l l e PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
JULY 1996 UNIT 2 i
Unit 2 began the month of July at 72% power and averaged 67% power for the month. The !
majority of the Megawatt losses were a result of the Unit coastdown. In addition, there were minimal losses due to leaking valves.
Unit 2 net generation for July was 506,499 MWH.
UNIT 3 Unit 3 began the month of July at 100% power. Unit 3 Megawatt losses were minimal during the month. The losses included an unplanned load drop on 7/16/96 for waterbox cleaning. The load drop terminated on 7/17/96. The Unit remained at 100% power for the rest of the month.
l Unit 3 net generation for July was 820,236 MWH.
l l
l 9608200056 960808
~._ .._ . - - . _ . _ _ _ __ . _ . . . _ .
l I
. Attachment to ,
Monthly Operating ;
Report for July 1996 l UNIT 2 REFUELING INFORMATlON !
- 1. Name of facility:
l Peach Bottom Unit 2 l i
l
- 2. Scl,eduled date for next refueling shutdown: ,
Reload 11 scheduled for September 13,1996.
- 3. Scheduled date for restart following refueling:
! Restart following refueling forecast for October 12,1996.
l t
, i i
- 4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment? ;
i Yes. t c :
! t if answer is yes, what, in general, will these be? ;
1,10CFR50 Appendix J, Option B
- 2. Increase MCPR Value ,
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: j ltems 1 and 2 have been submitted for review and approval. NRC approval has been !
received for item .1.
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or ,
! supplier, unreviewed design or performance analysis methods, significant changes in fuel design, .
new operating procedures:
GE-13 Fuel Product Line will be utilized requiring a Tech Spec amendment.
- 7. The number of fool assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core -764 Fuel Assemblies (b) Fuel Pool-2436 Fuel Assemblies,52 Fuel Rods l Note that an additional 144 new fuel assemblies had been received but not yet placed into i the spent fuel storage pool as of the end of July.
)
)
,- v --,.. ..m-- .
Dock;t No. 50-277 Attachment to l Monthly Operating i
Report for July 1996 l Page 2 l I
l l
UNIT 2 REFUELING INFORMATION (Continued) ;
l I
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed J storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been reticensed for 3819 fuel assemblies.
i l
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the j present capacity-l September 2002 without full core offload capability. !
I i
September 1998 with full core offload capability.
I l
l l
1 i
i i
i
1
~
. Docket No. 50-278 Attachment to Monthly Operating ,
Report for July 1996
]
i UNIT 3 REFUELING INFORMATION
- 1. Name of facility: l l
Peach Bottom Unit 3 I
I
- 2. Scheduled date for next refueling shutdown:
Reload 11 scheduled for September 12,1997
- 3. Scheduled date for restart following refueling Restart following refueling scheduled for October 11,1997
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? l l N/A l
If answer is yes, what, in general, will these be?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
l
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: 1 N/A
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core-764 Fuel Assemblies (b) Fuel Pool- 2485 Fuel Assemblies,16 Fuel Rods
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed i
storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
i
l
,, DockGt No. 50-278 Attachment to j Monthly Operating Report for July 1996 Page 2 l
UNIT 3 REFUELING INFORMATION (Continued)
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core omoad capability.
September 1999 with full core omoad capability.
i f
I t
5 l
AVERAGE DAILY POWER LEVEL '
DOCKET NO. 50-277 .
UNIT PEACH BOTTOM UNIT 2 DATE AUGUST 13,1996 -
COMPANY PECO ENERGY COMPANY .
L P. HYDRICK
- BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION -
TELEPHONE (717)456-4383 MONTH JULY,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL (MWE-NET) (MWE-NET) 1 745 17 662 2 737 18 654 3 732 19 655 4 732 20 660 i 5 728 21 660 6 722 22 656 7 714 23 652 8 718 24 653 9 703 25 652 10 703 26 643 11 698 27 643 12 693 28 639 13 691 29 635 14 693 30 635 15 687 31 630 16 679
~
OPERATING DATA REPORT -
DOCKET NO. 50- 277 ,
DATE AUGUST 13,1996 COMPLETED BY PECO ENERGY COMPANY ',
L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION .,
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 OPERATING STATUS
- 1. UNIT NAME- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _P_EA_ C_H_ B_ O_ T_T_O_M_U_N_IT_ 2_
NOTES:
- 2. REPORTING PERIOD , , , _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ JULY,1_996
- 3. LICENSED THERMAL POWER (MWT). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _3458
- 4. NAMEPLATE RATING (GROSS MWE): ______________________________1_221
- 5. DESIGN ELECTRICAL RATING (NET MWE): __________________________11_19 i
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): _____________________1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _______________________1_093_
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,111 193,511
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,111.0 127,706.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 5,111.0 123,712.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,713,389 15,711,557 373,287,600
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 531,300 5,124,800 122,664,590
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 506,499 4,954,626 117,760,521 PAGE 1 OF 2
OPERATING DATA REPORT (CONTINUED) ,
DOCKET NO. SC- 277 DATE AUGUST 13,1996 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 % 100.0 % 63.9 %
- 20. UNIT AVAILABILITY FACTOR 100.0 % 100.0 % 63.3 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 62.3 % 88.7 % 57.6 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 80.8 % 86.6 % 56.8 %
- 23. UNIT FORCED OUTAGE RATE .0 % .0 % 11.8 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
Refuelmg outage schedule to begin 9/13/96, Durahon 29 days
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 i
PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 -277 -
UNIT NAME PEACH BOTTOM UNIT 2 DATE AUGUST 13,1996
- COMPLETED BY PECO ENERGY COMPANY
- L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION
- PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH JULY,1996 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE TOTAL HOURS (1) (2) (3) (4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2- MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELMG 3- AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERA iOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)
._. _ - - - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ - .. . ______ _ ___- - ~____ - __ - - .- . .. - _ _.
AVERAGE DAILY POWER LEVEL
- DOCKET NO. 50-278 .
UNIT PEACH BOTTOM UNIT 3 i DATE AUGUST 13,1996 -
COMPANY PECO ENERGY COMPANY -
L P. HYDRICK
- BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 MONTH JULY,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1104 17 1010 2 1108 18 1107 3 1108 19 1104 4 1108 20 1109 5 1103 21 1108 6 1106 22 1108 7 1105 23 1108 8 1108 24 1114 9 1097 25. 1111 10 1101 26 1111 11 1097 27 1115 12 1100 28 1111 13 1098 29 1111 14 1100 30 1111 15 1098 31 1111 16 1086
- - _ _ - - - _ _ - _ _ - _ _ - - . _ _ _ _ . . . . _ _ _ - . _ _ - . _ _ . - . - .---.- .- _ _ _ _ _ _ . _ _ _ - _ _ _ . _ _ = - _._ .. . _,_
.------------------ws ap_ s m_ e _ s,,-- - - - - -,- - - - - - - - , - - - - - - - - - - - - ----- - - - - - -- , -- - - - - - - - - - - - - - - - . - - - - - - - -- - - - - - - , - - - - - - - - , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - , . - - - - - - - ~ ~ - - - - - - - -
OPERATING DATA REPORT
- DOCKET NO. 50- 278 ,
DATE AUGUST 13,1996
- COMPLETED BY PECO ENERGY COMPANY ,
L P. HYDRICK i BUSINESS SERVICES SITE SUPPORT DMSION ,
PEACH BOTTOM ATOMIC POWER STATION
, TELEPHONE (717) 456-4383 OPERATING STATUS
- 1. UNIT NAME: - - ------ --------- -- ----------------- PEACH BOTTOM ----------- UNIT 3 S:
- 2. REPOPTING PERIOD: ,_____ __ ___ _____________ __ _ _ _ _ _ _ _ _ _ JUL_Y 1_996 t
- 3. UCENSED THERMAL POWER (MWT). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _3458
- 4. NAMEPLATE RATING (GROSS MWE): _______ _ _________ _ _ , _ , _ _ _ _ _ _ _ _1_221,
- 5. DESIGN ELECTRICAL RATING (NET MWE): ____ __ ____________________1119
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ____ __ _______________1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE). ,_______ _______________1_093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THis MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,111 189,407
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,022.1 126,309.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 ,
- 14. HOURS GENERATOR ON-UNE 744.0 4,954.0 122,762.2 ,
l
- 15. UNIT RESERVE SHUTDO'WN HOURS 0.0 0.0 0.0 ,
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,561,030 16,724,773 366,411,231
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 845,300 5.523,900 120,143,332
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 820,236 5,367,609 115.381,461 I
PAGE 10F 2 ,
OPERATING DATA REPORT (CONTINUED) ,
DOCKET NO. 50 - 278 DATE AUGUST 13,1996 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERV!CE FACTOR 100.0 % 96.9 % 648 %
- 20. UNIT AVAILABILITY FACTOR 100.0 % 96.9 % 64.8 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.9 % 96.1 % 58.6 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.5 % 93.9 % 57.0 %
- 23. UNIT FORCED OUTAGE RATE .0 % 3.1 % 10.8 % .
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP;
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICAUTY 08/07/74 INITIAL ELECTRICITY 0901/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 OF 2
. UNIT SHUTDOWNS AND POWER REDUCTIONS -
DOCKET NO. 50-278 .
UNIT NAME PEACH BOTTOM UNIT 3 -
DATE AUGUST 14,1996 COMPLETED BY PECO ENERGY COMPANY -
L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSiON
- PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH JULY,1996 TELEPHONE (717)456-4383 METHOD OF UCENSEE SYSTEM ~ COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE- ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE
- 17 960716 S 5.0 B 4 HC X)D000( Clooned A1/A2Watertmos Reactor not shut down TOTAL HOURS 5.0 l
t i
1 (1) (2) (3) (4)
F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2- MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C - REFUEUNG 3- AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATIVE (5)
G- OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)
. _ - . _ . - _ . - _ _ - , _ - _ - , -- . - _ _ . _ - _ . _ - . _ -_. . _ - - - - _ - . _ _ -