ML20129A987
ML20129A987 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 09/30/1996 |
From: | Hydrick L, Warner M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9610220298 | |
Download: ML20129A987 (14) | |
Text
, . _ __ _-
+; 1*
PeacnBott m AtomicPowcrStction
~
<- A v
PECO NUCLEAR e= =< c-1848 Lay Road A UNtrl#PECO ENrkcy Delta. PA 17314 9032 i 717 456 7o14 t
October 7,1996 U.S. Nuclear Regulatory Ccaudssion Document Control Desk Washington, D.C. 20555 Dor,ket Nos. 50-277 and 50-278
~
. Go.vdemen:
Enc'esbd is the monthly operating report for Peach Bottom Units 2 and 3 for the month of September 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, Nk Mark E. Wamer -
Director, Site Engineering i Peach Bottom Atomic Power Station !
d6N MEW /JGH:lph Enclosures i B.W. Gorman, Public Service Electric & Gas cc:
W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector i H.C, Schwemm, Atlantic Electric !
A.F Kirby,Ill, Delmarva Power & Light l INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station l 220104 9610220298 960930 DR ADOCK0500g7 p'
J.b gL[ I /
ccn 96-14079 i
-- A
PEACH COTTOM ATOMIC POWER STATION i NRC MONTHLY OPERATIONS
SUMMARY
l SEPTEMBER 1996 I
UNIT 2 :
Unit 2 began the month of September at 53% power. Prior to 2R11 Refueling Outage the average power for the month was 50.24%. The majority of the Megawatt losses prior to 2R11 were a result ,
of the Unit coastdown. In addition, there were minimallosses due to leaking valves. On 9/13/96 l the Unit came off-line to commence the Refueling Outage. !
Unit 2 net generation for September was 147,646 MWH. I i
, UNIT 3 I l
Unit 3 began the month of September at 100% power. Unit 3 Mega.vatt losses included a load drop for condenser water box cleaning on 9/11/96. The Unit remained at 100% power for the rest
, of the month.
Unit 3 net generation for September was 795,554 MWH.
1 I
4 1
h 1
J
Attachment to Monthly Operating Report for September 1996 UNIT 2 REFUELING INFORMATION
- 1. Name of facility:
Peach Bottom Unit 2
- 2. Scheduled date for next refueling shutdown:
Reload 11 began September 13,1996.
- 3. Scheduled date for restart following refueling:
Restart following refueling forecast for October 4,1996.
- 4. Will refueling or resumption of operation therefore require a technical specification change or other ,
license amendment?
Yes.
If answer is yes, what, in general, will these be?
1,10CFR50 Appendix J, Option B
- 2. Increase MCPR Value
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
Items 1 and 2 have been submitted for review and approval. NRC approval has been received.
- 6. Important licensing considerations associated with refueling, e g., new or drfferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
GE-13 Fuel Product Line will be utilized requiring a Tech Spec amendment.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core- 764 Fuel Assemblies (b) Fuel Pool- 2720 Fuel Assemblies,52 Fuel Rods
Docket No. 50-277 Attachment to Monthly Operating Report for September 1996 Page 2. ,
I UNIT 2 REFUELING INFORMATION (Continued)
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. :
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity: ,
September 2002 without full core omoad capability.
September 1998 with full core omoad capibility.
l l
, .~ ,
Dockit No. 50-278 Attachment to Monthly Operating Report for September 1996 ilNIT 3 REFUELING INFORMATION
- 1. Name of facility:
Peach Bottom Unit 3
- 2. Scheduled date for next refueling shutdown:
Reload 11 scheduled for September 12,1997
- 3. Scheduled date for restart following refueling Restart following refueling scheduled for October 11,1997
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, j new operating procedures:
N/A l
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2485 Fuel Assemblies,16 Fuel Rods
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: !
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
Dock".t No. 50-278 Attachment to Monthly Operating Report for September 1996 Page 2 ,
UNIT 3 REFUELING INFORMATION (Continued)
- 9. Tlw projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:- ,
September 2003 without full core offload capability.
September 1999 with full core offload capability.
AVERAGE DAILY POWER LEVEL '.
~
DOCKET NO 50 - 277 ,
UNIT PEACH BOTTOM UN!T2 DATE ' OCTOSER 8,1996 .
COMPANY PECO ENENGY COMPANY L P. HYDRfCK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOteC POWER STATION TELEPHONE - (717) 456-4383 MONTH SEPTEMBER,1996 DAY AVERAGE DAILY POWER LEVEL DAY- AVERAGE DAILY POWER LEVEL (MWE-NET) . (MWE-NET) 1 507 17 0 2 503 18 0 3 499 19 0 4 494 20 0 5 495 21 0 6 400 22 0 7 486 23 - 0 8 486 24 0' 9 406 25 0 10 490 26 0 11 478 27 0 12 479 28 0 13 361 29 0 14 0 30 0 15 0 16 0
AVERAGE DAILY POWER LEVEL '.
DOCKET NO 50-275 '
UNIT PEACH BOTTOM UNIT 3 DATE OCTOBER 8,1996 .
COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POFJ1 STATION TELEPHONE (717)4564383 MONTH SEPTEMBER,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1097 17 1114 2 1097 18 1113 3 1097 '19 1119 4 1093 20 1107 5 1097 21 1114 6 1097 22 1120 7 1097 23 1117 8 1101 24 1116 9 1097 25 1112 10 1089 26 1116 11 1037 27 1116 12 1102 28 1115 13 1110 29 1118 14 1107 30 1110 15 1109 16 1110
r OPERATING DATA REPORT .
DOCKET NO. 50 -277 . ,
DATE OCTOBER 8,1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456 4383 OPERATING STATUS
- 1. UNIT NAME _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _P_EACH BOTT_OM_ UNIT ;
NOTES:
- 2. REPORTING PERIOD: , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _SEPTEMB E_Rit_996,
- 3. UCENSED THERMAL POWER (MWT). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _3458
- 4. HAMEPLATE RATING (GROSS MWE): __ _ _ __ _ __ __ __ _ _ _ __ _ __ _ __ _ _ _ _ __1_221 S. DESIGN ELECTRICAL RATING (NET MWE): __________________________11_19
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): __________________ ,__1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): ,______________________1_093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVELTO WHICH RESTRICTED,IF ANY(NET MWE).
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6,575 194.975
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 310 0 6,165.0 128,760.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 00 00
- 14. HOURS GENERATOR ON-LINE 310.0 6,165.0 124,766.2
- 15. UNIT RESERVE SHUTDOWN HOURS 00 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MNH) 542,076 17,727,278 375,303,321
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 160,700 ~ 5,729,100 123,268,890
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 147,646 5,521,107 118.327,003 PAGE 1 OF 2
t OPERATING DATA REPORT (CONTINUED)
- DOCKET NO_ . 50 -277 DATE OCTOBER 8,1996 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR ' 43.1 % 93.8 % 64.0 %
- 20. UNIT AVAILABILITY FACTOR - 43.1 % 938% 64.0 % ~
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 18.8 % 76.8 % 57.4 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 18.3 % 75.0 % 56.6 %
- 23. UNIT FORCED OUTAGE RATE .0 % .0 % 11.7 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE. DATE AND DURATION OF EACH):
Refueling culage began 9f13/96 -
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP. 1004/96
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ~ ACHIEVED INITIAL CRITICALITY 09/16f73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07 2 /74
' PAGE 2 OF 2
. -_ _ _ . _ . _ , . _ . . . ~ _ . . - _ _ __ . . _ . . . _ ... .. . . ___ .
OPERATING DATA REPORT '
DOCKET NO. ' 50-278 ,
DATE OCTOBER 8,1996 COMPLETED BY PECO ENERGY COMPANY ,
L P. HYDRICK BUSINESS SERVICES .
SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION .
TELEPHONE (717)456-4383 OPERATINA TATUS
- 1. UNIT NAME: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _P_EACH BOTTO_M_U NIT 3 NOTES:
- 2. REPORTING PERIOD: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , , _ _ _ _ _ _ _ _ _ _ _ _ _SEPTEMB E_R 1_996 1
- 3. LICENSED THERMAL POWER (MWT). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _3458 4 NAMEPLATE RATING (GROSS MWE): __ ,____ ,___________ ______,, ,___1221,
- 5. DESIGN ELECTRICAL RATING (NET MWE): __________ ,_______________11_19
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ,____________________1159,
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____________________,_1_093, 8 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): i i
10 REASONS FOR RESTRICTIONS,IF ANY'.
THIS MONTH YR-TO-DATE CUMULATIVE t
- 11. HOURS IN REPORTING PERIOD 720 6,575 190.871 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,486.1 127,773.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 00 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 720.0 6,418.0 124,226.2 I
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,482,785 21,742,287 371,428,745
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 821,100 7,178,000 121,797,432
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 795.554 6,971,718 116,985.570 PAGE 10F 2
m .
A OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 278 DATE OCTOBER 8,1996
- THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 % 97.6 % - 85.1 %
- 20. UNIT AVAILABOUTY FACTOR 100.0 % 97.6 % 85.1 % -
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.1 % 97.0 % 59.0 % !
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98 7 % 94.8 % 57.3 % <
- 23. UNIT FORCED OUTAGE RATE .0 % 2.4 % 10.6 % -
t
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): ,
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
.26. UNITS IN TEST STATUS (PRIOR TO Cole 4ERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 0807/74 IAITIAL ELECTRICITY 0901/74 i COlm4ERCIAL OPERATION -12/23/74
)
i r .
t v
i' PAGE 2 OF 2 L
__._.u..m. _ _ _ . o__ . _ . ._______m.__,__.__m. . _ -_..m_ . _ _ _ - . _ _-__ _ _ _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _s c . ,, _ m h.~. , , i- ,--vv+- +% - - - , . .
UNIT SHUTDOWNS AND POWER REDUCTIONS '-
e
- DOCKET NO.' 50-277
- UNIT NAE PEACH BOTTOM UNIT 2
- DATE OCTOBER B.1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSM)N PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH SEPTEMBER,1996 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE -
TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 18 960913 S 410_0 C 2 ZZ 777777 Refuehng Outage-2R11 TOTAL. HOURS 410.0 T
l (1) (2) (3) (4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S-SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 -MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG4161)
E - OPERATOR TRAINING + LICENSE EXAMINATION
- F- ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN) EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN) i
_ _ _ _ . _ _ _ = _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ ., . . . . . . . . . - _ _ . - - .._
UNIT SHUTDOWNS AND POWER REDUCTIONS *o DOCKET NO. 50-278 *
- UN!T NAME PEACH BOTTOM UNIT 3 DATE OCTOBER 8,1996 - .
, COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH SEPTEMBER,1996 . TELEPHONE ' (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE' ACTION TO NO. DATE- (1) (HOURS) (2) REACTOR (3) REPORTS (4) (5) PREVENT RECURRENCE 20 960910 S 5.0 B 4 HC XXXXXX Condenser Walerta Cleenmg Reackr not shit down TOTAL HOURS 5.0 l
l (1) (2) (3) (4) l F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARAFA OF DATA B - MAINTENANCE OR TEST 2 -MANUAL SCRAM ENTRY SHEET S FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPCRT (LER)
D - REGULATORY RESTRICTION 4 -OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
, G- OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)
- l. _-_