l l e PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

JULY 1996 UNIT 2 i

Unit 2 began the month of July at 72% power and averaged 67% power for the month. The  !

majority of the Megawatt losses were a result of the Unit coastdown. In addition, there were minimal losses due to leaking valves.

Unit 2 net generation for July was 506,499 MWH.

UNIT 3 Unit 3 began the month of July at 100% power. Unit 3 Megawatt losses were minimal during the month. The losses included an unplanned load drop on 7/16/96 for waterbox cleaning. The load drop terminated on 7/17/96. The Unit remained at 100% power for the rest of the month.

l Unit 3 net generation for July was 820,236 MWH.

l l

l 9608200056 960808

PDR ADOCK 05000277 l R PDR l

~._ .._ . - - . _ . _ _ _ __ . _ . . . _ .

l I

. Attachment to ,

Monthly Operating  ;

Report for July 1996 l UNIT 2 REFUELING INFORMATlON  !

1. Name of facility:

l Peach Bottom Unit 2 l i

l

2. Scl,eduled date for next refueling shutdown: ,

Reload 11 scheduled for September 13,1996.

3. Scheduled date for restart following refueling:

! Restart following refueling forecast for October 12,1996.

l t

, i i

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?  ;

i Yes. t c  :

! t if answer is yes, what, in general, will these be?  ;

1,10CFR50 Appendix J, Option B

2. Increase MCPR Value ,
5. Scheduled date(s) for submitting proposed licensing action and supporting information: j ltems 1 and 2 have been submitted for review and approval. NRC approval has been  !

received for item .1.

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or ,

! supplier, unreviewed design or performance analysis methods, significant changes in fuel design, .

new operating procedures:

GE-13 Fuel Product Line will be utilized requiring a Tech Spec amendment.

7. The number of fool assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core -764 Fuel Assemblies (b) Fuel Pool-2436 Fuel Assemblies,52 Fuel Rods l Note that an additional 144 new fuel assemblies had been received but not yet placed into i the spent fuel storage pool as of the end of July.

)

)

,- v --,.. ..m-- .

Dock;t No. 50-277 Attachment to l Monthly Operating i

Report for July 1996 l Page 2 l I

l l

UNIT 2 REFUELING INFORMATION (Continued)  ;

l I

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed J storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been reticensed for 3819 fuel assemblies.

i l

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the j present capacity-l September 2002 without full core offload capability.  !

I i

September 1998 with full core offload capability.

I l

l l

1 i

i i

i

1

~

. Docket No. 50-278 Attachment to Monthly Operating ,

Report for July 1996

]

i UNIT 3 REFUELING INFORMATION

1. Name of facility: l l

Peach Bottom Unit 3 I

I

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 12,1997

3. Scheduled date for restart following refueling Restart following refueling scheduled for October 11,1997
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? l l N/A l

If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

l

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: 1 N/A
7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core-764 Fuel Assemblies (b) Fuel Pool- 2485 Fuel Assemblies,16 Fuel Rods

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed i

storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

i

l

,, DockGt No. 50-278 Attachment to j Monthly Operating Report for July 1996 Page 2 l

UNIT 3 REFUELING INFORMATION (Continued)

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core omoad capability.

September 1999 with full core omoad capability.

i f

I t

5 l

AVERAGE DAILY POWER LEVEL '

DOCKET NO. 50-277 .

UNIT PEACH BOTTOM UNIT 2 DATE AUGUST 13,1996 -

COMPANY PECO ENERGY COMPANY .

L P. HYDRICK

  • BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION -

TELEPHONE (717)456-4383 MONTH JULY,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL (MWE-NET) (MWE-NET) 1 745 17 662 2 737 18 654 3 732 19 655 4 732 20 660 i 5 728 21 660 6 722 22 656 7 714 23 652 8 718 24 653 9 703 25 652 10 703 26 643 11 698 27 643 12 693 28 639 13 691 29 635 14 693 30 635 15 687 31 630 16 679

~

OPERATING DATA REPORT -

DOCKET NO. 50- 277 ,

DATE AUGUST 13,1996 COMPLETED BY PECO ENERGY COMPANY ',

L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION .,

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 OPERATING STATUS

1. UNIT NAME- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _P_EA_ C_H_ B_ O_ T_T_O_M_U_N_IT_ 2_

NOTES:

2. REPORTING PERIOD , , , _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ JULY,1_996
3. LICENSED THERMAL POWER (MWT). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _3458
4. NAMEPLATE RATING (GROSS MWE): ______________________________1_221
5. DESIGN ELECTRICAL RATING (NET MWE): __________________________11_19 i
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): _____________________1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _______________________1_093_
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,111 193,511
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,111.0 127,706.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 744.0 5,111.0 123,712.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,713,389 15,711,557 373,287,600
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 531,300 5,124,800 122,664,590
18. NET ELECTRICAL ENERGY GENERATED (MWH) 506,499 4,954,626 117,760,521 PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED) ,

DOCKET NO. SC- 277 DATE AUGUST 13,1996 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 % 100.0 % 63.9 %
20. UNIT AVAILABILITY FACTOR 100.0 % 100.0 % 63.3 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 62.3 % 88.7 % 57.6 %
22. UNIT CAPACITY FACTOR (USING DER NET) 80.8 % 86.6 % 56.8 %
23. UNIT FORCED OUTAGE RATE .0 % .0 % 11.8 %
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Refuelmg outage schedule to begin 9/13/96, Durahon 29 days

25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 i

PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 -277 -

UNIT NAME PEACH BOTTOM UNIT 2 DATE AUGUST 13,1996

  • COMPLETED BY PECO ENERGY COMPANY
  • L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION
  • PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH JULY,1996 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE TOTAL HOURS (1) (2) (3) (4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2- MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELMG 3- AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERA iOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)

._. _ - - - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ - .. . ______ _ ___- - ~____ - __ - - .- . .. - _ _.

AVERAGE DAILY POWER LEVEL

  • DOCKET NO. 50-278 .

UNIT PEACH BOTTOM UNIT 3 i DATE AUGUST 13,1996 -

COMPANY PECO ENERGY COMPANY -

L P. HYDRICK

  • BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 MONTH JULY,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1104 17 1010 2 1108 18 1107 3 1108 19 1104 4 1108 20 1109 5 1103 21 1108 6 1106 22 1108 7 1105 23 1108 8 1108 24 1114 9 1097 25. 1111 10 1101 26 1111 11 1097 27 1115 12 1100 28 1111 13 1098 29 1111 14 1100 30 1111 15 1098 31 1111 16 1086

- - _ _ - - - _ _ - _ _ - _ _ - - . _ _ _ _ . . . . _ _ _ - . _ _ - . _ _ . - . - .---.- .- _ _ _ _ _ _ . _ _ _ - _ _ _ . _ _ = - _._ .. . _,_

.------------------ws ap_ s m_ e _ s,,-- - - - - -,- - - - - - - - , - - - - - - - - - - - - ----- - - - - - -- , -- - - - - - - - - - - - - - - - . - - - - - - - -- - - - - - - , - - - - - - - - , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - , . - - - - - - - ~ ~ - - - - - - - -

OPERATING DATA REPORT

  • DOCKET NO. 50- 278 ,

DATE AUGUST 13,1996

  • COMPLETED BY PECO ENERGY COMPANY ,

L P. HYDRICK i BUSINESS SERVICES SITE SUPPORT DMSION ,

PEACH BOTTOM ATOMIC POWER STATION

, TELEPHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME: - - ------ --------- -- ----------------- PEACH BOTTOM ----------- UNIT 3 S:
2. REPOPTING PERIOD: ,_____ __ ___ _____________ __ _ _ _ _ _ _ _ _ _ JUL_Y 1_996 t
3. UCENSED THERMAL POWER (MWT). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _3458
4. NAMEPLATE RATING (GROSS MWE): _______ _ _________ _ _ , _ , _ _ _ _ _ _ _ _1_221,
5. DESIGN ELECTRICAL RATING (NET MWE): ____ __ ____________________1119
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ____ __ _______________1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE). ,_______ _______________1_093
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THis MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,111 189,407
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,022.1 126,309.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 ,
14. HOURS GENERATOR ON-UNE 744.0 4,954.0 122,762.2 ,

l

15. UNIT RESERVE SHUTDO'WN HOURS 0.0 0.0 0.0 ,
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,561,030 16,724,773 366,411,231
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 845,300 5.523,900 120,143,332
18. NET ELECTRICAL ENERGY GENERATED (MWH) 820,236 5,367,609 115.381,461 I

PAGE 10F 2 ,

OPERATING DATA REPORT (CONTINUED) ,

DOCKET NO. 50 - 278 DATE AUGUST 13,1996 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERV!CE FACTOR 100.0 % 96.9 % 648 %
20. UNIT AVAILABILITY FACTOR 100.0 % 96.9 % 64.8 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.9 % 96.1 % 58.6 %
22. UNIT CAPACITY FACTOR (USING DER NET) 98.5 % 93.9 % 57.0 %
23. UNIT FORCED OUTAGE RATE .0 % 3.1 % 10.8 % .
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP;
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICAUTY 08/07/74 INITIAL ELECTRICITY 0901/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 OF 2

. UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NO. 50-278 .

UNIT NAME PEACH BOTTOM UNIT 3 -

DATE AUGUST 14,1996 COMPLETED BY PECO ENERGY COMPANY -

L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSiON

  • PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH JULY,1996 TELEPHONE (717)456-4383 METHOD OF UCENSEE SYSTEM ~ COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE- ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE

- 17 960716 S 5.0 B 4 HC X)D000( Clooned A1/A2Watertmos Reactor not shut down TOTAL HOURS 5.0 l

t i

1 (1) (2) (3) (4)

F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2- MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C - REFUEUNG 3- AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATIVE (5)

G- OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)

. _ - . _ . - _ . - _ _ - , _ - _ - , -- . - _ _ . _ - _ . _ - . _ -_. . _ - - - - _ - . _ _ -