. , Peach Bottom Atomic Power Station l r
v l
, .PECO NUCLEAR nco tee,ov cemneo, 1848 Lay HcwJ A Unit of PECO Energy Delta. PA 17314-9032 717 456 7014 I
i June 9,1997 ;
U.S. Nuclear Regulatory Commission Docunient Control Desk l
Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen: i Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of May 1997 ,
forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4. i Sincerely, l
h%#
Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station
,% l MEW /MJM: cmc l Enclosures cc: W. T. Henrick, Public Service Electric & Gas l E. Salowitz, Public Service Electric & Gas )
W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric ;
A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station r
/
/,'l/ \
DO K O 277 R PDR. g j ccn 97-14036 \
l
, l 4' . PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
MAY 1997 UNIT 2 Unit 2 began the month at 100% power. On 5/18 a load drop occurred due to Hydraulic Control Unit Maintenance then returred te 100% power on 5/23. Another load drop occurred on 5/30 due to rod pattern adjustments, waterbox cleaning and MSIV stroking then returned to 100% power on 5/31.
Unit 2 Net Generation for May was 790,248 MWH.
UNIT 3 Unit 3 began the month at 100% power. On 5/4 a load drop occurred due to Hydraulic Control Unit Maintenance and retumed to 100% power on 5/15. A rod pattem adjustment was performed between 5/27 and 5/28 to improve the thermal limit margins. The Unit ended the month at 96.6% power.
Unit 3 Net Generation for May was 704,228 MWH.
l l
t
+
l Attachment to
. Monthly Operating Report for May 1997 l 1
l t
UNIT 2 REFUELING INFORMATION l
l 1. Name of facility:
Peach Bottom Unit 2
- 2. Scheduled date for next refueling shutdown:
Reload 12 is scheduled for September 15,1998.
- 3. Scheduled date for restart following refueling:
J Restart following refueling forecast for October 10,1998.
- 4. Will refueling or resumption of operation therefore require a technical specification change or otherlicense amendment?
N/A If answer is yes, what, in general, will these be?
N/A
- 5. Scheduled date(s) for submitting proposed licensing action snd supporting information:
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2720 Fuel Assemblies,52 Fuel Rods l
l l
. . _ . - =
, Docket No. 50-277 Attichmint to Monthly Operating
, Report for May 1997 ;
i Page 2 )
l
- UNIT 2 REFUELING INFORMATION (Continued) !
l l
(
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed !
storage capacity that has been requested or is planned, in number of fuel assemblies: !
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l l
l 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
l September 2002 without full core offload capability.
September 1998 with full core offload capability.
l i
l l
1
. _ . ._ = _.
i ",
Docket No. 50-278 l Attachm:nt to l i Monthly Operating i l , Report for May 1997 )
l UNIT 3 REFUELING INFORMATION !'
l
- 1. Name of facility:
I Peach Bottom Unit 3 l l l
l 2. Scheduled date for next refueling shutdown:
l Reload 11 scheduled for October 3,1997
- 3. Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 l ,
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
l- Yes.
If answer is yes, what, in general, will these be?
- 1. Wide Range Neutron Monitoring Modification 5395.
- 2. Large Primary Containment Purge and Vent isolation Valve Boot Seal Replacement Frequency Change.
- 3. ECCS/EDG Shutdown Specification Change.
- 4. Exclude MSIV leakage from 0.6 L..
l
- 5. Scheduled date(s) for submilling proposed licensing action and supporting information:
l j The first item has been submitted, including the response to an NRC RAl.
The other items are planned te be submitted by May,1997. j
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or i supplier, unreviewed design or performance analysis methods, significant changes in fuel design, I new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2485 Fuel Assemblies,16 Fuel Rods I
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed
. storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l l
l l
I
- .-. . .. . . . - . .. -- . .. ... .- ,- = - . . . -- .
- . Dock't No. 50-278 AttachmInt to l Monthly Operating
, Report for May 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) ,
I l
l
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity.
1 September 2003 without full core offload capability. l l
l . September 1999 with full core offload capability.
l '
i
(
t 1
i l
I r
l l
l l
4 e
I
AVERAGE DAILY POWER LEVEL *:
DOCKET NO. 50-Ti7 <
UNIT PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 -
- l' COMPT.NY PECO ENERGY COMPANY-L P. HYDRfCK i.
BUSINESS SERVICES SITE SUPPORT DMSION .
l PEACH BOTTOM ATOMIC POWER STATION !
TELEPHONE (717)4SEM383 I
MONTH MAY,1997 s
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) ;
1 1126 17 1126 2 1122 18 1014 j 3 1121 19 788 .
4 1126 20 775 5 1126 21 773 l 6 1118 22 777 7 1122 23 1026 8 1125 24 1119 9 1125 25 1119-10 1126 26 1120 l
. 11 1122 27 1120 12 1122 28 1120 ;
13 1126 29 1116 i4 ii26 30 111s 15 1118 31 851 16 1122 i
v - -en _
w - -,ve + _ ---w+m---weew.. gerT--'w-we-t-ew1* - -m>T LW-+wn-e---~w --- ----N 11-e-+r* eWee ei
t OPERATING DATA REPORT DOCKET NO. 50-277 DATE JUNE 5,1997 - -
COMPLETED BY PECO ENERGY COMPANY [
L P. HYDRICK g BUSINESS SERVICES ~ l SITE SUPPORT DIVISION !
PEACH BOTTOM ATOMIC DOWER STATION ,
t TELEOHONE (717) 456-4383 ,
OPERATING STATUS
- 1. UNIT NAME , PEACH _ BOTTOM UNIT 2 5 NOTES: !
- 2. REPORTING PERIOD: MAY. ,19._97..
L
- 3. LICENSED THERMAL POWER (MWT) 3458
- 4. NAMEPLATE RATING (GROSS MWE): 1221 i
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1119
- l 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _ ___1093 I
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS: !
t t
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE): !
i 1
- 90. REASONS FOR RESTRICTIONS,IF ANY: '
t 4
i l THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 3,623 200,807
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,623.0 134,538.5 i
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 3,623.0 130,400.2
$5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 .
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,444,203 12,307,486 394,283,088 j
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 811,800 4,099,400 129,588,990 ;
t
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 790.248 3,997,234 124,483,887 i
PAGE 1 OF 2
----. . . . , . ~ ~ . - - - - - - - - - - - . - - - - - - - - - - - - _ - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
OPERATING DATA REPORT (CONTINUED) ,
. u DOCKET NO. 50 -277 .
DATE JUNE 5,1997 l
THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 % 100.0 % 64.9 % t
- 20. UNIT AVAILABILITY FACT . 100.0 % 100.0 % 64.9 % ;
- 21. UNIT CAPACITY FACTC . , SNG MDC NET) 97.2 % 100.9 % 58 6 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 94.9 % 98 6 % 57.7 % ;
- 23. UNIT FORCED OUTAGE RATE .0 % .0 % 11.4 %
t
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- I
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 09/1&73 l INITIAL ELECTRICITY 02/1&74 COMMERCIAL OPERATION 07/05/74 '
2 L
t 1
5 1
PAGE2OF2 }
UNIT SHUTDOWNS AND POWER REDUCTIONS *J DOCKET NO. 50-277 '. ~
UNIT NAME PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 4 970518 S B 4 RB CRDRVE HCU MAINTENANCE (power reductm)
Duration shown only for shutdowns 5 970530 S B 4 HC XXXXXX WATER BOX CLEANING, ROD PATTERN ADJUSTMENT, MSIV STROKING (power reducton) duration shown only for shutdown TOTAL HOURS (1) (2) (3) (4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG4161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)
AVERAGE DAILY POWER LEVEL *-
DOCKET NO. 50-278 . !
UNIT PEACH BOTTOM UNIT 3 DATE JUNE 5,1997 -
- i COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES '
SITE SUPPORT DMSION '
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE - (717) 458-4383 MONTH MAY,1997 DAY AVdRAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) -l 1 1105 17 1097
- 1 2 1101 18 1089 3 1105 19 1085 4 937 20 1080 5 542 2*; 1073 6 540 22 1088 7 523 23 1080 8 540 24 1059 i i
9 571 25 1051 to 530 28 1043 11 588 27 1039 !
12 891 28 1068 :
i i 13 1054 29 1088 14 1102 30 1052 i i r 15 1097 31 1068 ,
16 1097 i
i i
l !
_ . _ . _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ - _ _ . . _ _ _ _ . . . . _ _ _ _ _ , . . . ~ . , , ._ _ _, . _ _ _ . _ _ _ ._. _
OPERATING DATA REPORT ,
DOCKET NO. 50-278 :'
DATE JUNE 5,1997 -
COMPLETED BY PECO ENERGY COMPANY i l L P. HYDRICK - l BUSINESS SERVICES '
SITE SUPPORT DMSION I PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 ,
i OPERATING STATUS ,
2 i
- 1. UNIT NAME: PEA...C. H. ..B.O. T..T..O..M. .. UNIT 3
- 2. REPORTING PERIOD: MAY,1,997
- 3. LICENSED THERMAL POWER (MWT). _ 3458 I
- 4. NAMEPLATE RATING (GROSS MWE): _ _ _ _ 1221
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1119
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 11_50 I t
7, MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093 !
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST RFPORT, GIVE REASONS: )
{
i 9 POWEF. LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE); i i
- 10. REASONS FOR RESTRICTIONS,IF ANY: l l
THIS MONTH YR-TO-DATE CUMULATIVE F
- 11. HOURS IN REPORTING PERIOD 744 3,623 196,703 i t
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,563.5 133,545.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 00 0.0 -I
! t
- 14. HOURS GENERATOR ON-LINE 744.0 3,551.0 129,988 2 I
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 00 0.0 I
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,224,147 11,519,184 390,521,162
[
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 726,100 3,785,500 128,103,932 f
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 704,228 3,683,005 123,121,545 l
I i
PAGE 1 OF 2 l
't OPERATING DATA REPORT (CONTINUED) ,
DOCKET NO. 50 - 278 . .-
DATE JUNE 5,1997 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 % 96.0 % 66.1 %
- 20. UNIT AVAILABILITY FACTOR 100.0 % 98.0 % 66.1 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 86.6 % 93.0 % 80.1 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 84.6 % 90.8 % 58.4 'n
- 23. UNIT FORCED OUTAGE RATE .0 % 2.0 % 10.3 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTl.YATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY O&t)7/74 INITIAL ELECTRICITY f.M)1/74 i
COMMERCIAL OPERATION 17/23/74
+
PAGE 2 OF 2
_ - _ _ _ . - - . _ - _ ___- _ - - ._- _ __-- - - _ _ _ _ - ___ _ _ _ __ - -_ _ - _.___ - ____-_-____- --_ =______-______ _ _. _ __ _- . - - _ _ _ _ _ _ .
UNIT SHUTDOWNS AND POWER REDUCTIONS *J l
r .*
DOCKET NO. 50-278
- UNIT NAME PEACH BOTTOM UNIT 3 *
- j DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES _
l SITE SUPPORT DMSION l PEACH BOTTOM ATOMIC POWER STATION l REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 i METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE '
TYPE DURATION REASON SHUTTING DOWN EVENT CODE. CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 6 970504 S B 4 RB CRDRVE HCU MAINTENANCE (power reducten) durshons shown only for shutdowns TOTAL HOURS I
i i
(1) (2) (3) (4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR UCENSEE l C - REFUELING 3- AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG-0161) .
E - OPERATOR TRAINING + LICENSE EXAMtNATION F- ADMINISTRATIVE (5)
G -OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE '
H - OTHER (EXPLAIN) L i