Text
Peach Bottom At:mic Power Stati:n 4
A a
- T PECO NUCLEAR qi;L";g "*""'
A Unit of PECO Energy Delta, PA 17314-9032 717 456 7014 February 10,1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of January 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance ti Regulatory Guide 10.1, Revision 4.
Sincerely, kNY$ %
Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station J6A MEW /JGH:lph Enclosures cc:
W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector J. A. Isabella, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station Q
l ccn 97-14007 9702190011 970131 PDR ADOCK 05000277 R
PDR _,
190154
PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
JANUARY 1997 UNIT 2 i
Unit 2 ran at 100% power for the entire rnonth except for one load drop between 1/24/97 and 1/25/97. The load drop was due to rod sequence exchange and SCRAM time testing.
l Unit 2 Net Generation for January was 829,581 MWH.
l UNIT 3 Unit 3 ran at 100% power for the entire month.
Unit 3 Net Generation for January was 831,810 MWH.
1 y%
1 e.
j 1
Attachment to Monthly Operating Report for January 1997 UNIT 2 REFUELING INFORMATION 1.
Name of facility:
i Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 12 is scheduled for September 15,1998.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for October 10,1998.
4.
Will refueling or resumption of operation therefore require a technical specification change or otherlicense amendment?
.l N/A
]
If answer is yes, what, in general, will these be?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies i
(b) Fuel Pool-2720 Fuel Asstmblies,52 Fuel Rods i
. ~,
. ~, -,
i.
Docket No. 50-277 Attachment to Monthly Operating Report for January 1997 Page 2 UNIT 2 REFUELING INFORMA'*lON (Continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has beeri relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2002 without full core offload capability.
September 1998 with full core offload capability.
I s
Docket No. 50-278 Attachment to Monthly Operating Report for January 1997 UNIT 3 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 11 scheduled for October 3,1997 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
... _ = -.
1 Dock t No. 50-278 Attachment to Monthly Operating j
Report for January 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) f h
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
j September 1999 with full core offload capability.
i e
4 l
8 4
AVERAGE DAILY POWER LEVEL DOCKET NO.- 50-277
~
UtJIT. PEACH BOTTOM UNIT 2 l
DATE FEBRUARY 11,1997 COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 MONTH JANUARY,1997 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWE-NET)
. (MWE-NET) 1 1131 17 1126 2
1127 18 1118 3
1123 19 1130 4
1123 20 1126 5
1123 21
~1122 6
1123 22 1122 1
7 1114 23 1127 L
8 1110 24 1118 9
1122 25 847 i-
-1 10 1126 26 1121 11 1122 27 1128 i
I 12 1127 28 1128
[
13 1126 29 1126 14 1126 30 1126 15 1122 31 1130 t
{
16 1126
[
-1 i
e u
.u..
OPERATING DATA REPORT DOC.CT NO. 50 - 277
[
DATE FEBRUARY 11,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS
- 1. UN:T NAME:
PEA _CH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIOD:
JANUARY,1997 l
- 3. LICENSED THERMAL POWER (MWT) 3458
- 4. NAMEPLATE RATING (GROSS MWE):
1221
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1119
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): _,
1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): __
_ _1093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 744 197,928
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 131,659.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 744.0 127,521 2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,551,663 2,551,663 384,527,24'1
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 850,300 850.300 126,319,890
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 829,581 829,581 121,296,034 PAGE 1 OF 2
~
OPERATING DATA REPORT (CONTINUED)
DOCKET NO.
50 - 277 DATE FEBRUARY 11,1997
~
THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 %
100.0 %
64.4 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
100.0 %
64.4 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.0 %
102.0 %
57.9 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.6 %
99.6 %
57.1 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
.0 %
11.6 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP;
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICAUTY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07AL74 9
PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS COCKET NO. 50-277 UNIT NAME PEACH BOTTOM UNIT 2 DATE FEBRUARY 11.1997 COMPLETED BY PECO ENERGYCOMPANY L P.HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH JANUARY,1997 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION
' REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 1
970124 S
H 4
RB CONROD Rod sequence exchange and scram timing (power reduchon)
Durahon shown for shut downs only TOTAL HOURS (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST -
2-MANUALSCRAM ENTRY SHEETS FOR UCENSEE C - REFUEUNG 3-AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG4161)
E-OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)
- AVERAGE DAILY POWER LEVEL' -
I DOCKET NO. 50-278 -
UNIT PEACH BOTTOM UNIT 3 DATE FEBRUARY 11,1997
- i COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES i
SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION I
TELEPHONE (717)456-4363 i
MONTH JANUARY,1997 L
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET)
{
1 1126 17 1120 2
1126 18 1120-3 1121
'19 1116 4
1122 20 1124 5
1122 21 1113 6
1121 22 1113 7
1125 23 '
1113 8
1121 24 1109 9
1121 25 1113-10 1117 26 1108 11 1125 27 1113 12
~1121 28.
1113 13 1120 29 1112 14 1120 30 1112 15 1121 31 1112 16 1121
-,,. ~., - - - -
s,-,u+
s.
....e--
OPERATING DATA REPORT DOCKET NO. 50 - 278
[
DATE FEBRUARY 11,1997 COMPLETED BY PECO ENERGY COMPANY I
L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i
OPERATING STATUS L UNIT NAME:-
PEA.C...H._B._O_.T...T...O...M..U.N.-.I._T. 3..
- 2. REPORTING PERIOD:
JANUARY,1997
- 3. UCENSED THERMAL POWER (MWT):__
3458
- 4. NAMEPLATE RATING (GROSS MWE):
- 1221,
- 5. DESIGN ELECTRICAL RATING (NET MV7):
1119 6, MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1159 5
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1,093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 744 193,824
- 12. NUMBER OF HOURS REACTOR WAS CRIT' CAL 744.0 744.0 130,726.3
- 93. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 744.0 127,1792
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,571,274 2,571,274 381,573,252
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 853,500 853,500 125,171,932
'8. NET ELECTRICAL ENERGY GENERATED (MWH) 831,810 831,810 120.270,350 PAGE 1 OF 2 I
-m m
.u.
m
.,m m._
_.m.
f OPERATING DATA REPORT (CONTINUED)
DOCKET NO.
50 - 278 DATE FEBRUARY 11,1997 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 %
100.0 %
65.6 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
100.0 %
65.6 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.3 %
102.3 %
59.6 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.9 %
' 99.9 %
~ 58.0 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
.0 %
10.4 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICALITY 08/07a4 INITIAL ELECTRICITY 0901/74 COMMERCIAL OPERATION 12/23/74 i
r t
=
f r
i PAGE 2 OF 2 i
~
_. -.. ~.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNfT 3 DATE FEBRUARY 11,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK i
BUSINESS SERVICES.
SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH JANUARY,1997 TELEPHONE (717)456-4383 i
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE t
TOTAL HOURS i
[
?
i i
(1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL FOR PREPARATION OF DATA i
B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
[
G -OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)
.