Monthly Operating Repts for Dec 1995 for Pbaps,Units 2 & 3
ML20096F415
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/31/1995
From: Hydrick L
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20096F404 List:
References
NUDOCS 9601230376
Download: ML20096F415 (14)


Text

- - - . - . . . _ . - -- - .- .

. ,, PEACH BOTTOM ATOMIC POWER STATION ,

NRC MONTHLY OPERATIONS

SUMMARY

l December 1995 l

UNIT 2 i

l Unit 2 shut down on December 1 for a planned maintenance outage. Major work activities included repairs to the "A" condensate pump, the "A" reactor feed pump, the "5B" feedwater heater, and a main steam relief valve. The unit was retumed to service on December 8. The unit operated at 100%

power for the rest of the month except for a load drop for a rod pattern adjustment made on December 14.

l UNIT 3  ;

Unit 3 began the month of December at 100% power. Unit 3 automatically scrammed on December 2 as a result of a main turbine trip. The unit was returned to service on December 6 and operated at 100% power for the rest of the month.

l 1

J l

I 9601230376 960115 PDR ADOCK 05000277 R PDR

i

. ,, Att2chment to Monthly Operating

. Report for December 1995 UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 15,1996.

3. Scheduled date for restart following refueling:

Restart following refueling forecast for October 20,1996.

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A

6. Important Ilcensing considerations associated with refuel!ng, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:  !

N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool-(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods 1

Docket No. 50-277 Att:chment to

. Monthly Operating Report for December 1995 Page 2 UNIT 2 REFUELING INFORMATION (Continued)

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2004 without full core offload capability.

September 1998 with full core offload capability.

1 l

1 l

. ,, Docket No. 50-278 Attachment to

. Monthly Operating Report for December 1995 UNIT 3 REFUELING INFORMATION i

1. Name of facility:

Peach Bottom Unit 3 I

Scheduled date for next refueling shutdown:

2.

Reload 11 scheduled for September 15,1997

3. Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1997
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be? l l

5. Scheduled date(s) for submitting proposed licensing action and supporting information. i l

l

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or l supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies '

(b) Fuel Pool- 2201 Fuel Assemblies,6 Fuel Rods  :

I

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: j The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. ,

l i

. . Docket No. 50-278 Attachment to

. Monthly Operating Report for December 1995 Page 2 UNIT 3 REFUELING INFORMATION (Continued)

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability.

)

.. Docket No. 50-278 AttIchment to ,

. Monthly Operating  !

Report for December 1995 Page 3

(

l

! UNIT 3 CORRECTIONS - AUGUST 1995 Reoorted Corrected l Number of Hours Reactor Was Critical 717 742

. Qf.lT 3 CORRECTIONS - OCTOBER 196.)

Reoorted Corrected {

Number of Hours Reactor Was Critical 360 388 l

l

QVERQGE DAILY UNIT POWEQ LEVEL f; DOCKET NO. 50 - 277 .

UNIT PEACH BOTT0tt UNIT 2 -

DATE JANUARY 15.1996  ?

COMPANY PECO ENERGY COMPANY

, L. P. HYDRICK 2- BUSINESS SERVICES SITE SUPPORT DIVISION

  • PEACH BOTT0el ATOMIC POWER STATION [

TELEPHONE (717) 456-4383 ,

  • l A

MONTH DECEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET)

  • 1 617 17 1122 ,

2 0 18 1130 3 0 19 1105

  • i 4 0 20 1125- .

5 0 21 1117 t i

S 0 22 1121 7 0 23 1125 8 73 24 1121 9 587 25 1121 10 1093 26 1125 11 1116 27 1120 12 1120 28 1124 13 1120 29 1124 14 1116 30 1120 15 1105 31 1124 ,

16 1118

L

~'QVECAGE DAILY UNIT POWEQ' LEVEL.

DOCKET NO. 50 -'278 UNIT PEACH BOTTOM UNIT 3

  • DATE JANUARY 15,1996 l

't COMPANY PECO ENERGY COMPANY

  • I L. P. HYDRICK ,

BUSINESS SERVICES ';

SITE SUPPORT DIVISION  ;

PEACH BOTTOS ATOMIC POWER STATION .

TELEPHONS-(717) 456-4383 MONTH DECEMBER 1995 OAV AVERAGE DAILY POWER LEVEL. DAY AVERAGE DAILY POWER LEVEL I (MWE-MET) (MWE-NET) I r

1 1132 17 1122' I i

2 55 18 1130 $

3 0 19 111%

4 0 20 113?

5 0 21 1122 i 6 194- 22 1118 7 651 23 1126 8 1084 24 1122 1-t 9 1114 25 1122 -[,

! 10 1126 26 1126 ,

t 11 1126 27 1122 12 1126 28 1122 13 1126 29 1126 14 1121 30 1122 '

r 15 1130 31 -1126 i I'

16 1122 f

i l

. _.. ,. - ._ . . . _ . . . , . _ _ . . _ . . - - . , . _ . . - , . - . _ - . . . . _ . _ . . . . . . . _ _ . _ , . -_ _ . , ~ . = _ , _ . . - _ _ _ _ . .

1 OPERATING DOTA CEPORT DOCKET NO. 50 - 277 DATE JANUARY 15.1996 -

r COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK '

BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS ,

' UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:

2. REPORTING PERIOD: DECEMBER, 1995
3. LICENSED THERMAL POWER (MWT): 3458 4 NAMEPLATE RATING (GROSS MWE): 1221 i
5. DESIGN ELECTRICAL RATING (NET MWE): 1119
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093 [
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD 744 8.760 188.400 *
12. NUMBER OF HOURS REACTOR WAS CRITICAL 616.4 8.632.4 122.595.5 f
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 {

14 HOURS GENERATOR ON-LINE 582.0 8.598.0 118.601.2

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1.925.758 29.255.160 357.576.043 6
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 638.0bb 9.660.400 117.539.790
18. NET ELECTRICAL ENERGY GENERATED (MWH) '19.794 9.363.439 112.805.895 {

PAGE 1 OF 2 [

t h

b P

b

- . . . , ,m . , -o - , . . ,,- .,._4. -,--. - e ,

~

OPERATING DATA ItEPORT'(CONTINUED) DOCKET NO. 50 -'277 DATE JANUARY 15.1996 THIS MONTH YR-TO-DATE CUMULATIVE .

19. UNIT SERVICE FACTOR 78.2 98.2 63.0 2n. UNIT AVAILABILITY FACTOR 78.2 98.2 .63.0

, 21. UNIT CAPACITY FACTOR (USING MDC NET) 76.2 97.8 -56.8

22. UNIT CAPACITY FACTOR (USING DER NET) 74.4 95.5 56.0'
23. UNIT FORCED OUTAGE RATE O.0 0.0 12.3 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY O2/16/73 INITIAL ELECTRICITY O2/18/74 COMMERCIAL OPERATION 07/05/74 i i

l i

PAGE 2 OF 2 t

l d..___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ . _. - - _ . . . _ , . _ . , _ _ _ . _ _ . . _ _ - - , _ _ _ . _ _ _ . _ _ _ . -

OPERATING DAVA REPORV DOCKET NO. 50 - 278 DATE JANUARY 15.1996 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 l NOTES:
2. REPORTING PERIOD: DECEMBER. 1995
3. LICENSED THERMAL POWER (MWT): 3458 4 NAMEPLATE RATING (GROSS MWE): 1221
5. DESIGN ELECTRICAL RATING (NET MWE): 1119
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (HET MWE): 1093
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):  ;
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE  ;

11. HOURS IN REPORTING PERIOD 744 8.760 184.296
12. NUMBER OF HOURS REACTOR WAS CRITICAL 676.3 7.974.8 121.234.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 645.0 7.929.0 117.808.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2.143.630 23.112.515 349.686.458
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 713.900 7.473.400 114.619.432-
18. NET ELECTRICAL ENERGY GENERATED (MWH) 694.293 7.172.493 110.013.852 PAGE 1 OF 2 s

- - - . . - _ - . . - . - - _ - - . - . - . . _ _ = _ _ _ _ _ - _ - _ - -

l I

OPERQTING DQTA CEPORT (CONTINUED) DOCKET NO. 50 - 278 DATE JANUARY 15.1996 l

THIS MONTH YR-TO-DATE CUMULATIVE ,

19. UNIT SERVICE FACTOR 86.7 90.5 63.9
20. UNIT AVAILABILITY FACTOR 86.7 90.5 63.9 -i 21 UNIT CAPACITV FACTOR (USING MDC NET) 85.4 78.0 57.6
22. UNIT CAPACITY FACTOR (USING DER NET) 83.4 76.0. 56.0
23. UNIT FORCED OUTAGE RATE 13.3 3.1 11.1 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A i
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED 5 INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 ,

i i

[

L PAGE 2 OF 2 [

F t

_ - . _ , - - _ - - - as- -umr,aa.m._-em--_u-_-----.a. --------u--m---,---a--_ - - - - - - , . m---s _ - _ _ _ - uw --_.--a_ _ m.s. - --,,-__-w_-- -__ - _ _ - , - - - - , - - - - . ----_ - _ _ _ _ _ _ _ . _

UNIT SHUTDOWN 3 AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT MAME PEACH BOTTOM UNIT 2 DATE JANUARY 15.1996 REPORT MONTH DECEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 4b6-4383' METHOD OF LICENSEE SYSTEM COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE l ACTION TO .

NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT * (4) (5) l PREVENT RECURRENCE  !

i F

10 951201 S 162.0 B 1 ZZ ZZZZZZ PLANNED MAINTENANCE OUTAGE I 162.0 ,

e (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS l S - SCHELULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA -

B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE I C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) i D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161) i E - OPERATOR TRAINING + LICENSE EXAMINATION r F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

  • H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE I l

5

___-____-____-. - --=_ - ___ _ _- -__ _ _____-________ _ __- _______-- _ _-___- - - ______ ___- _. . _ - - _ _ - . . - . .- .- --

~ .

B 9

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 ,

UNIT HAME PEACH BOTTOM UNIT 3 DATE JANUARY 15.1996 REPORT MONTH DECEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 15 951202 F 99.0 H 3 HA TURBIN AUTOMATIC SCRAM - TURBINE TRIP 99.0 (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE r

- __ . . . . . . . . . -