NRC MONTHLY OPERATIONS
SUMMARY
l December 1995 l
UNIT 2 i
l Unit 2 shut down on December 1 for a planned maintenance outage. Major work activities included repairs to the "A" condensate pump, the "A" reactor feed pump, the "5B" feedwater heater, and a main steam relief valve. The unit was retumed to service on December 8. The unit operated at 100%
power for the rest of the month except for a load drop for a rod pattern adjustment made on December 14.
l UNIT 3 ;
Unit 3 began the month of December at 100% power. Unit 3 automatically scrammed on December 2 as a result of a main turbine trip. The unit was returned to service on December 6 and operated at 100% power for the rest of the month.
l 1
J l
I 9601230376 960115 PDR ADOCK 05000277 R PDR
i
. ,, Att2chment to Monthly Operating
. Report for December 1995 UNIT 2 REFUELING INFORMATION
- 1. Name of facility:
Peach Bottom Unit 2
- 2. Scheduled date for next refueling shutdown:
Reload 11 scheduled for September 15,1996.
- 3. Scheduled date for restart following refueling:
Restart following refueling forecast for October 20,1996.
- 4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A
- 6. Important Ilcensing considerations associated with refuel!ng, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: !
N/A
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool-(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods 1
Docket No. 50-277 Att:chment to
. Monthly Operating Report for December 1995 Page 2 UNIT 2 REFUELING INFORMATION (Continued)
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2004 without full core offload capability.
September 1998 with full core offload capability.
1 l
1 l
. ,, Docket No. 50-278 Attachment to
. Monthly Operating Report for December 1995 UNIT 3 REFUELING INFORMATION i
- 1. Name of facility:
Peach Bottom Unit 3 I
Scheduled date for next refueling shutdown:
2.
Reload 11 scheduled for September 15,1997
- 3. Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1997
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be? l l
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information. i l
l
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or l supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies '
(b) Fuel Pool- 2201 Fuel Assemblies,6 Fuel Rods :
I
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: j The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. ,
l i
. . Docket No. 50-278 Attachment to
. Monthly Operating Report for December 1995 Page 2 UNIT 3 REFUELING INFORMATION (Continued)
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
September 1999 with full core offload capability.
)
.. Docket No. 50-278 AttIchment to ,
. Monthly Operating !
Report for December 1995 Page 3
(
l
! UNIT 3 CORRECTIONS - AUGUST 1995 Reoorted Corrected l Number of Hours Reactor Was Critical 717 742
. Qf.lT 3 CORRECTIONS - OCTOBER 196.)
Reoorted Corrected {
Number of Hours Reactor Was Critical 360 388 l
l
QVERQGE DAILY UNIT POWEQ LEVEL f; DOCKET NO. 50 - 277 .
UNIT PEACH BOTT0tt UNIT 2 -
DATE JANUARY 15.1996 ?
COMPANY PECO ENERGY COMPANY
, L. P. HYDRICK 2- BUSINESS SERVICES SITE SUPPORT DIVISION
- PEACH BOTT0el ATOMIC POWER STATION [
TELEPHONE (717) 456-4383 ,
- l A
MONTH DECEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET)
- 1 617 17 1122 ,
2 0 18 1130 3 0 19 1105
- i 4 0 20 1125- .
5 0 21 1117 t i
S 0 22 1121 7 0 23 1125 8 73 24 1121 9 587 25 1121 10 1093 26 1125 11 1116 27 1120 12 1120 28 1124 13 1120 29 1124 14 1116 30 1120 15 1105 31 1124 ,
16 1118
L
~'QVECAGE DAILY UNIT POWEQ' LEVEL.
DOCKET NO. 50 -'278 UNIT PEACH BOTTOM UNIT 3
- DATE JANUARY 15,1996 l
't COMPANY PECO ENERGY COMPANY
- I L. P. HYDRICK ,
BUSINESS SERVICES ';
SITE SUPPORT DIVISION ;
PEACH BOTTOS ATOMIC POWER STATION .
TELEPHONS-(717) 456-4383 MONTH DECEMBER 1995 OAV AVERAGE DAILY POWER LEVEL. DAY AVERAGE DAILY POWER LEVEL I (MWE-MET) (MWE-NET) I r
1 1132 17 1122' I i
2 55 18 1130 $
3 0 19 111%
4 0 20 113?
5 0 21 1122 i 6 194- 22 1118 7 651 23 1126 8 1084 24 1122 1-t 9 1114 25 1122 -[,
! 10 1126 26 1126 ,
t 11 1126 27 1122 12 1126 28 1122 13 1126 29 1126 14 1121 30 1122 '
r 15 1130 31 -1126 i I'
- 16 1122 f
i l
. _.. ,. - ._ . . . _ . . . , . _ _ . . _ . . - - . , . _ . . - , . - . _ - . . . . _ . _ . . . . . . . _ _ . _ , . -_ _ . , ~ . = _ , _ . . - _ _ _ _ . .
1 OPERATING DOTA CEPORT DOCKET NO. 50 - 277 DATE JANUARY 15.1996 -
r COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK '
BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS ,
' UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIOD: DECEMBER, 1995
- 3. LICENSED THERMAL POWER (MWT): 3458 4 NAMEPLATE RATING (GROSS MWE): 1221 i
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1119
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093 [
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE i
- 11. HOURS IN REPORTING PERIOD 744 8.760 188.400 *
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 616.4 8.632.4 122.595.5 f
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 {
14 HOURS GENERATOR ON-LINE 582.0 8.598.0 118.601.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1.925.758 29.255.160 357.576.043 6
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 638.0bb 9.660.400 117.539.790
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) '19.794 9.363.439 112.805.895 {
PAGE 1 OF 2 [
t h
b P
b
- . . . , ,m . , -o - , . . ,,- .,._4. -,--. - e ,
~
OPERATING DATA ItEPORT'(CONTINUED) DOCKET NO. 50 -'277 DATE JANUARY 15.1996 THIS MONTH YR-TO-DATE CUMULATIVE .
- 19. UNIT SERVICE FACTOR 78.2 98.2 63.0 2n. UNIT AVAILABILITY FACTOR 78.2 98.2 .63.0
, 21. UNIT CAPACITY FACTOR (USING MDC NET) 76.2 97.8 -56.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 74.4 95.5 56.0'
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 12.3 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY O2/16/73 INITIAL ELECTRICITY O2/18/74 COMMERCIAL OPERATION 07/05/74 i i
l i
PAGE 2 OF 2 t
l d..___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ . _. - - _ . . . _ , . _ . , _ _ _ . _ _ . . _ _ - - , _ _ _ . _ _ _ . _ _ _ . -
OPERATING DAVA REPORV DOCKET NO. 50 - 278 DATE JANUARY 15.1996 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 l NOTES:
- 2. REPORTING PERIOD: DECEMBER. 1995
- 3. LICENSED THERMAL POWER (MWT): 3458 4 NAMEPLATE RATING (GROSS MWE): 1221
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1119
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
- 7. MAXIMUM DEPENDABLE CAPACITY (HET MWE): 1093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): ;
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE ;
- 11. HOURS IN REPORTING PERIOD 744 8.760 184.296
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 676.3 7.974.8 121.234.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 645.0 7.929.0 117.808.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.143.630 23.112.515 349.686.458
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 713.900 7.473.400 114.619.432-
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 694.293 7.172.493 110.013.852 PAGE 1 OF 2 s
- - - . . - _ - . . - . - - _ - - . - . - . . _ _ = _ _ _ _ _ - _ - _ - -
l I
OPERQTING DQTA CEPORT (CONTINUED) DOCKET NO. 50 - 278 DATE JANUARY 15.1996 l
THIS MONTH YR-TO-DATE CUMULATIVE ,
- 19. UNIT SERVICE FACTOR 86.7 90.5 63.9
- 20. UNIT AVAILABILITY FACTOR 86.7 90.5 63.9 -i 21 UNIT CAPACITV FACTOR (USING MDC NET) 85.4 78.0 57.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 83.4 76.0. 56.0
- 23. UNIT FORCED OUTAGE RATE 13.3 3.1 11.1 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A i
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED 5 INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 ,
i i
[
L PAGE 2 OF 2 [
F t
_ - . _ , - - _ - - - as- -umr,aa.m._-em--_u-_-----.a. --------u--m---,---a--_ - - - - - - , . m---s _ - _ _ _ - uw --_.--a_ _ m.s. - --,,-__-w_-- -__ - _ _ - , - - - - , - - - - . ----_ - _ _ _ _ _ _ _ . _
UNIT SHUTDOWN 3 AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT MAME PEACH BOTTOM UNIT 2 DATE JANUARY 15.1996 REPORT MONTH DECEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 4b6-4383' METHOD OF LICENSEE SYSTEM COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE l ACTION TO .
NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT * (4) (5) l PREVENT RECURRENCE !
i F
10 951201 S 162.0 B 1 ZZ ZZZZZZ PLANNED MAINTENANCE OUTAGE I 162.0 ,
e (1) (2) (3) (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS l S - SCHELULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA -
B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE I C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) i D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161) i E - OPERATOR TRAINING + LICENSE EXAMINATION r F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
- H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE I l
5
___-____-____-. - --=_ - ___ _ _- -__ _ _____-________ _ __- _______-- _ _-___- - - ______ ___- _. . _ - - _ _ - . . - . .- .- --
~ .
B 9
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 ,
UNIT HAME PEACH BOTTOM UNIT 3 DATE JANUARY 15.1996 REPORT MONTH DECEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 15 951202 F 99.0 H 3 HA TURBIN AUTOMATIC SCRAM - TURBINE TRIP 99.0 (1) (2) (3) (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE r
- __ . . . . . . . . . -