8 Peach Bottom Atomic Powee Station A

PE,CO NUCLEAR r=-v a-v 1848 Lay Road A Usu or PECO EMRGY aP M2 g g January 8,1998 U.S. Nuclear Regulatory Commission a

Document Control Desk.

Washington, D.C. 20555 Docket Nos. 50-277 and 50-278

- Gentlemen:

Enclosed is the monthly operating report for Peach Bettom Units 2 and 3 for the month of December 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely.

)(4J[

A--

Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM:dmk Enclosures.

cc:

N.J. Sproul, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric A.F. Kirby, lil, Delmarva Power & Light INPO Records Center

- T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station 1210245 971231 i

y ( k e[ t

)i ADOCK 05000277 T

R PDR ccn 98-15000 ll ll ll I.ll.!.I.'ll.l! I.I.

+,,

  • w A h V *) l l

L

. ~.,

_. ~.

Peach Bottom Atomic Power Station' -

)

Unit 2 December 1 through December 31,1997

1. Narrative Summarv of ODeratino Experiences Unit 2 began the month of December at a nominal 100 % of rated thermal power

- (RTP).

On December 29,1997 at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, the unit was manually scrammed to repair the l

7-

- EHC back up pressure set amplifier.

Unit 2 ended this month operating at 0% RTP.

5 o

1 f

/

m w

gr

+.-

m

.-rin tw*

ei m,.

...wt e

e re1*'p

I Att: chm:nt to

^

Monthly Operating Report for December 1997 UNIT 2 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 2

- 2. '

Scheduled date for next refueling shutdown:

Reload 12 is scheduled for October 2,1998.

l 3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 30,1998.

4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment 7

-Yes if answer is yes, what, in general, will these be7

1. Wido Range Neutron Monitoring Modification 5395 to be issued du.ing 2R12.

2.

Cycle 13 Safety Limit MCPR Technical Specification change.

5.

Scheduled date(s) for submitting proposed hcensing action and supporting information:

1, Wide Range Neutron Monitoring has been submitted.

2.

Cycle 13 MCPR will be subm!t.ted 7/98.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or oerformance analysis methods, significant changes in fuel design, new operating procedures:

a.

Preliminary reload willinclude 292 GE13 bundles.

_ 7-The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core 764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods A

e

~

Docket No. 50-277 1

. Attachm:nt to.

_ Monthly Operating l

Report for December 1997 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 8.

.The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that.can be discharged to the spent fuel pool assumirig the present capacity:

September 2002 without full core offload capability.'

September 1998 with full core offload capability.

W i

l

w OPERATING DATA REPORT DOCKET NO. 50 -277 DATE. JANUARY 9,1998 COMPLETED BY. PECO ENERGY COMPANY D. Ai. KILGORE PLANT ENGINEERING ENGINEERING DMSiON PEACH BOTTOM ATOMIC POWER STATION -

TELEPHONE (717) 4~A-3412 OPERATING STATUS

1. UNIT NAME: _ _ _ _ _ _ _ _ _. _ _ _ _., _ _ _.. _ _ _ _ _. _ _ _ _ _ _ _ _,

__ _ _. _._ _.___.___ _ __ _ PEACH BOTTOM _ UNIT 2

2. REPORTING PERIOD: _ _ _ _ _ _. _. _. _ _ _ _ _ _,. _ _.. _ _ _ _ _ _ _., _ _ _ _ _ _. _. _ _ _ _._._.__ ___ __ DECEMBER,1997,
3. DESIGN ELECTRICAL RATING (NET MWE):

1119

4. MAXIMUM DEPENDABLE CAPACITY NROSS MWE):. _. _ _, _ _ _. _ _ _

1159

5. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____

_ _ ___ ____._ _1093, t -

THIS MONTH YR-TO-DATE CUMULATIVE

6. NUMBER OF HOURS REACTOR WAS CrtlTICAL 684.0 8,671 6 139J,x17.1
7. REAC TOR RESERVE SHUTDOWN HOURS 0.0 00 0.0
8. HOURS GENERATOR ON-LINE 684 0 8,663.0 135,440 2 9 UNIT RESERVE SHUTDC".N HOURS 00 0.0 00
10. NET ELECTRICAL ENERGY GEfJERATED (MWH) 759,387 9,570,344 130,036,797

-e.

m

+

w.

UNIT SHUTDC)WNS s

DOCKET NO. 50-2TT

UNIT NAME PEACH BOTTOM UNIT 2.

DATE JANUARY 6,t996 COMPLETED BY PECO ENERGY COMPANY '

J D. M. KILGORE E PtANT ENGINEERING --

ENGINEERING DMSiON PEACH BOTTOM ATOMIC POWER STATION

. - DECEMBER 1997

' TELEPHONE (717)456 3412

, REPORT MONTH METHOD OF CAUSE AND CORRECTIVE.

. TYPE' DURATION REASON.

SHUTTING DOWN ACTION TO -

NO.

DATE'

,(1)'

(HOURS)

(2)

REACTOR (3) -

PREVENT RECURRENCE '

i

9-971229 S-60 0 -

B 2

REACTOR POWER WAS REDUCED TO 'O %' FOR EHC BACKUP :-

PRESSURE SET AMPLIFIER REPAIR '

TOTAL HOURS '

60.0 i

t t

i i

l Z

(1)

(2)

(3)-

l F-FORCED REASON METHOO S - SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL B - MAINTENANCE OR TEST 2-MANUAL SCRAM C - REFUELING 3-AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)..

=

E-OPERATOR TRAWtNG + LICENSE EXAMINATION -

i F - admit 41STRATIVE G OPEFtATIONALERROP(EXPLAIN)

H - OTHER (EXPLA:N) 2, s

. c. ~.

_~

P;ach Bottom' Atomic Power Station UnK3' December 1 through December 31,1997 1.

Narrative Summarv of Ooeratina Experiences Unit 3 began the month of December at 0% of rated thermal power (RTP) due to "E" SRV leak epair.

On De cember 2,- 1997 'at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> the Unit reached 94% of RTP. Yhe Unit was held at 94% RTP due to Jet pump riser weld cracking indications.

s On Decen,ber 7, at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the unit was reduced to 62% power for condenser tube leak inspections. The Unit was raised to 94% on December.7, at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />.

The unit was maintained at 94% RTP due to jet pump riser weld cracking indications.

On December 10, at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the unit was reduced to 60% power for condenser tube leak inspections. The Unit was raised to 94% on December 11, at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />.

The unit ended the month of December operating at 94% power.

4 4$ _k a

~

. L.

Dockit No. 50 278 Attachm:nt to

~

~

Monthly Operating Report for December 1997-t UNIT 3 REFUELING INFORMATION 1.

Name of facility:

j Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:-

Reload 12 scheduled for October 1,1999 3.

Scheduled date for restart following refueling Restart following refueling scheduled for Noveraber 1,1999 4.

Will refueling' or resumption of operation thereafter require a technical specification change or other license amendment?

N/A if answer is yes, what, in General,'will these be?

5.

All items have been submitted, 8.

Important licensing considerations associatec

'h refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

(a) The 292 new 3R11 bundles are GE 13 design new to Unit 3 7.

The number of fuel assemblies (a) in the cose and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblics (b) Fuel Pool 2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)

( one of the 2777 is a skeleton which contains less than a full complement of fuel rods) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity ' as been relicensed for 3819 fuel assemblies.

h i

i.-

)

Docket N;. 50-278 Att chment to.

Monthly Operating.

Report for December 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool ossuming.

the present capacity:

September 2003 without full core offload capability.

~

September 1999 with full core offload capability, s

3 g

s

-. ~.......

~

. o -...y.; s --

,,b-'

>y 12 J

- OPERATING CATA REPORT r

i

.v..

r

~

j DOCKET NO. > 50 -278 -

m DATE ;- JANUARY 6,1995 '.

' COMPLETED BYf PECO ENERGY COMPANY

-D. M.10LGORE PLANT ENGINEERING a.,

ENGINEERING DIVISION '

PEACH BOTTOM ATOMIC POWER STATION' 7

TELEPHONE. (717) 456 3412 "i

.- OPERATING STATUS..

1. UNIT t.AMEL,_.-

... _ _ ~..-__. _._ _. - _ _. _ _ _ _. _ _ <, _ _ _ _.,

PE. A.CH,B_OT_T..OM U..N. _IT_3 "

r

2. REPORTING PERIOD:

,, _.__._ DECEMBER,1997,.

3. DESIGN ELECTRICAL RATING (NET MWE):.

1119 "

4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE). _ _, _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _. _ _ _

11159

5. MAXIMUM DEPENDABLE CAPACITY (NET MWE): -_ -.

_.____..._.___.-.0_93_.

1 THIS MONTH YR-TO-DATE CUMut.ATIVE "

6.' NUMBER OF HOURS REACTOR WAS CRITICAL 744 0 7.971.6

' 137,953.9

7, REACTOR RESERVE SHUTDOWN HOURS 00 0.0

- 0.0 I

' 8. ' HOURS GENERATOR ON-LINE 730 0 7.909.0

)134.344.2'-

-9. UNIT RESERVE SHUTDOWN HOURS

" 0.0 0.0 0.0

10. NET ELECTRICAL ENERGY GENERATED (MWH) 741,069 7,506.581

..127,005,122-.

1 i.

L 1

b h

)

i r-r.,..

-, - -,c y

,w%

4, m-~...

e w

...-n

,....>m.

..#.s

g-4

,v

-x

.y

-u 3,

. y' ' '

M

'.l 4 I84 DOCKET NO.I 50-278 T c.

, ' UNIT NAME PEACH BOTTOM UhlT3.

DATE : JANUARY 13,1998 2 r

l --

COMPLETED BY' PECO ENERGY COMPANY -

~. >

'4;'";

.c

- D. M. IGLGORE

.f PLANT ENGINEERING '

ENGINEERtNG DMSION

. PEACH BOTiOM ATOhDC POWER STATION i ' C:

- REPORT MONTH

DECEMBER,1997.

T5.LEPHONE (717)4E3412 -

METHOD OF L CAUSE AND CORRECTIVE -

1 TYPE ;--

DURATION REASON SHUTTING DOWN ACTION TO NO.)

DATEE

{ (1)

(HOURS)

(2)

REACTOR (3)

PREVENT RECURRENCE 3

.12.

hJ71201 S

. ~ 14 0 A'

2

  • E* SRV Laak' Repair -
TOTAL HOURS..

'14.0 E- '

4 (1)

(2)

  1. 3) '

F-FORCED REASON-METHOD S-SCHEDULED A-EQUPMENT FAILURE (EXPLAIN).

1 - MANUAL B -MAINTENANCE OR TEST 2-MANUAL SCRAM '-

. C-REFUEUNG-

' 3-AUTOMATIC SCRAM -

D-REGULATORY RESTRICTION 4 - OTHEP (EXPLAIN) -

E - OPERATOR TRAINING + UCENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) -:

. H - OTHER (EXPLAIN) m. -

..a

.