is planned, in nu=ber of fael assemblies:
The spent fuel pool stora6e capacity has been relicensed for 2816 fuel assem R s.
9 The projected date of the last refueling that can be discharssd to the spent fuel pool assuming the ) resent licensed capacity:
September, 1991 1
PEACH BOTTOM ATOMIC POWER STATION NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES APRIL 1981 Unit 2 The Unit operated at full power until early April 20 when an orderly shutdown was begun as a result of two Core Spray pumps failing to meet the Inservice Inspection operability criteria during a scheduled surveillance test. The Unit was returned to full power later on the same day following recalibration of tne Core Spray punp flow indicator and retesting of the pumps.
Early on April 22, load was reduced to 800 MWe to verify a load relationship with a high " combustibles" indication on the 2A phase main transformer. The Unit was removed from service later in the day following the failure of the 28 recirculation pump seal. Subsequently, the 2B recirculation pump motor bearing was found to be badly damaged. The unit remains shutdown to effect repairs to the 2B recirculation pump motor.
Unit 3 The Unit remains shutdown'to accommodate refueling, modifi-cations and maintenance work. The Torus has been drained, decontaminated and structural modifications are in progress.
During blocking for Emergency Core Cooling System (EECS) sensor replacement, a false ECCS initiation signal was received which led to draining of 160,000 gallons of water from the Unit 3 condensate storage tank into the Unit 3 High Pressure Coolant Injection (HPCI) pump room via the pump suction line and the disassembled pump. Flooding of this room also caused a spurious initiation of the CO, fire protection for the room.
There were no resultant personnel exposures or injuries.
The Feedwater Spargers have been removed and the machining of the reactor vessel feedwater nozzles has begun. Changeout of Control Rod drives continues.