ML20132B948

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1996 for Peach Bottom Units 1 & 2
ML20132B948
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/30/1996
From: Hydrick L, Warner M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9612180027
Download: ML20132B948 (15)


Text

- - , - , - - . . . . . - . - -.-- _.._~..-_ ~..-._-----.-._ - - ...

,, Peach Bottom Atomic Power Station 4 i ,

PECO NUCLEAR eccoce 1848 Lay Road c - eev 1 A UNir or PECO ENrscy Delta. PA 17314-9032 i 717 456 7014  !

l.  !

December 5,1996 U.S. Nuclear Regulatory Commission '

Document Control Desk l Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen: -

t Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of November 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, i Y f flib/L/f Mark E. Wamer Director, Site Engineering

, Peach Bottom Atomic Power Station MEW /J :lph Enclosures cc: B.W. Gorman, Public Service Electnc & Gas W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electnc A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center-T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station L -

r; y

> t

- ccn 96-14093 I

9612190027 96113027 l PDR. ADOCK 0 R-

_ __ . _ = . ~... ... .- . - . . . . . - .

' t 1

4 bec: J. B. Cotton 638 Chesterbrook

, J. Lewis SMB3-7 -Peach Bottom

Commitment Coordinator 62A Chesterbrook l Correspondence Control Program 61B Chesterbrook i D. B. Fetters 62C Chesterbrook j E. J. Cullen S23 Main Office

, G. D. Edwards A4-1S - Peach Bottom

! A A Fulvio SMB4 Peach Bottom i G. A Hunger 62A Chesterbrook M. A Christinziano 52A Chesterbrook S. P. Focht, P.E. ANI S. Maingi PA DER C. J. McDermott S13 Main Office R.A.Khnkus 62C Chesterbrook D. M. Smith 63C Chesterbrook C. M. Valera 63C Chesterbrook M. E. Wamer SMB3 Peach Bottom

    • . I PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

NOVEMBER 1996 UNIT 2 Unit 2 began the month of November at 100% power. On 11/22/96 a planned load drop began in order to perform MSIV Testing, Condenser waterbox cleaning, and #6 CIV investigation. The Unit retumed to full power on 11/23/96 and remained at full power for the duration of the month.

Unit 2 Net Generation for November was 806,149 MWH. l l

UNIT 3 l

Unit 3 ran at 100% power for the entire month of November. l I

Unit 3 Net Generation for November was 804,994 MWH. '

I l

I l

. __ -- - . ~ - .- . - - - - - _-_- .

. 1

. , )

Attachment to Monthly Operating j Report for November 1996 UNIT 2 REFUELING INFORMATION 1

1

1. Name of facility: l 1

Peach Bottom Unit 2 I l

2. Scheduled date for next refueling shutdown:

1 Reload 12 is scheduled for September 15,1998.

3. Scheduled date for restart following refueling:

Restart following refueling forecast for October 10,1998.

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

N/A

5. Scheduled date(s) for submitting proposed licensing action and supporting information:
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or l supplier, unreviewed design or performance analysis methods, significant changes in fuel design,  !

new operating procedures:

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core-764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods l

k

~-- _- . . _ - . . . . = -. - . _ - .. .. -- .

Docket No. 50-277 i

Attachment to Monthly Operating Report for November 1996 Page 2 j UNIT 2 REFUELING INFORMATION (Continued) i j

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

l

9. The projected date of the last iefueling that can be discharged to the spent fuel pool assuming the present capacity-September 2002 without full core offload capabilit/.

September 1998 with full core offload capability.

I i

l

' ~I Docket No. 50-278 Attachment to Monthly Operating Report for November 1996 UNIT 3 REFUELING INFORMATION 1

, 1. - Name of facility: ,

Peach Bottom Unit 3

2. . Scheduled date for next refueling shutdown:

1 Reload 11 scheduled for September 12,1997

3. Scheduled date for restart following refueling Restart following refueling scheduled for October 11,1997
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing acbon and supporting information:
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) in the core and (b) in the soent fuel storage pool:

(a) Core-764 Fuel Assemblies (b) Fuel Pool- 2485 Fuel Assemblies,16 Fuel Rods

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

l The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

{

l Docket No. 50-278 i

Attachment to Monthly Operating Report for November 1996 Page 2 UNIT 3 REFUELING INFORMATION (Continued)

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity-September 2003 without full core offload capability.

September 1999 with full core offload capability.

l

..m.m...mm. _.__-m .. --. . _ . . . - . - . . _ _ . - . . . ~ . . . . . . . -.._m - .- _ . - . . . . . _ _ . . . . . . . . . - _ . . . . . _ ,

~

AVERAGE DAILY POWER LEVEL .

~

DOCKET NO. 50-277 -

  • UNIT PEACH BOTTOM UNIT 2
  • DATE DECEMBER 11,1996 COMPANY PECO ENERGY COMPANY -

L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 MONTH NOVEMBER,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (PEvVE-NET) (MWE-NET) ,

1 1119 17 1124 I

2 1114 18 1129 3 1116 19 1121 4 1116 20 1124 5 1116 21 1125 6 1116 22 1120 7 1116 23 1045 8 1118 24 1123 9 1120 25 1135 10 1116 26 1131 11 1120 27 1118 12 1121 28 1131 13 1129 29 1131 l 14 1120 30 1122 15 1124 16 1129 7

OPERATING DATA REPORT -

~

DOCKET NO. 50-277

  • DATE DECEMBER 11,1996 COMPLETED BY PECO ENERGY COMPANY ~

L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME: ._ _ . . ._ PEACH BOTTOM. UNIT 2 NOTES:
2. REPORTING PERIOD: _ _ _ _._ .. NOVEMBERt 1996
3. LICENSED THERMAL POWER (MWT): _ . _ . _,_ _ , . _

,_ ._3458

4. NAMEPLATE RATING (GROSS MWE): _... ___

._,1_221

5. DESIGN ELECTRICAL RATING (NET MWE): _ _ _ .

1119

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): _1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _ _ _ . _ . _ _ , _ . .

1093 G. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURSIN REPORTING PERIOD 720 8,040 196,440
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7,576.0 130,171.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 720.0 7,432.0 126,033.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,482,586 21,828,038 379,404.081
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 828,900 7.071,400 124,611,190
18. NET ELECTRICAL ENERGY GENERATED (MWH) 806,149 6,822,461 119,628,356 PAGE 1 OF 2

. . ~ . --- , . ~ . . . - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - _ - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - . - - - - - - - - - - --

1

~

OPERATING DATA REPORT (CONTINUED) ,_ ,; ,

t DOCKET NO. 50 -277 -

f t

DATE DECEMBER 11,1996 f l

i THIS MONTH YR-TO-DATE CUMULATIVE I

19. UNIT SERVICE FACTOR 100.0 % 92.4 % 64.2 %  :

(

4

20. UNIT AVAILABILITY FACTOR 100.0 % 92.4 % 64.2 %

21.. UNIT CAPACITY FACTOR (USING MDC NET) 102.4 % 77.6 % 57.6 %

22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 % 75.8 % 56.8 %

i

23. UNIT FORCED OUTAGE RATE .0 % 1.9 % 11.7 %

l t

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): i i

1 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: I

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED l INITIAL CRITICALITY 09/16,73 l

- INITIAL ELECTRICITY 02/18,74 .

COMMERCIAL OPERATION 07A)S/74 i l

[

4 j

i t

4 t

i I

PAGE 2 OF 2 t

UNIT SHUTDOWNS AND POWER REDUCTIONS .'

.O DOCKET NO. 50-277 ,

UNIT NAME PEACH BOTTOM UNIT 2 . i DATE DECEMBER 11,1996 COMPLETED BY PECO ENERGY COMPANY  ;

L P. HYDRICK l BUSINESS SERV!CES .

SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC PCWER STATION REPORT MONTH NOVEMBER,1996 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE F

TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) m REACTOR (3) REPORT 8 (4) (5) PREVENT RECURRENCE l

27 961122 S i 4 CD VALVEX MSIV testing. Watertxm Cing, CIV investig.

(power reduction)

TOTAL HOURS l

t I

(1) (2) (3) (4) [

F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL FOR PREPARATION OF DATA B -ICINTENANCE OR TEST 2- MANUAL SCRAM ENTRY SHEETS FOR LICENSEE ,

C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG-0161)  ;

E - OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATlVE (5)

G - OPERATIONAL ERROR (EXPLAIN) EXHIBIT 1 - SAME SOURCE j H - OTHER (EXPLAIN)  ;

_.___u __-._=..__-_-___-____.__-.--x._:- . _ . _ _ _ _ _ _ _ - _ _ - _ _ _ - _ - - _ _ - _ - - c._ _--- _ --._- _ ~ _ _ _ ____x _ _ . _ - -.-_ - - _ - _ - - - - -,

- t AVERAGE DAILY POWER LEVEL . l

. i r

~

DOCKET NO. 50-278 ,

UNIT PEACH BOTTOM UNIT 3 '

DATE DECEMBER 11,1996 i COMPANY PECO ENERGY COMPANY 'i I

L P. HYDRICK BUSINESS SERVICES l SITE SUPPORT DMSION

, PEACH BOTTOM ATOMIC POWER STATION l TELEPHONE (717)4564383 t

MONTH NOVEMBER,1996 '

i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4

(MWE-NET) (MWE-NET) t 1 1122 17 1122 2 1108 18 1123 3 1110 19 1115 4 1114 20 1119 5 1110 21 1121 6 1114 22 1134 7 1110 23 1113 I'

8 1112 24 1122 9 1118 25 1125 10 1114 26 1130 11 1118 27 1113 12 1116 28 1121 i 13 1122 29 1125 14 1114 30 1117 15 1118 16 1118

-. _ ~ _ _ _ . _ . _ _ .m_ . _ . _ _ _ _ _ _ . _ _ _ _ _ . _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - ..m.._ __-wr 2 m_ m _-m_-____ i _ _____ _i _.__ -_ - ._ .__ _ _ _ _ _ _ _ _ _ _ __ .

-. . . . . . . . - . - ~ . - . . - . - . ~ ~ . . .- . . ~ . - ~ - . . ... _ . . . .. .

OPERATING DATA REPORT ,

DOCKET NO.. 50 - 278 [ .

DATE DECEMBER 11,1996 COMPLETED BY PECO ENERGY COMPANY  !

L P. HYDRICK BUSINESS SERVICES [

SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456 4383

  • OPERATING 3TATUS i
1. UNIT NAME: . . . . . . . . . . . . DEA.C..H_.B..O. .TT._O..M_.U. _NI.T. 3 I
2. REPORTING PERIOD: ,,,_ _ NOVEMBER,1_996
3. LICENSED THERMAL POWER (MWT): 3458_ l
4. NAMEPLATE RATING (GROSS MWE): _., _.... _1221
5. DESIGN ELECTRICAL RATING (NET MWE): 1119
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159.. ,
7. MAXIMUM DEPENDABLE CACACITY (NET MWE): 1093  !
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE): I
10. REASONS FOR RESTRICTIONS,IF ANY:  ?

?

THIS MONTH YR-TO-DATE CUMULATIVE

?1. ROUR5 IN REPORTING PERIOD 720 8,040 192,336 i

12. tvuMBER OF HOURS REACTOR WAS CRITICAL 720.0 7,951.1 129,238.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 f
14. HOURS GENFRATOR ON-LINE 720.0 7,883.0 125.691.2
15. UNIT RET , 2 SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,488,644 26,768,797 376,455,254
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 828,800 8,851,900 123,471,332
18. NET ELECTRICAL ENERGY GENERATED (MWH) 804,994 8,598,630 118,612,482 i PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED) ,

DOCKET NO. 50 -278 DATE DECEMBER 11,1996 i

I THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 % 98.0 % fi5 * % i a
20. UNIT AVAILABILITY FACTOR 100.0 % 98.0 % 65.3 %

i

.- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.3 % 97.8 % 59.3 % ,

22. UNIT CAPACITY FACTOR (USING DER NET) 99.9 % 95.6 % 57.7 %
23. UNIT FORCED OUTAGE RATE .0 % 2.0 % 10.5 %
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 0807/74 INITIAL ELECTRICITY 0901/74 l COMMERCIAL OPERATION 12/23/74 i

, PAGE 2 OF 2

_ . - - _ . _ _ _ = _ _ _ . _ . - - - _ _ _ _ _ _ - _ - . _ _ _ _ - . . _ -_ _ _ w_ . -. -- w w

. . ~ . -

UNIT SHUTDOWNS AND POWER REDUCTIONS .'

DOCKET NO. 50-278 ,

- UNIT NAME PEACH BOTTOM UNIT 3 ,

DATE DECEMBER 11,1996 _

COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH NOVEMBER,1996 TELEPHONE (717)456-4383 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 23 961120 S H 4 RB CONROD Rod pottern adjustment (power reduction)

Duration shown only for shut downs TOTAL HOURS (1) (2) (3) (4)

F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUlPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C - REFUELING 3- AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G- OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)

. _ _ . _ _ _ _