Monthly Operating Repts for Oct 1997 for Peach Bottom,Units 2 & 3
ML20199D124
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/31/1997
From: Dunning E, Warner M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-10.001 NUDOCS 9711200265
Download: ML20199D124 (15)


Text

- -. _ _. _ _

P,ech Bottom Atomic Power Station

c..

c25

~

PECO NUCLEAR i=-< c-<

1848 Lay Road

'A Unrt of PECO Energy gtgPy7y4 9032 g

I J

November 12,1997 U.S. Nuclear Regulatory Commission -

Document Control Desk Washington, D.C. 20555 Docket Nos. 50 277 and 50 278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, l

Revision 4, i

Sincerely i

a E. W ner M

Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM:dmk Enclosures cc; N.J. Sproul, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P. Domstfe, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, P.Mor Resident in.spector T. M. Messick, Atlantic Electric A F. Kirby, Ill, Delmarva Power & Light g

INPO Records Center ij s

T. N. Mitchell, PECO Nuclear Vice President, Peach Bottom Atomic Power Station

/

p-fWI i I,

{Id**2888Eis ccn 9714067

~

Peach Bottom Atomic Power S^.aten Unit 2 October 1 throu9h October 31,1997 1.

Narrative Summary of Operatino ExperienQn Unit 2 oegan the month of October at a nominal 100% of rated thermal power (RTP).

On October 23,1997 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, power was reduced to 95% of RTP for attempted repair en SB Feedwater heater steam leak. Power was restored to 100% on October 24,1997 at 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.

Unit 2 ended this month operuting at 100% RTP.

- - -... -. ~. -

Attachment to Monthly Operating Report for October 1997 UNIT 2 REFUELING INFORSAATION 1.

Name of facility:

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 12 is scheduled for October 2,1998.

l 3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 30,1998.

4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

N/A 5.

Scheduled date(s) for submitting proposed Icensing action and supporting information:

6.

Important licensing considerations associated with refueling, e g., new or different fuel design or suppher, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

i 7,

The number of fuel assemblies (a)in the coie and (b) in the spent fuel storage pool:

(a) Core-764 Fuel Assemblies j

(b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods t

, -, - -, ~ ~., - - -, - -

~

wwvv e

r ew- - = - -

---am+'-

--vs

=v-ev

-- w e v r

  • w--

+-

v

~ ~

  • _.m._

Docket No. 50-277 Attachment to Monthly Operating Report for October 1997 Page 2

)

UNIT 2 REFilELING INFORMATION (Continued) 8.

The present heensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

j 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the pres 6nt capacity:

September 2002 without full core omond capabihty.

September 1998 with full core omond capability.

t 4

i 1

.,--n-,

,--r-s a

wwe.N

,N.,s.,,-..--+,,..m.r re.w,,

-,.,,e v -., - - - - - -

--g, mn 4

,e.4wa

-.~<

a

.e

.,-_--.,-,-,m-,

,., -,.,, ~ -,,,., -,

AVERAGE DAILY PO'MER LEVEL DOCKET NO. 50-277 tJNIT PEACH BOTTOM L%T2 DATE NOVEMBER 12,1997 COMPANY PECO ENERGY CC4APAW E. A DUNNING BU$tNESS SER%1CES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC PCM/ER STATION TELEPHONE (717)4563412 MONTH OCTOBER 1997 DAY A'dHAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL WE-NET)

(MVE-NET) 1 1121 17 1115 2

1117 18 1118 3

1122 19 1119 4

1108 20 1119 9

5 1114 21 1*19 6

111A 22 1122 7

1118 23 1118 8

1118 24 1113 9

1118 25 1116 10 1113 26 1126 11 1118 27 1112 12 1114 28 1120 13 1118 29 1116 14 1118 30 1116 15 1118 31 1123 16 1122 t

d 4

OPERATING DATA REPORT DOCKET NO. 50 -277 CATE NOVEMBER 12,1997 COMPLETED BY PECO ENERGY COMPANY E. A. DUNNING BUSINESS SERVICES StTE SUPPORT DNtstON PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-3412 OPERATING STATUS 1; UNIT NAME: ------------------.---.-------

.----------------PEACH BOTTOM UNIT 2

2. REPORTING PERIOD: _ _,, _,.,,, _ _ _ _ _ _, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ OCTOB_ER,1_997
3. UCENSED THERMAL POWER (MWT): ___,,_______________,,____,___ 3458_
4. NAMEPLATE RATING (GROSS MWE): ______________________________1221__

I S. DESIGN ELECTRICAL RATING (NET MWE).,________________________,11_19 4

6. MAXtMUM DEPENDABLE CAPACITY (GROSS WK):

,___________________,1159 7.. MAXIMUM DEPENDABLE CAPACITY (NET MWE): ___,,__________________1093,

8. IF CHANGES OCCUR IN CAPACITY RATINGS OTEMS 3 THROUGH 7 ) SINCE LAST REPORT. GIVE REASONS:
9. POVER LEVEL TO WHICH RESTR CTED. IF ANY (NET MWE):

10_ REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATNE

11. HOURS IN REPORTING PERIOD 745 7.296 204.480
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745 0 7,296 0 138.211 5
13. REACTOR RESERVE SHUTDOWN HOURS 00 00 0.0
14. HOURS GENERATOR ON-UNE 7450 7.296 0 134.073.2
15. UNIT RESERVE SHUTDOWN HOURS 00 00 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,569.824 24.957,955 406.933.535
17. GROSS ELECTRICAL ENERGY GENERATED (MWM) 856,700 8.278.300 133.747,890
18. NET ELECTRICAL ENERGY GENERATED (%WH) 832.679 8.064.980 128,531,432 PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

SC.277 DATE NOVEMBER 12,1997 i

THIS MONTH YR.TOCATE CUMULATIVE

19. UNIT SERVICE FACTOR 100 0 %

100.0 %

65 6 %

20. UNIT AVAILABlUTY FACTOR 100 0 %

100 0 %

65 6 %

' 21. UNIT CAPACITY FACTOR (USING MDC NET) 1023 %

101.1 %

$93 %

22. UNIT CAPACITY FACTOR (USING DER NET) 99 9 %

98 8 %

58.4 %

23. UNIT FORCED OUTAGE RATE

.0 %

.0 %

11.1 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, EST1 MAT r.D DATE OF ST%RTUP.

26 UNtTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT ONS):

FORECAST ACHIEVED 09/1673 INtTIAL CRITICAUTY INITIAL ELECTRICITY O2/19/74 COMMERClAL O?ERATION 07,05/74 PAGE 2 OF 2

. ~.

. ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-277

. UNIT NAME PEACH BOTTOM UNIT 2 4

DATE NOVEMBER 12,1997 COMPLETED BY PECO ENERGYCOMPANY E. A.DUNNWG i

BUSWESS SERVICES SITE SUPPORT DIVISf0N PEACH BOTTOM AToteC POWER STATION l

REPORT MONTH

- OCTOBER,1997 TELEPHONE (717)C5-3412 '

d..

METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE i-TYPE.

DURATION

-REASON SHUTTING DOWN EVENT CODE CODE ACTION TO l

NO.

DATE (1)'

(HOURS)

(2)

REACTOR (3)

REPORT #_

(4)

(5)

PPEVENT RECURRENCE

-[

' TOTAL HOURS 3

I t

I L

4 i

I I

i i

t 1

i

.I i

I 1

t 1

I i

t (1)

(2)

(3)

(4) k i'

i i

F4 FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A-EQUIPMENT FAftuRE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B -MAINTENANCE OR TEST 2-MANUAL SCRA'A ENTRY SHEETS FOR UCENSEE

.t C -REFUEUNG 3 - AUTOMATIC SCRAM EVENT REPORT (LER) l D-REGULATORY PESTRICTION 4-OTHER (EXPLAIN)

FILE (NUREG4161) i j-E-OPERATOR TRAINING + UCENSE EXAMINATION

{

F-- ADMINISTRATNE (S)

G-OPERATIONAL ERROR (EXPLAN)

EXHIBIT I-SAME SOURCE.

H-OTHER (EXPLAIN) f 4;:

= -.. -

= ~ -.. - - -. -... - - -.. -..

Pmch Bottom Atomic Power Station Unit 3 October 1 through October 31,1997 1,

[4arrative Summary of Oneisjina Exoeriences Unit 3 bega..he month of October at 63% of rated thermal power (RTP) due to coastdown.

On October 3,1997 at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit was shutdown for refueling. Throughout the remainder of October the unit remained shutdown.

The Unit ended this month operating at 0% RTP.

Lkx:kQt No. 50-278 Attachment to.

F Monthly Operating Report for October 1997 UNIT 3 REFUELING INFORMATION G

1.

Name of facihty:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

u Risload 12 scheduled for October 1,1999 is in progress j"

3.

Schet.

  • C date for restart fc"owing refueling

+

Res'.yt following refueling scheduled for October 29,1999 4.

Will terueling or resumption of operation thereafter require a technical s ecification change or other license amendment 7 p

N/A L

If answer is yes, what, in general, will these be?

m 5.

Allitems have been submitted.

G.

Important licensing considerations associated with refueling, e g., new or different fuel design or supplier, unreviewed design or performance analysit methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel asseinblies (a) in the core and (5) 7, the toent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fae: Pool-2777 Fuel Asc W lies,16 Fuel Rods (292 new 3R11 bundles) 8.

The present licensed spent fuel pool storage c;pacity and the si' e of any increase in licensed F

storage capacity that has been requestef oris planned, in number of fuel assembRs:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

K

Dochet No. 50-278 Attachment to Monthly Operating Report for October 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the

}

present capacity:

I September 2003 without full core offlocp capabilrty.

September 1999 with fu,1 core offload capab!!ity.

)

3 1

9

AVERAGE DAILY PCWER LEVEL

' DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE NOVEMBER 12.1997 a

COMPANY PECO ENERGY COMPANY E. A. DUNNING BUSINESS SERVICES SITE SUPPOkT DfVISION PEACH BJTTOM ATOMIC POWER STATION 1ELEPHONE (717)456-3412 MONTH OCTOBER,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 635 17 0

2 625 18 0

3 424 19 0

4 0

20 0

5 0

21 0

6-0 22 0

7 L

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

77 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

OPERATING DATA REPORT DOCKET NO. 50-278

~

DATE NOVEMBER 12,1997 COMPLETED BY PECO ENERGY COMPANY E. A. DUNNING BUS: NESS SERVICES SITE SUPPORT DfVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-3412 OPERATING STANS

1. UNITNAME;

...............P.EA. C. H. B. O. 's.T.O.M.U.N.IT. 3

2. REPORTING PERIOC. _,,,, _ _. _ _ _ _ _ _ _ _, _ _ _ _ _, _ _ _ _ _ _ _ _ _ OCTOBER,1997
3. LICENSED THERMA'. POWER (MWT): __,__________________,_____,,,_345_8
4. NAMEPLATE RATING (GROSS MWE):,______,,_____________.,__,,___1_221_
5. DESIGN ELECTRICAL RATING (NET MWE): __________________,,______,11_19
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

,____________________1159 7 MAX 1 MUM DEPENDABLE CAPACITY (NET MWE):,__,,___________________1,093 I

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT. GIVE REASONS:

1 l

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

j l

THIS MONTH YR-TO-DATE CUMULATIVE 745 7,296 200,376

11. HOURS IN REPORTING PERIOD
92. NUMBER OF HOURS REACTOR WAS CRITICAL 69 0 6.560.5 136,542.8
13. REACTOR RESERVE SHUTDOWN HOURS 00 0.0 0.0 14 HOURS GENERATOR ON-UNE 69.0 6,548.0 132,983 2
15. UNIT RESERVE SHUTDOWN HOURS 00 0.0 0.0
16. GROSS THEhMAL ENERGY GENERATED (MWH) 141,401 20,022R 399,024,262
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 42,300 6,418,400 130,736,832
18. NET ELECTRICAL ENERGY GENERATED (MWH) 37,239 6,217.757 125.656,297 PAGE 1 OF 2 ^

7 OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

50 -278 DATE NOVEMBER 12.1977 THIS MONTH YR.TO-DATE CUMutATTVE 93%

89 7 %

66 4 %

19. UNIT SERVICE FACTOR 93 %

89 7 %

664%

20. UNIT AVAILABILITY FACTOR i

46%

78.0 %

60.1 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 45 %

76 2 %

585%

22. UNIT CAPACITY FACTOR (USING DER NET)

.0 %

1.1 %

10.1 %

23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULEJ OVER THE NEXT 6 MONTHS (TYPE. DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTtMATED DATE OF STARTUP:

FORECAST ACHIEVED

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPER ATIONS):

O&V7/74 INITIAL CRITICALITY 09.01/74 INITIAL ELECTRICITY 12/ZkT4 COMMERCIAL OPERAT!ON PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS

?,4 DOCKET NO. 50-378 UNTT NAME PEACH BOTTOM UNIT 3 DATE (40VEMBE't 12,1997 COMPLETED BY PECO EPOtGY CO *ANY E. A. DUNNING BUSINESS SERVICES SITE SUPPORT DIVIS!ON -

FEACH BOTTOM ATOMIC POWER STATION.

. REPORT MONTH OCTOBER,1997 TELEPHONE (717)456-3412 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE Afa CORRECTIVE TYPE-DURATION REASON SHUTT!NG DOWN EVENT CODE CODE ACTION TO NO.

DATE (1) -

(HOURS)

(2)

REACTOR (3)

REPORT #

-(4)

(S)

PREVENT RECURRENCE 9

971003 S

676.0 C

2 ZZ 777777 Refuel Outage TOTAL HOURS 676.0 (1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - L%NUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER)

D-REGULATORY RESTR!CTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (S)

G - OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN) u_

_