ML20203J731

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1997 for Pbaps,Units 2 & 3
ML20203J731
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/30/1997
From: Dunning E, Warner M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9712220062
Download: ML20203J731 (15)


Text

Peach Bottom Atomic Pmwer Ctation' ,

s..g_ "

RECO! NUCLEAR nm ~v c-1848 Lay Road -

A Unit of PECO Energy! Na gPAj7314 oo32.

December 4,1997 U.S. Nuclear Regulatory Commission Document Control Desk

- Washington, D.C. 20555 Docket Nos. 50-277 and 50-278-

' Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of November

~ 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1,

' Revision 4.

' Sincerely,-

r r

t Mark E. Wamer Director, Site Ecgineering Peach Bottom Atomic Power Station

../ '

- MEW /M JM:dmkg') n %

Enclosures ' pdW

. cc: N.J. Sproul, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P, Domsife, Commonwealth of Pennsylvania

- R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric -

A.F. Kirby,'ll!, Delmarva Power & Light INPO Records C6nter '

T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station

/

f 39&) I -

/

ccn 9714071'- , l i,

. . , a n ['; '.2 0 9712220062 971130~

PDR .ADOCK 05000277'

' R :. PDR. ,

Pc:ch Bottom Atomic Power St tion

) .

Unit 2 November 1 through November 30,1997

1. Narrative Sy_q1 mary of Operatina Experiences Unit 2 began the month of November at a nominal 100 % of rated thermal power (RTP).

On November 5,1997 at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, power was reduced to 04% of RTP for SB Feedwater Heater steam leak repair. Power was restored to 100% on November 7,1997 _

at 000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.

On November 9,1997 at 15:25 U/2 automatic scram occurred due to loss of DC voltage during swap nf battery chargers. Power was restored to 100% on November 11, at 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.

Unit 2 ended this month operating at 100% RTP.

i

l - Attichm:nt to Monthly Operating Report for November 1997

_ UNIT 2 REFUELING INFORMATION

1. Name of facility.

Peach Bottom Unit 2

2. Schcduled date for next refueling shutdown:

Reload 12 is scheduled for October 2,1998.

3. Scheduled date for restart following refueling:

Restart following refueling forecast for October 30,1998.

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

N/A

5. Scheduled date(s) for submitting proposed licensing act:an and supporting information:
6. Important licensing consi-le ations associated w3 refueling, e.g., new or Efferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

w

7. The number of f.iel assemblies (a) in the core and (b) in the spent fuel storage pool:
a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2720 Fuel Assemblies,52 Fuel Rods

-- _ - ii ._ _.___ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ . . _ . _ _ . _ _ _ . _ _ _ _ _ _ _

Dock:t No. 50-277 Attrchm:nt to Monthly Operating Report for November 1997 Page 2 UNIT 2 REFUEt ING INFORMATION (Continued)

8. The present licensed spent fuel pool storage capacity and it a size of any increase in licensed storage capacity that has been requested or is plan.1ed, in number of fuel assemblies:

The spent fuel pool t,torage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2002 without full core offload capability.

September 1998 with full core of00ad capability.

l

AVERAGE DAILY POWER LEVEL

' DOCKET NO. 50-277 UNIT PEACH BOTTOM UNIT 2 DATE DECEMBER 3,1997 '

COMPANY PECO EN"EGY. COMPAf#

f E. A. DUNNING , l.

BUSINESS SERVICES

$1TE S'JPPORT DMSION '

PEACH BOTTOM ATOMIC FCWER STATION ~

TELEPHONE (717)456-3412 MONTH NOVEMBER,1997 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL DAY (MWE-NET) (MWE-NET) l 1119 17 1123 1

2 5113 18 1122 3 1117 19 1127 l

4 1123 20 1114 1120 21 1130 5

6 1072 22 1126 7 1125 23 1122 8 1120 24 1126 9 720 25 1118 to 0 26 1122 11 322 27 1126 <

12 962 28 1121 13 1094 29 1116 14 1127 30 1120 15 1122 16 1122

l OPERATING DATA REPORT DOCKET NO.53-277 '

DATE DECEMBER 3,199' . ~

COMPLETED BY PECO ENERGY COMPANY

  • E. A. DUNNING BUSINESS SERVICES * -

SITE SUPPORT DMSION PEACH BOTTOM ATOM)C POWER STATION TELEPHONE (717) 726-3412 OPERATING STATUS . _.

1. UNIT NAME: _ _ _ . _ _ _ _ . _ _ . . . _ . _ - . _ .. _ _ . .. _ _ _ ~ _ . P. EA._CH BO. TT..OM.U. NI.T. 2. .
2. REPORTING PERIOD:, _ _ . _ . _ _ _ _ _ _ _

_ _ NOVEMBER,1997,

3. LICENSED THERMAL POWER (MWT): _ . _ _ _ _ _ __. __ _ _ _ _ __3458_

4 NAMEPLATE RATING (GROSS MWE): _ _ _ . _ _. . _ _ . _ _ _ 1221

5. DESIGN ELECTRICAL RATlHG (NET MWE): __ ___ _._ _ _ _ __.__ __. .____ _1119
6. MAXIMUM DEPENDABLE CAPAC!TY (GROSS MWE): _ _.,_ __. _ _ _._ _ 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET IME): 1093
8. IF CHANGES OCCUR IN C,. .ATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VvHICH RESTRICTED, IF ANY (NET MWE):

M REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE 720 8,016 205,200

11. HOURS IN REPORTING PERIOD 691.6 7,987.6 138,903.1
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 0.0
13. REACTOR RESERVE SHUTDOWN HOURS 683 0 7,979 0 134,756 2
14. HOURS GENERATOR ON-LINE -

l 0.0 0.0 0.0

15. UNIT RESERVE SHUTDOWN HOURS 3,049,987 28,007,942 409,983.522
16. GROSS THERMAL ENERGY GENERATED (MWH) 766,200 9.044,500 134,514,090
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 745,978 8,810,958 129,277,410
18. NET ELECTRICAL ENERGY GENEhATED (MWH) l PAGE 1 OF 2

~

+

, w

- e-

. s.

s m

. n- s . . -v-m

.. 4 4

..-s - - , - m - ~ .

+.. .,

su

  • 1 OPERATING DATA REPORT (CONTINLED) ',j 1 . . . . . ....

t , '

i

< DOCKET NO.. !50 - 277 : sJ i .p DATEi DECEMBER 3.1997 - TC

.s. , ;

fa

  • L THIS MONTH L YR-TO-DATE ' ' CUMULATNE

~

i 19. UNIT SERVICE FACTOR .. , - 94.9 % ,. .

99.5 % ' 95.7 % ; ..

20. UNIT AVAILABILITY FACTOR
94.9 % ' 99.5 % ' '

05.7 % ' ~ -

~

H 21.- (THIT CAPACITY FACTOR (USING MDC NET) ' 94.8 % 100.6 %- . 59.5 % '

L 22. UNIT CAPACITY FACTOR (USING DER NET) ' . 92.6 % 98_2 % - J. 58.5 % ,

' 23. UNIT FORCED OUTAGE RATE - 5.1 % .5 % - r t 11.1 %'-

- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS' (TYPE, DATE AND DURATION OF EACH):

. . i 1

25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP
;
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST' ACHtEVED

' INITIAL CRITICAUTY 09/16/73 -

INITIAL ELECTRICITY

. 02/18/74

, COMMERCIAL OPERATION - 07/05/74 -

r 1

i- ,

,, l i

, , PAGE 20F 2h 1

w ~m < . , . , < -

.v~- v,v 4, s..4,- , g g 1 ,u..., 4 , -n. -.n.,.4 ...w,,. ++w-- ,m ,. wN-e . s,se,- ..w , m .s

l. UNIT SHUTDOWNS AND POWER REDUCTIONS

. DOCKET NO. 50-277 )l

' UfET MAME PEACH BOTTOM UNIT 2 '

DATE DECEMBER 3,1997 - .

COMPLETED BY PECO ENERGY COMPANY -

E. A. DUNNING BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMC POWER STATION REPORT MONTH NOVEMBER,1997 TELEFHONE (717)456-3412

{ METHOD OF L!CENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE REASON. SHUTTING DOWN EVENT CODE CODE ACTION TO TYPE- DURATION REACTOR (3) REPORT # (4) (5) FREVENT RECURRENCE NO. DATE (1). (HOURS) (2)

H 3 BATTRY less of DC voltage during swap of battery chargers f Q 971109 F 37.0 TOTAL HOURS 37.0 l

I l

l l

l (2) (3) (4)

(1)

REASON METHOD EXH! BIT G-INSTRUCTIONS l F-FORCED FOR PREPARATION OF DATA A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL l- S- SCHEDULED B - MAINTENANCE OR TEST 2- MANUAL SCRAM ENTRY SHEETS FOR UCET.SEE C - REFUEUNG 3- AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY l" STR!CTION 4- OTHER (EXPLAIN) FILE (NUREGC81)

E - OPERATOR TRAINING + LICENSE EXAMINATION l

F ADMINiSTRATMI (5) i- EXHIBIT I-SAME SOURCE l G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

l P: ch Bottom Atomic Power St tion Unit 3 November i through November 30,1997

1. Narrative Summary of Operatina Experiences Unit 3 began the month of November at 0% of rated thermal power (RTP) due to refueling 4 outage.

On November 8,1997 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the Unit reached 93% of RTP. The Unit was held at 03% RTP due to jet pump riser weld cracking indications. The Unit was raised to 100% on November 12 at 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.

On November 14,1997 at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit was reduced back to 93% of RTP due to jet pump riser weld cracking indications.

On November 28,1997 at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> the Unit was manually shutdown to repair the "E" Steam Relief Valve. The Unit remained shutdown throughout the remainder of the month.

l .

Dock;t No. 50-270 I Attichment to Monthly Operating Report for November 1997 UNIT 3 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 3 2, Scheduled date for next refueling shutdown: :s Reload 11 scheduled for October 3,1997 is in progress

3. Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A 4

If answer is yes, what, in general, will these be?

5. All items have been submitted.
6. Important licensing considerations ass (clated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performa nce analysis methods, significant changes in fuel design, new operating procedures:

(a) The 292 new 3R11 bundles are GE 13 design new to Unit 3

7. The number of fuel assemblies (a) in the core and (b)in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)

( one of the 2777 is a skeleton which contains less than a full complement of fuel rods)

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies-The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

l 1

  • : Docket No ' 50-278

. ' Attachment 13 :

-- + . Monthly Operating --

Repon for November 1997  ;

Page 2 7 4 4 UNIT.3 REFUELING INFORMATlON (Continued)-

= 9. - The projected date of the last refueling that can be discharged to the spent fuel pool assuming .-

- the present capacity: ,

G ptember 2003 withcut full core offload capability,

  • a September 1999 with full core offload capebility.  !

1 t

7

. t t

't h'

Y W

i w -

-e + w

AVER".GE DA!LY POWER LEVEL DOCKETNO. 50-278 UNIT PEACH BOC UNIT 3 DATE Dr EMegg. jg7 - "

COMPANY PECO ENEnuY COMPANY '*

E. A. DUNfilNG BUSINES$ SERVICES SITE SUPPORT D' VISION .

PEACH BOTTOM ATOMC POWER STATION TELEPHONE (717)4560412 MONTH NOVEMBER,1997 AVERAGE DA!LY POWER LEVEL DAY AVEP. AGE DAILY POWER LEVEL DAY (MWE-NET) (MWE-NET) 0 17 1039 .

1 37 18 1039 2

1'J5 19 1039 3

4 491 20 1027 938 21 1048 l 5 941 22 1038 6

1044 23 1037 7

24 1041 8 1040 25 1033 9 1042 i

1025 25 1038 10 11 1038 27 1042 1105 28 741 12 13 1112 29 0 14 1104 N O 15 1031 16 1044

OPERATING DATA REPORT DOCKET NO 50- 7/8 CATE DECEMBER 3,1997 -

COMPLETED BY PECO ENERGY COM'ANY E. A. DUNNING BUS.* NESS SERVICES

  • SITE SUP' ORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-3412 l

l OPERATING STATUS l

1. UNIT NAME: _ _ _ _ _ . __, ,

_, _ ._ _ , _ PEACH BOTTOM U. NIT 3 NOTES:

NOVEMBER,1997_

2. REPORTING PERIOD: _ . _ _ _ ___ _ _ _ _ . _ _ _
3. LICENSED THERMAL POWER (FENT): __ ._ _ ._

_3458 1221,

4. NAMEPLATE RATING (GROSS MWE): ____ _ _ . . . . _ _ . . _ __
5. DESIGN ELECTRICAL RATING (NET MWE): ___ _ . _ _ _ ___ __

_111,9

_ _ _ _ _._1159

' 6. MAX' MUM DEPENDABLE CAPACITY (GROSS MWE): _ _ . _

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): ___ __ __

,_ _1093

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):

10 REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE 720 8,016 201.096

11. HOURS IN REPORTING PERIOD 667.1 7,227.6 137,209.9
12. NUMBER OF HOURS REACTOR WAS CRITICAL 00 0.0 0.0
13. REACTOR RESERVE SHUTDOWN HOURS 631.0 7,179 0 133,614 2
14. HOURS GENERATOR OrJ-LINE 0.0 0.0 0.0
15. UNIT RESERVE SHUTDOWN HOURS 1,903.121 21,925,404 400,927,382
16. GROSS THERM *'. ENERGY GENERATED (MWH) 624,700 7,043,100 131,361,532
17. GROSS ELECTRICAL ENERGY GENERAT ED (MWH) 607,756 6,825,513 126.264,053
18. NET ELECTRICAL ENERGY GENERATED (MWH)

PAGE 1 OF 2

m. -

- lv.

- u > c

.{

  • -r- -

OPERATING DATA REPORT (CONTir1UED) .. . .

,._ r ' '

.g --

' DOCKET NO. . 50 -278 --

._m DATE " DECEMBER 3.1997 ;

3

THIS MONTH ~ YR-TCMMTE . CUMULATNE L- ' r .19.. UNIT SERVICE FACTOR .- 87.6 % 89.6 % es.4 %;

i .20. UNIT AVAlt.ABluTY FACTOR ' 87.6 % - 89.6 % . 66.4 %

L 21. UNIT CAPACITY FACTOR (USING MDC NET) - 77.2 % - 77.9 % 60.2 %

! 22. ' UNIT CAPACITY FACTOR (USING DER NET) ' 75 4 % ~ 76.1 % ' 56.6 %

- 23. UNIT FORCED OUTAGE RATE - .0 % 1.0 % 10.0 %

' 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

L 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP; -

^

f 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPEPATIONS): -FORECAST ACHIEVED L INITIAL CRITICALITY 0807/74

' !NmAI. ELECTRICITY 0001/74

' COMMERCIAL OPERATION -12/23/74 '

l 1

' PAGE'2"OF 2 .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-278 ,

UNTT NAME PEACH BOTTOM UNIT 3 DATE DECEMBER 1't,1997 .. ,

COMPLETED BY PECO ENERGY COMPANY .

E. A. DUNNING BUSINESS SERVICES ^

SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4563412 REPORT MONTH NOVEMBER,1997 SYSTEM COMPONEht CAUSE AND CORRECTIVE METHOD OF LICENSEE CODE CODE ACTION TO l

REASON SHUTTING DOWN EVENT TYPE DURATION (5) PREVENT RECURRENCE .

f REACTOR (3) REPORT 8 (4)

NO. DATE (1) (HOURS) (2)

ZZ 777777 Refuehng Outage S 34 3 C 2

'10 971101 RA PUMPXX Jet pump riser weld cracidng 0.0 H 4 (duration shown enfy for shutdown) 11 971108 S CC VALVEX T SRVieelong S 55 0 A 2 (durabon to shown only for shutdown)

I 12 971128 TOTAL HOURS 89 0 (3) (4)

(1) (2)

METHOD EXHIBIT G-INSTRUCTIONS F-FORCED REASON 1-MANUAL FOR PREPARATION OF DATA S - SCHEDULED A -EQUIPMENT FAILURE (EXPLAIN) 2- MANUAL SCRAM ENTRY SHEETS FOR UCENSEE B- MAINTENANCE OR TEST 3- AUTOMATIC SCRAM EVENT REPORT (LER)

C - REFUELING FILE (NUREG4161) ,

4- OTHER (EXPLAIN) '

D - REGULATORY RESTRICTION E - OPERATOR TRAIN!NG + LICENSE EXAMINATION (5)

F- ADMINISTRATIVE EXHIBIT I- SAME SOURCE G- OPE ~4TIONAL ERROR (EXPLAIN)

H - OTHE". (EXPtAIN)

. -. .. .. .. , . ..