Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 ML20216F3831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Peach Bottom,Units 2 & 3 ML20216G1991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Peach Bottom Atomic Power Station,Units 1 & 2 ML20202F7341998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Pbaps,Units 2 & 3 ML20198N8851997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Peach Bottom,Units 2 & 3 ML20203J7311997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Pbaps,Units 2 & 3 ML20199D1241997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Peach Bottom,Units 2 & 3 ML20198J8871997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Pbaps,Units 2 & 3 ML20217A8061997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Peach Bottom Units 2 & 3 ML20210J7111997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Pbaps,Units 1 & 2 ML20141H2071997-06-30030 June 1997 Monthly Operating Repts for June 1997 for PBAPS ML20148K6251997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Peach Bottom Atomic Power Station Units 2 & 3 ML20141D3691997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Peach Bottom Units 2 & 3 ML20137V9731997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Peach Bottom Atomic Power Station Units 2 & 3 ML20136G3671997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for PBAPS ML20138K5551997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Peach Bottom Units 2 & 3 ML20133H6121996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Peach Bottom 2 & 3 ML20132B9481996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Peach Bottom Units 1 & 2 ML20134M0501996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Peach Bottom Unit 2 & 3 ML20129A9871996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Peach Bottom Unit 2 & 3 ML20117N1601996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Peach Bottom Atomic Power Station Units 1 & 2 ML20116M1641996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Peach Bottom Units 2 & 3 ML20115F8541996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Peach Bottom Units 1 & 2 ML20116M1701996-06-30030 June 1996 Revised MOR for June 1996 for Peach Bottom Unit 3 ML20117M6781996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Peach Bottom Atomic Power Station ML20117F8161996-04-30030 April 1996 Monthly Operating Repts for April 1996 for PBAPS ML20107D9381996-03-31031 March 1996 Monthly Operating Repts for March 1996 for PBAPS ML20106G8101996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Peach Bottom Atomic Power Station Units 1 & 2 ML20149K9331996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for PBAPS Units 2 & 3 ML20096F4151995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Pbaps,Units 2 & 3 ML20095G9381995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for PBAPS Units 2 & 3 ML20094L6301995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Peach Bottom Units 2 & 3 ML20093G3571995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for PBAPS Units 1 & 2 ML20092G3231995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Peach Bottom Units 2 & 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000278/LER-1999-005-03, :on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With1999-10-20020 October 1999
- on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With
ML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 05000278/LER-1999-004-03, :on 990901,3A RPS Bus Was Inadvertently Deenergized,During Planned Mod Activities on Main CR Panel. Caused by Electrician Failing to Self Check Work.All CR Work Was Ceased Immediately & Shutdown Meeting Held1999-10-0101 October 1999
- on 990901,3A RPS Bus Was Inadvertently Deenergized,During Planned Mod Activities on Main CR Panel. Caused by Electrician Failing to Self Check Work.All CR Work Was Ceased Immediately & Shutdown Meeting Held
ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML15112A7681999-09-20020 September 1999 SER Accepting Revision 25 of Pump & Valve Inservice Testing Program,Third 10-year Interval for Plant,Units 1,2 & 3 ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 05000278/LER-1999-003-03, :on 990814,HPCIS Was Declared Inoperable Due to Erratic Behavior Resulting in Loss of Single High Train Safety Sys.Caused by Weakness in Procedural Guidance. Readjusted Hydraulic Governor Needle Valve.With1999-09-13013 September 1999
- on 990814,HPCIS Was Declared Inoperable Due to Erratic Behavior Resulting in Loss of Single High Train Safety Sys.Caused by Weakness in Procedural Guidance. Readjusted Hydraulic Governor Needle Valve.With
ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with 05000277/LER-1999-005-01, :on 990616,failure to Maintain Provisions of FP Program Occurred.Caused by Less than Adequate Engineering Rigor in Both Development & Review Analysis.Fire Watch Immediately Established.With1999-07-16016 July 1999
- on 990616,failure to Maintain Provisions of FP Program Occurred.Caused by Less than Adequate Engineering Rigor in Both Development & Review Analysis.Fire Watch Immediately Established.With
ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with 05000278/LER-1999-002-02, :on 990406,safeguard Sys to Unrelated Door Was Inadvertently Disabled by Security Alarm Station Operator. Caused by Noncompliance with Procedures & Less than Adequate Shift Turnover.Briefed Personnel on Event.With1999-05-0606 May 1999
- on 990406,safeguard Sys to Unrelated Door Was Inadvertently Disabled by Security Alarm Station Operator. Caused by Noncompliance with Procedures & Less than Adequate Shift Turnover.Briefed Personnel on Event.With
ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 05000278/LER-1999-001-03, :on 990312,ESF Actuation of Rcics Occurred Due to High Steam Flow Signal During Sys Restoration.Temporary Change to Restoration Procedure Was Initiated to Open RCIC Outboard Steam Isolation Valve in Smaller Increments1999-04-0808 April 1999
- on 990312,ESF Actuation of Rcics Occurred Due to High Steam Flow Signal During Sys Restoration.Temporary Change to Restoration Procedure Was Initiated to Open RCIC Outboard Steam Isolation Valve in Smaller Increments
ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With 05000278/LER-1998-009-01, :on 981227,unplanned Esfa Were Noted.Caused by Transformer Insulator Failure.Replaced Failed Insulator. with1999-01-20020 January 1999
- on 981227,unplanned Esfa Were Noted.Caused by Transformer Insulator Failure.Replaced Failed Insulator. with
ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with 05000277/LER-1998-008-01, :on 981130,circuit Breaker SU-25 Tripped.Caused by Less than Adequate Procedural Guidance.Operators Verified Sys Integrity & Successfully Returned Sys to Svc.With1998-12-30030 December 1998
- on 981130,circuit Breaker SU-25 Tripped.Caused by Less than Adequate Procedural Guidance.Operators Verified Sys Integrity & Successfully Returned Sys to Svc.With
05000277/LER-1998-007-02, :on 981107,failure to Meet TS & Associated LCO Requirments of Absolute Difference in APRM & Calculated Power of Less than 2% Was Noted.Caused by Substitute Valves Being Used.Removed Substitute Valves.With1998-12-0404 December 1998
- on 981107,failure to Meet TS & Associated LCO Requirments of Absolute Difference in APRM & Calculated Power of Less than 2% Was Noted.Caused by Substitute Valves Being Used.Removed Substitute Valves.With
ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 05000278/LER-1998-005-03, :on 981025,inadvertent Unit 3 Electrical Bus E33 Trip (Esfa) During Performance of Unit 2 Electrical Bus E32 Surveillance Test Was Noted.Caused by Personnel Error. Sp S12M-54-E32-XXF4 Was Completed.With1998-11-20020 November 1998
- on 981025,inadvertent Unit 3 Electrical Bus E33 Trip (Esfa) During Performance of Unit 2 Electrical Bus E32 Surveillance Test Was Noted.Caused by Personnel Error. Sp S12M-54-E32-XXF4 Was Completed.With
ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 05000277/LER-1998-006-02, :on 980915,automatic RWCU Isolation Occurred While Placing RWCU Sys in Svc.Caused by Unexpected Surge of Water.Procedure Change Was Initiated to Open MO-2-12-74 & RWCU Sys Was Successfully Returned to Svc.With1998-10-0909 October 1998
- on 980915,automatic RWCU Isolation Occurred While Placing RWCU Sys in Svc.Caused by Unexpected Surge of Water.Procedure Change Was Initiated to Open MO-2-12-74 & RWCU Sys Was Successfully Returned to Svc.With
ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with 05000277/LER-1998-005-02, :on 980824,noted Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated.Caused by Personnel Failing to Take All TS Required Actions.Temporary Procedure Changes Were Made1998-09-18018 September 1998
- on 980824,noted Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated.Caused by Personnel Failing to Take All TS Required Actions.Temporary Procedure Changes Were Made
05000278/LER-1998-004-03, :on 980820,automatic RWCU Isolation Occurred While Placing B RWCU Sys Demineralizer in Svc.Caused by less-than-adequate Control of Equipment.Isolated B Demineralizer & Returned RWCU Sys to Svc1998-09-18018 September 1998
- on 980820,automatic RWCU Isolation Occurred While Placing B RWCU Sys Demineralizer in Svc.Caused by less-than-adequate Control of Equipment.Isolated B Demineralizer & Returned RWCU Sys to Svc
ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 1999-09-30
[Table view] |
Text
- -. _ _. _ _
P,ech Bottom Atomic Power Station
- c..
c25
~
PECO NUCLEAR i=-< c-<
1848 Lay Road
'A Unrt of PECO Energy gtgPy7y4 9032 g
I J
November 12,1997 U.S. Nuclear Regulatory Commission -
Document Control Desk Washington, D.C. 20555 Docket Nos. 50 277 and 50 278 Gentlemen:
Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, l
Revision 4, i
Sincerely i
a E. W ner M
Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM:dmk Enclosures cc; N.J. Sproul, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P. Domstfe, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, P.Mor Resident in.spector T. M. Messick, Atlantic Electric A F. Kirby, Ill, Delmarva Power & Light g
INPO Records Center ij s
T. N. Mitchell, PECO Nuclear Vice President, Peach Bottom Atomic Power Station
/
p-fWI i I,
{Id**2888Eis ccn 9714067
~
Peach Bottom Atomic Power S^.aten Unit 2 October 1 throu9h October 31,1997 1.
Narrative Summary of Operatino ExperienQn Unit 2 oegan the month of October at a nominal 100% of rated thermal power (RTP).
On October 23,1997 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, power was reduced to 95% of RTP for attempted repair en SB Feedwater heater steam leak. Power was restored to 100% on October 24,1997 at 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.
Unit 2 ended this month operuting at 100% RTP.
- - -... -. ~. -
Attachment to Monthly Operating Report for October 1997 UNIT 2 REFUELING INFORSAATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 12 is scheduled for October 2,1998.
l 3.
Scheduled date for restart following refueling:
Restart following refueling forecast for October 30,1998.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be?
N/A 5.
Scheduled date(s) for submitting proposed Icensing action and supporting information:
6.
Important licensing considerations associated with refueling, e g., new or different fuel design or suppher, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
i 7,
The number of fuel assemblies (a)in the coie and (b) in the spent fuel storage pool:
(a) Core-764 Fuel Assemblies j
(b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods t
, -, - -, ~ ~., - - -, - -
~
wwvv e
r ew- - = - -
---am+'-
--vs
=v-ev
-- w e v r
+-
v
~ ~
Docket No. 50-277 Attachment to Monthly Operating Report for October 1997 Page 2
)
UNIT 2 REFilELING INFORMATION (Continued) 8.
The present heensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
j 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the pres 6nt capacity:
September 2002 without full core omond capabihty.
September 1998 with full core omond capability.
t 4
i 1
.,--n-,
,--r-s a
wwe.N
,N.,s.,,-..--+,,..m.r re.w,,
-,.,,e v -., - - - - - -
--g, mn 4
,e.4wa
-.~<
a
.e
.,-_--.,-,-,m-,
,., -,.,, ~ -,,,., -,
AVERAGE DAILY PO'MER LEVEL DOCKET NO. 50-277 tJNIT PEACH BOTTOM L%T2 DATE NOVEMBER 12,1997 COMPANY PECO ENERGY CC4APAW E. A DUNNING BU$tNESS SER%1CES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC PCM/ER STATION TELEPHONE (717)4563412 MONTH OCTOBER 1997 DAY A'dHAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL WE-NET)
(MVE-NET) 1 1121 17 1115 2
1117 18 1118 3
1122 19 1119 4
1108 20 1119 9
5 1114 21 1*19 6
111A 22 1122 7
1118 23 1118 8
1118 24 1113 9
1118 25 1116 10 1113 26 1126 11 1118 27 1112 12 1114 28 1120 13 1118 29 1116 14 1118 30 1116 15 1118 31 1123 16 1122 t
d 4
OPERATING DATA REPORT DOCKET NO. 50 -277 CATE NOVEMBER 12,1997 COMPLETED BY PECO ENERGY COMPANY E. A. DUNNING BUSINESS SERVICES StTE SUPPORT DNtstON PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-3412 OPERATING STATUS 1; UNIT NAME: ------------------.---.-------
.----------------PEACH BOTTOM UNIT 2
- 2. REPORTING PERIOD: _ _,, _,.,,, _ _ _ _ _ _, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ OCTOB_ER,1_997
- 3. UCENSED THERMAL POWER (MWT): ___,,_______________,,____,___ 3458_
- 4. NAMEPLATE RATING (GROSS MWE): ______________________________1221__
I S. DESIGN ELECTRICAL RATING (NET MWE).,________________________,11_19 4
- 6. MAXtMUM DEPENDABLE CAPACITY (GROSS WK):
,___________________,1159 7.. MAXIMUM DEPENDABLE CAPACITY (NET MWE): ___,,__________________1093,
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS OTEMS 3 THROUGH 7 ) SINCE LAST REPORT. GIVE REASONS:
- 9. POVER LEVEL TO WHICH RESTR CTED. IF ANY (NET MWE):
10_ REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATNE
- 11. HOURS IN REPORTING PERIOD 745 7.296 204.480
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745 0 7,296 0 138.211 5
- 13. REACTOR RESERVE SHUTDOWN HOURS 00 00 0.0
- 14. HOURS GENERATOR ON-UNE 7450 7.296 0 134.073.2
- 15. UNIT RESERVE SHUTDOWN HOURS 00 00 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,569.824 24.957,955 406.933.535
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWM) 856,700 8.278.300 133.747,890
- 18. NET ELECTRICAL ENERGY GENERATED (%WH) 832.679 8.064.980 128,531,432 PAGE 1 OF 2
OPERATING DATA REPORT (CONTINUED)
DOCKET NO.
SC.277 DATE NOVEMBER 12,1997 i
THIS MONTH YR.TOCATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100 0 %
100.0 %
65 6 %
- 20. UNIT AVAILABlUTY FACTOR 100 0 %
100 0 %
65 6 %
' 21. UNIT CAPACITY FACTOR (USING MDC NET) 1023 %
101.1 %
$93 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99 9 %
98 8 %
58.4 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
.0 %
11.1 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, EST1 MAT r.D DATE OF ST%RTUP.
26 UNtTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT ONS):
FORECAST ACHIEVED 09/1673 INtTIAL CRITICAUTY INITIAL ELECTRICITY O2/19/74 COMMERClAL O?ERATION 07,05/74 PAGE 2 OF 2
. ~.
. ~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-277
. UNIT NAME PEACH BOTTOM UNIT 2 4
DATE NOVEMBER 12,1997 COMPLETED BY PECO ENERGYCOMPANY E. A.DUNNWG i
BUSWESS SERVICES SITE SUPPORT DIVISf0N PEACH BOTTOM AToteC POWER STATION l
REPORT MONTH
- OCTOBER,1997 TELEPHONE (717)C5-3412 '
d..
METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE i-TYPE.
DURATION
-REASON SHUTTING DOWN EVENT CODE CODE ACTION TO l
NO.
DATE (1)'
(HOURS)
(2)
REACTOR (3)
REPORT #_
(4)
(5)
PPEVENT RECURRENCE
-[
' TOTAL HOURS 3
I t
I L
4 i
I I
i i
t 1
i
.I i
I 1
t 1
I i
t (1)
(2)
(3)
(4) k i'
i i
F4 FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A-EQUIPMENT FAftuRE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B -MAINTENANCE OR TEST 2-MANUAL SCRA'A ENTRY SHEETS FOR UCENSEE
.t C -REFUEUNG 3 - AUTOMATIC SCRAM EVENT REPORT (LER) l D-REGULATORY PESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG4161) i j-E-OPERATOR TRAINING + UCENSE EXAMINATION
{
F-- ADMINISTRATNE (S)
G-OPERATIONAL ERROR (EXPLAN)
EXHIBIT I-SAME SOURCE.
H-OTHER (EXPLAIN) f 4;:
= -.. -
= ~ -.. - - -. -... - - -.. -..
Pmch Bottom Atomic Power Station Unit 3 October 1 through October 31,1997 1,
[4arrative Summary of Oneisjina Exoeriences Unit 3 bega..he month of October at 63% of rated thermal power (RTP) due to coastdown.
On October 3,1997 at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit was shutdown for refueling. Throughout the remainder of October the unit remained shutdown.
The Unit ended this month operating at 0% RTP.
Lkx:kQt No. 50-278 Attachment to.
F Monthly Operating Report for October 1997 UNIT 3 REFUELING INFORMATION G
1.
Name of facihty:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
u Risload 12 scheduled for October 1,1999 is in progress j"
3.
Schet.
- C date for restart fc"owing refueling
+
Res'.yt following refueling scheduled for October 29,1999 4.
Will terueling or resumption of operation thereafter require a technical s ecification change or other license amendment 7 p
N/A L
If answer is yes, what, in general, will these be?
m 5.
Allitems have been submitted.
G.
Important licensing considerations associated with refueling, e g., new or different fuel design or supplier, unreviewed design or performance analysit methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel asseinblies (a) in the core and (5) 7, the toent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fae: Pool-2777 Fuel Asc W lies,16 Fuel Rods (292 new 3R11 bundles) 8.
The present licensed spent fuel pool storage c;pacity and the si' e of any increase in licensed F
storage capacity that has been requestef oris planned, in number of fuel assembRs:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
K
Dochet No. 50-278 Attachment to Monthly Operating Report for October 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the
}
present capacity:
I September 2003 without full core offlocp capabilrty.
September 1999 with fu,1 core offload capab!!ity.
)
3 1
9
AVERAGE DAILY PCWER LEVEL
' DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE NOVEMBER 12.1997 a
COMPANY PECO ENERGY COMPANY E. A. DUNNING BUSINESS SERVICES SITE SUPPOkT DfVISION PEACH BJTTOM ATOMIC POWER STATION 1ELEPHONE (717)456-3412 MONTH OCTOBER,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 635 17 0
2 625 18 0
3 424 19 0
4 0
20 0
5 0
21 0
6-0 22 0
7 L
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
77 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
OPERATING DATA REPORT DOCKET NO. 50-278
~
DATE NOVEMBER 12,1997 COMPLETED BY PECO ENERGY COMPANY E. A. DUNNING BUS: NESS SERVICES SITE SUPPORT DfVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-3412 OPERATING STANS
- 1. UNITNAME;
...............P.EA. C. H. B. O. 's.T.O.M.U.N.IT. 3
- 2. REPORTING PERIOC. _,,,, _ _. _ _ _ _ _ _ _ _, _ _ _ _ _, _ _ _ _ _ _ _ _ _ OCTOBER,1997
- 3. LICENSED THERMA'. POWER (MWT): __,__________________,_____,,,_345_8
- 4. NAMEPLATE RATING (GROSS MWE):,______,,_____________.,__,,___1_221_
- 5. DESIGN ELECTRICAL RATING (NET MWE): __________________,,______,11_19
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
,____________________1159 7 MAX 1 MUM DEPENDABLE CAPACITY (NET MWE):,__,,___________________1,093 I
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT. GIVE REASONS:
1 l
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
j l
THIS MONTH YR-TO-DATE CUMULATIVE 745 7,296 200,376
- 11. HOURS IN REPORTING PERIOD
- 92. NUMBER OF HOURS REACTOR WAS CRITICAL 69 0 6.560.5 136,542.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 00 0.0 0.0 14 HOURS GENERATOR ON-UNE 69.0 6,548.0 132,983 2
- 15. UNIT RESERVE SHUTDOWN HOURS 00 0.0 0.0
- 16. GROSS THEhMAL ENERGY GENERATED (MWH) 141,401 20,022R 399,024,262
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 42,300 6,418,400 130,736,832
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 37,239 6,217.757 125.656,297 PAGE 1 OF 2 ^
7 OPERATING DATA REPORT (CONTINUED)
DOCKET NO.
50 -278 DATE NOVEMBER 12.1977 THIS MONTH YR.TO-DATE CUMutATTVE 93%
89 7 %
66 4 %
- 19. UNIT SERVICE FACTOR 93 %
89 7 %
664%
- 20. UNIT AVAILABILITY FACTOR i
46%
78.0 %
60.1 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 45 %
76 2 %
585%
- 22. UNIT CAPACITY FACTOR (USING DER NET)
.0 %
1.1 %
10.1 %
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULEJ OVER THE NEXT 6 MONTHS (TYPE. DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTtMATED DATE OF STARTUP:
FORECAST ACHIEVED
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPER ATIONS):
O&V7/74 INITIAL CRITICALITY 09.01/74 INITIAL ELECTRICITY 12/ZkT4 COMMERCIAL OPERAT!ON PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS
?,4 DOCKET NO. 50-378 UNTT NAME PEACH BOTTOM UNIT 3 DATE (40VEMBE't 12,1997 COMPLETED BY PECO EPOtGY CO *ANY E. A. DUNNING BUSINESS SERVICES SITE SUPPORT DIVIS!ON -
FEACH BOTTOM ATOMIC POWER STATION.
. REPORT MONTH OCTOBER,1997 TELEPHONE (717)456-3412 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE Afa CORRECTIVE TYPE-DURATION REASON SHUTT!NG DOWN EVENT CODE CODE ACTION TO NO.
DATE (1) -
(HOURS)
(2)
REACTOR (3)
REPORT #
-(4)
(S)
PREVENT RECURRENCE 9
971003 S
676.0 C
2 ZZ 777777 Refuel Outage TOTAL HOURS 676.0 (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - L%NUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER)
D-REGULATORY RESTR!CTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (S)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN) u_
_