Monthly Operating Repts for Dec 1996 for Peach Bottom 2 & 3
ML20133H612
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/31/1996
From: Hydrick L, Warner M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-10.001 NUDOCS 9701170232
Download: ML20133H612 (14)


Text

=

Peach Bottom Atomic Power Station d.

PECO NUCLEAR eccoco - c - ov 1848 Lay Road A Unit of PECO Energy Delta, PA 17314-9032 717 456 7014 6

I i

j January 6,1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of December 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, NM Mark E. Wamer Director, Site Engineering Peach Bottom Atomic Power Station MEW /JGH:1ph Enclosures cc:

W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector J. A. Isabella, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station d

' lf l

\\

con 97-14000 9701170232 961231 PDR ADOCK 05000277 R

pog

. _ _. _ _ _. _ _. ~ _. _.. _ _ _ _ _ _ _. _. _, _...

PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

j DECEMBER 1996 a

UNIT 2 i'

Unit 2 ran at 100% for the entire month.

j Unit 2 Net Generation for December was 858,400 MWH.

3 i

UNIT 3 Unit 3 started the month of December at 100% power. On 12/13/96 the unit came down in power for a l

planned rod pattem adjustment, waterbox cleaning, and MSIV testing. The Unit was retumed to 100%

power on 12/14/96. The Unit remained at 100% for the remainder of the month.

Unit 3 Net Generation for December was 847,100 MWH.

l 4

I i

I t

l Attachment to Monthly Operating Report for December 1996 UNIT 2 REFUELING INFORMATION 1.

Name of facility:

1

]

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 12 is scheduled for September 15,1998.

t 3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 10,1998.

4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supp!ier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies

. (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods

Docket No. 50-277 Attachment to Monthly Operating Repod for December 1996 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2002 without full core offload capability.

September 1998 with full core offload capability.

l i

Docket No. 50-278 Attachment to Monthly Operating Repod for December 1996 UNIT 3 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown.

Reload 11 scheduled for October 3,1997 3.

Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a)in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

Docket No. 50-278 Attachment to Monthly Operating Report for December 1996 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability.

AVERAGE DAILY POWER LEVEL r

DOCKET NO. b% 277 UNIT PELCH BOTTOM UNIT 2 DATE JANUARY 13,1997 COMPANY PEC;O ENERGY COMPANY L P. HYDRICK Bt'SINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4564383 MONTH DECEMBER,1996 s

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) r 1

1131 17 1127 2

1127 18 1127 3

1131 19 1127 4

1127 20 1131 5

1127 21 1123 6

1127 22 1131 7

1127 23 1131 8

1127 24 1119 9

1131 25 1115 i

10 1123 26 1127 11 1131 27 1127 t

12 1127 28 1123 13 1127 29 1127 14 1127 30 1123 15 1127 31 1123 16 1127 r

i l

OPERATING DATA REPORT DOCKET NO. 50- 277 DATE JANUARY 13.1997 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME:.... -.. -...

-.. -PEA...C.H. BO. T..TO.M U..N. IT. 2

2. REPORTING PERIOD:

_. _ DECEMBER,1996

3. LICENSED THERMAL POWER (MWT): _

,_3458

4. NAMEPLATE RATING (GROSS MWE):

122,1

5. DESIGN ELECTRICAL RATING (NET MWE): _ _ _ _ _ _ _,,

__1119

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___

1159

7. MAX 1 MUM DEPENDABLE CAPACITY (NET MWE):

_ 1093

8. IF CHANGES OCCUR IN CAFACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHlCH RESTRICTED,IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 8,784 197,184
12. N%oER OF HOURS REACTOR WAS CRITICAL 744.0 8,320.0 130,915 5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 744.0 8,176.0 126,777.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 00 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,571,499 24,399,537 381,975,580
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 858,400 7,929,800 125,469,590 S8. NET ELECTRICAL ENERGY GENERATED (MWH) 838.097 7,660,557 120,466,453 PAGE 1 OF 2

/

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

50 -277 DATE JANUARY 13,1997 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

93.1 %

64.3 %

20. UNIT AVAILABluTY FACTOR 100.0 %

93.1 %

64 3 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 103.1 %

79.8 %

57.8 %

22. UNIT CAPACITY FACTOR (USING DER NET) 100.7 %

77.9 %

569%

23. UNIT FORCED OUTAGE RATE

.0 %

1.7 %

11.7 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18,74 COMMERCIAL OPERATION 07/05/74 e

PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-277 UNIT NAME PEACH BOTTOM UNIT 2

[

DATE JANUARY 13,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSiON PEACH BOTTOM ATOMIC POWER STATION i

REPORT MONTH DECEMBER,1996 TELEPHONE (717)456-4383 i.

METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO 3

NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE l

t I

TOTAL HOURS i

t t

l L

(1)

(2)

(3)

(4) j F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA l

B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE

[

C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)

FILE (NUREG-0161) l E - OPERATOR TRAINING + LICENSE EXAMINATION i

F-ADMINISTRATlVE (5)

G - OPERATIONAL ERROR (EXPLA!N)

EXHIBIT I-SAME SOURCE l

H - OTHER (EXPLAIN)

AVERAGE DAILY POWER LEVEL DOCKET NO. 50-278 UNIT PEACH BOTTOM UNIT 3 DATE JANUARY 13,1997 COMPANY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 MONTH DECEMBER,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 1126 17 1122 2

1121 18 1126 3

1125 19 1118 4

1121 20 1126 5

1121 21 1118 6

1121 22 1122 7

1125 23 1130 B

1117 24 1114 9

1125 25 1118 10 1117 26 1126 11 1125 27 1122 12 1125 28 1122 13 1117 29 1126 14 733 30 1122 15 1106 31 1117 16 1118

...-.-_._....._._..._m..

.. m.- _.m._

._._.._.______.__._.___.....m..

i OPERATING DATA REPORT I

DOCKET NO. 50- 278

  • i DATE JANUARY 13.1997

[

COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERB 1CES SITE SUPPORT DIVISION f

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 1

i OPERATING STATUS l

1. UNIT NAME __. _, _.

.._ PEACH BOTTOM UNIT,3 I

NOTES:

2. REPORTING PERIOD:

__,,__, DECEMBER,j996

3. LICENSED THERMAL POWER (MWT):

_ _.3458, i

4. NAMEPLATE RATING (GROSS MWE):
1221,

[i

5. DESIGN ELFCTRICAL RATING (NET MWE):

1119 i

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

1159 r

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093 i

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

I

0. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

f!

10. REASONS FOR RESTRICTIONS,IF ANY:

}

i THIS MONTH YR-TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 8,784 193,080
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,69:).1 129,982.3 i
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 00 i

t

14. HOURS GENERATOR ON-LINE 7440 8,627.0 126,435.2 l
15. UNIT RESERVE SHUTDOWN HOUR $

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH) 2,546,724 29,315,520 379,001.978 i
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 847,100 9,699,000 124,318,432

[

t

18. NET ELECTRICAL ENERGY GENERATED (MWH)

. 826,059 9,424,688 119,438,540 t

t

[

PAGE 10F 2 i

OPERATING DATA REPORT (CONTINUED)

DOGETNO.

50 -278 DATE JANUARY 13,1997

~

THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

98.2 %

65.5 %

20. UNIT AVAILABILITY FACTOR 100.0 %

98.2 %

65.5 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 101.6 %

98.2 %

59.5 %

22. UNIT CAPACITY FACTOR (USING DER NET) 99.2 %

95.9 %

57.8 %

23. UNIT FORCED OUTAGE RATE

.0 %

1.8 %

10 5 %

[

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY 08/07R4 INITIAL ELECTRICITY 09/0164 COMMERCIAL OPERATION 12/23/74 PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-278

'+

UNIT NAME PEACH BOTTOM UNIT 3 DATE JANUARY 13,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH DECEMBER,1996 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWiJ EVENT CODt cout ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 24 961213 S

0.0 H

4 RB CONROD Rod Pattern AdjustmentrWaterbox Cing (power reduction)

Duration shown only for shut downs TOTAL HOURS 0.0 (1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

EXHIBITI-SAME SOURCE H - OTHER (EXPLAIN)

- - - - -