F

_d, Peach Bottom Attmic Power St:thn

_A_

~

PECO NUCLEAR nm -- c-1848 Lay Road A Unit of PECO Energy Delta, PA 17314 9032 717 456 7014 i

June 6,1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of May 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, (f L Mark E. Wamer Director, Site Engineering Peach Bottom Atomic Power Station MEW /Jbswa nt H;lph Enclosures cc:

B.W. Gorman, Public F,ervice Electric & Gas W.P. Dornsife, Commonweaith of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt USNRC, Senior Resident Inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center 18007G f

..ccn 96-14051 9606100706.960531 PDR ADOCK 05000277 g62 y

'R PDR r

l PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

j May 1996 um.2 During May the unit was at a lower power and lower efficiency due to coastdown. Unit 2 began the month at 94% power. On 5/9/96, the unit experienced losses due to turbine control #2 valve oscillations.

Unit 2 Net Generation for May was 705,664 MWH.

UNIT 3 Unit 3 began the month of May at 100% power. Unit 3 losses were minimal during the month. The losses included a load drop for A1&2 waterbox cleaning and rod pattern adjustment on 5/3/96 - 5/4/96. The unit remained at 100% power for the rest af the month until a load drop late on 5/31/96 began. The load drop commenced in order to work on: cleaning the MG set tube oil cooler and replacing the brushes, waterbox cleaning,3B Reactor Feed Pump, rod pattern adjustments, and MSIV testing.

Unit 3 Net Generation for May was 819,640 MWH.

c Attachment to Monthly Operating Report for May 1996 I

UNIT 2 REFUELING INFORMATION 4

1, Name of facility:

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 13,1996.

3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 12,1996.

4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

1,10CFR50 Appendix J, Option B

2. Increase MCPR Value 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Items 1 and 2 have been submitted for review and approval.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

GE-13 Fuel Product Line will be utilized requiring a Tech Spec amendment.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

i (a) Core -764 Fuel Assemblies (b) Fuel Pool-2436 Fuel Assemblies,52 Fuel Rods

~

~

Dock t No. 50-277 Attachment to Monthly Operating Report for May 1996 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2002 without full core offload capability.

September 1998 with full core offload capability.

Dockrt No. 50-278 Attachment to Monthly Operating Report for May 1996 tlNIT 3 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 12,1997 3.

Scheduled date for restart following refueling Restart following refueling scheduled for October 11,1997 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core-764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

O DockGt No. 50-278

~

Attachment to Monthly Operating Report for May 1996 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability, September 1999 with full core offload capability.

i j

.I

AVERAGE DAILY POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNtT 2 DATE JUNE 13,1996 COMPANY PECOENERGYCOMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISON PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4564383 MONTH MAY,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 1028 17 957 2

1028 18 912 3

1012 19 953 4

1012 20 940 5

987 21 931 6

1004 22 932 7

995 23 918 8

991 24 913 9

972 25 908 10 904 26 860 11 977 27 872 12 967 28 897 13 966 29 893 14 973 30 904 15 961 31 872 16 965

AVERAGE DAILY POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE ANE 13.1996 COMPANY PECO ENERGY COMPANY.

L P.HYDRICK

+

BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4564383 MONTH MAY.1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PCAVER LEVEL (MWE-NET)

(MYE-NET) 1 1106 17 1116 2

1114 18 1116 3

1073 19 1116 4

922 20 1111 5

1109 21 1116 6

1109 22 1112 7

1104 23 1106 8

1104 24 1110 9

1110 25 1105 10 1102 26 1105 11 1106 27 1109 12 1109 28 1111 13 1100 29 1102 14 1120 30 1125 15 1103 31 1086 16 1116

~.

... ~..

OPERATING DATA REPORT DOCKET NO. 50 -277 DATE JUNE 13,1996.

COMPLETED BY PECO ENERGY COMPANY

~ L P.HYDRICK

^

. BUSINESS SERVICES SITE SUPPORT DIVIS!ON PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456 4383 l

OPERATING STATUS -

1. UNIT NAME:_,,,,,,,,,,,,,,,,,,,,,,,,,, PEACH BO,TT,OM, UNIT 2 i

NOTES:

I.

2. REPORTING PERIOD:,,,,,,,,,,,,,,,,,,,..,,,,,,,, _ MA,Y.,1996, l
3. LICENSED THERMAL POWER (MWT):,,,,,,,

,,,,.,,,,,,,,,_, 3458_

4. NAMEPLATE RATING (GROSS MWE):,,,,,,,,,,,,,,,,,,,,,,,, 1221_
5. DESIGN ELECTRICAL RATING (NET MWE):,,,,,,,,,,,,,,,_,,,,,,11,19,
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):,,,,,,,,,,,,,,,,,1 159 -
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):,,,,,.,,,,,,,,,,,,,,1093
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) S!NCE LAST REPORT, GIVE REASONS; L
9. POWER LEVELTO WHICH RESTRICTED,IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,lF ANY:

t THIS MONTH YR-TO-DATE '

CUMULATIVE i

11. HOURS IN REPORTING PERIOD 744 3,647 192.047 12_ NUMBER OF HOURS REACTOR WAS CRmCAL 744.0 3,647D 126,242.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0

- 0.0 0.0

14. HOURS GENERATOR ON LINE 744 0 3,647.0 122,248 2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,263.133 12.075,058 369,651,101
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 733,500 3,984,900 121,524,690 i
18. NET ELECTRICAL ENERGY GENERATED (MWH) 705,664 3,865,571 116,671,466 4

PAGE 1 OF 2 s -

. -..~. - -

. - - _. _. ~ -.

m

.m._...

= -..

. OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

.50-277.'

s DATE'. JUNE 13s 1996 THIS MONTH YR-TOOATE -

CUMULATIVE..

- 19. UNIT SERVICE FACTOR 100.0 %

i100.0 % -

. 63.7 %

_ [

20. UNIT AVAILABitJTY FACTOR 100.0 %

' 100.0 % -

63.7 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 86.8 %

97.0 %

~ 57.5 %

22. UNIT CAPACITY FACTOR (USING DER NET) 84.8 %

94.7 %

56.7 %

23. UNIT FORCED OUTAGE RATE

.0 %

.O %

- 11.9 %

- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Refusing outage schedule t) begn 9/1196, Duration 37 days

25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

f

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

' FORECAST ACHIEVED INITIAL CRITICAUTY 09/16/73' i

INITIAL ELECTRICITY 02/18/74 COMAERCIAL OPERATION 07/05/74 ~

t b

6 L

1 s

t

.i l

?

i

. PAGE 2 OF 2 i

l OPERATING DATA REPORT DOCKET NO. 50 -278 DATE JUNE 13.1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT OtVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456 4383 OPERATING STATUS

1. UNIT NAME:,,,. _ _ _ _ _ _,,. _ _ _ _,,,,, _ _ _ PE,ACH BOTT_O,M _ UNIT 3 NOTES:
2. REPORTING PERIOD:.,,,,,,.. _ _ _ _, _ _,, _ _ _,, _, _ _,, MA,Y, 1996,
3. LICENSED THERMAL POWER (MWT):_ _ _ _ _ _,,_ _ _ _ _,_,.,,,,

3458_

4. NAMEPLATE RATING (GROSS MWE):. _ _ _ _ _ _ _ _ _ _ _ _,,, _ _ _, _ _ _ 1221,
5. DESIGN ELECTRICAL RATING (NET MWE):,_ _ _ _ _ _ _ _ _ _ _ _,,,_ _ _ _ _ 11_19,
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):. _ _ _ _ _ _ _ _,, _ _ _ _ _,1159_
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):.,,,,,,_ _ _ _ _ _ _ _ _ _ _1093
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 3.647 187,943
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3.647.0 124,9342
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON4_INE 744.0 3.597.0 121,4052
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,556.696 12.283,705 361,970.163
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 846.800 4.066.000 118.685,432
18. NET ELECTRICAL ENERGY GENERATED (MWH) 819.640 3.955.887 113,969.739 PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

50 -278 DATE JUNE 13.1996 THIS MONTH YR-TO-DATE CUMULA11VE

19. UNIT SERVICE FACTOR 100.0 %

98.6 %

64.6 %

20. UNIT AVAILABluTY FACTOR 100.0 %

98.6 %

64.6 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 100.8 %

99 2 %

58.4 %

22. UNIT CAPACITY FACTOR (USING DER NET) 98.5 %

96.9 %

56.8 %

23. UNIT FORCED OUTAGE RATE

.0 %

1.4 %

10.8 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, EST1 MATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY O&C7/74 tNITIAL ELECTRICITY 0901'74 COMMERCIAL OPERATION 12,"23/74 l

l i

l l

l l

PAGE 2 OF 2 l

t l-

- ~

~ - -. -. - - -.. -... ~. -.. -.- -.--.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCCIET NO. 50 -277 UNIT NAME PEACH BOTTOM UNIT 2 DATE JUNE 13.1996 COMPLETED BY PECO ENERGY CC$APANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVIS10N PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MAY,1996 TELEPHONE (717)4564383 METHOD OF UCENSEE SYSTEM. COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO t

NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5).

PREVENT RECURRENCE i

14 960505 F

9.0 H

4 ZZ 777777 MN GENERATION REQUEST FROM LOAD DISPATCHER I

15 960509 F

9.0 H

4 CC VALVEX TURBINE CONTROL VALVES OSCILLATIONS '

16 960518 F

12.0 H

4 ZZ 777777 MIN! MUM GENERATION REQUEST FROM LOAD l

DISPATCHER 17 960526 F

10.0 H

4 ZZ 777777 MINtMUM GENERATION REQUEST FROM LOAD DISPATCHER j

18 960527 F

12.0 H

4 ZZ 777777 MINIMUM GENERATION REQUEST FROM LOAD DISPATCHER TOTAL HOURS 52.0 i

(1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S-SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA l

B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE.

C - REFUEUNG 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

I D - REGULATORY RESTRICTION.

4 -OTHER (EXPLAIN)

FILE (NUREG4161)

E - OPERATOR TRAINING + UCENSE EXAMINATION i

F-ADMINISTRATIVE (5)

G -OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE l

H - OTHER (EXPLAIN) i

~

~

~.,....

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE JUNE 13.1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MAY,1996 TELEPHONE (717)4564383 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTNE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 12 960503 S

22.0 B

4 HC XXXXXX WATER BOX CLEANING AND RCD PATTERN ADJUSTMENT 13 960531 S

1.0 B

4 CD VALVEX MSIV TESTING, MG SET MAINT, RFP MAINT.

TOTAL HOURS 23.0 (1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S-SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG4161)

E - OPERATOR TRAINING + LICENSE EXAMIN ATION F-ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)

.