Monthly Operating Repts for Jan 1996 for PBAPS Units 2 & 3
ML20149K933
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/31/1996
From: Hydrick L, Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9602220379
Download: ML20149K933 (14)


Text

I Peach Gettrm AtImic Pow:r Station i*

=7 PECO ENERGY

N
=o**""

l Delta, PA 17314-9739 717 450 7014 l

February 15,1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of January 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, l

[ cita Gerald R. Rainey Vice President, Peach Bottom Atomic Power Station

)w/2 46IA GRR/ MEW /JGH:lph enclosures cc:

B.W. Gorman, Public Service E!ectric & Gas W.P. Domstfe, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, lil, Delmarva Power & Light INPO Records Center 9602220379 960131 PDR ADOCK 05000277 '

R PDR ccn 96-14011

/

l 220038

(

I e

PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

January 1996 l

UNIT 2 Unit 2 began the month of January at 100% power. A rod pattem adjustment was performed late on January 4. Power level was lowered to approximately 55%. The unit recovered to 100% early on January 6. Another rod pattern adjustment was performed on January 19. Power level was lowered to approximately 75% and returned to 100% that same day. On January 20 high river level and flow required a load drop to approximately 50% power. Power returned to 100% on January 22 and remined at that level for the rest of the month.

UNIT 3 Unit 3 began the month of January at 100% power. The unit operated at 100% power until January 20 when high river level and flow required a load drop to approximately 50% power. Power returned to 100% on January 22 and remained at that level for the rest of the month.

Attichment to Monthly Operating Report for January 1996 UNil' 2 REFUELING INFORIAATION 1.

Name of facility:

Peach Bottom Unit 2 2.

Schedeled date for next refueling shutdown:

Reload 11 scheduled for September 13,1996.

3.

Scheduled date for restart following refueling:

')

Restart following refueling forecast for October 20,1996.

4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

4 4

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing consideiations associated with reueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool 2436 Fuel Assemblies,59 Fuel Rods

w


A A.

J A..

Dock t No. 50-277 Attachment to Monthly Operating Report for January 1996 l

Page 2 UNIT 2 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2004 without full core offload capability.

September 1998 with full core offload capability.

l 4

t Docket No.' 50-278 Attachm nt to Monthly Operating Report for January 1996.

UNIT 3 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 15,1997 3.

Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1997 4

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies,6 Fuel Rods l

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

. = =.

.. =__

5 Docket No. 50-278 Attachm:nt to I

Monthly Operating Report for January 1996 Page 2 4

UNIT 3 REFUELING INFORMATION (Continued) 1 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability.

4 4

Y i

6 9

I I

i l

4

~ -. - -

,. - ~...

. a.

' AVEOQGE DAILY UNIT POWER.LEUEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE FEBRUARY 15.1996 COMPANY PECO ENERGY COMPANY L.

P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 MONTH JANUARY 1996 DAV AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.

t (MWE-NET)

(MWE-NET) 1 1120 17 1103 2

1116 18 1119 3

1128 19 1002 4

1095 20 944 5

933 21 531 6

1120 22 738 7

1124 23 1086 1t 8

1124 24 1106 f

9 1132 25 1094 i

10 1112 26 1116 l

l 11 1128 27 1123 12 1120 28 1115 13 1124 29 1119 14 1124 30 1119 15 1115 31 1123 16 1135 I

.., ~. -., ~....

.r r.

-..--4..,-.-sm,,,.-

--.-.. ~., -,..--. -,.. - - _. _ _ -_- _. ____

..m

.m_

....m m.

_1

~......

OVECDCE DQILY UNIT POWEQ LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTToet UNIT 3 DATE FEBRUARY 15.1996 COMPANY PECO ENERGY COMPANY L.

P. HYDRICK i

BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOsa AT0eIIC POWER STATION TELEPHONE (717) 456-4383 IIONTH JANUARY 1996 r

i DAY AVERAGE DAILY POWER LEVEL DAV AVERAGE DAILY POWER LEVEL'

[

(IfwE-NET)

(IIWE-NET) 1 1122 17 1109

+

s 2

1118 18 1126 3

1126 19 1122 i

4 1172 20 985 t

i 5

1122 21 543 6

1126 22 973

[

7 1122 23 1112 i

8 1127 24 1120 I

9 1130 25 1124 T

10 1114 26 1097 l

11 1126 27 1126 12 1122 28 1118

?

13 1121 29 1122 14 1126 30 1118 15 1117 31 1122

)

16 1137

~.

I OPERATING DQTO REPORT DOCKET NO. 50 - 277 DATE FEBRUARY 15.1996 COMPLETED BY PECO ENERGY COMPANY L.

P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
2. REPORTING PERIOD:

JANUARY. 1996

3. LICENSED THERMAL POWER (MWT):

3458 4 NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (HET MWE):

1119

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (HET WWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH VR-TO-DATE CUMULATIVE

11. HCURS IN REPORTING PERIOD 744 744 189.144
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 123.339.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 744.0 119.345.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2.463.847 2.463.847 360.039.890
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 818.600 818.600 118.358.390
18. NET ELECTRICAL ENERGY GENERATED (MWH) 796.468 796.468 113.602.363 PAGE 1 OF 2

.~

~. _. - _ -. _ - _.., __ _ _ _ _ _ _-- _____-__ _ _ - - ___-

- _... _ _. = ~....-

..m

_s

+

OPERQTING DQTQ REPORT (CONTINUED)

DOCCET NO. 50 - 277 DATE FEBRUARY 15,1996 THIS MONTH VR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 63.1-
20. UNIT AVAILABILITY FACTOR 100.0 100.0 63.1 21'. UNIT CAPACITY FACTOR (USING MDC NET) 97.9 97.9 56.9
22. UNIT CAPACITY FACTOR (USING DER NET) 95.7 95.7 56.1
23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TVPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 PAGE 2 OF 2

_ _ _ _ _ _ _ _ -,. ~. -..

- ~_ ~

~

o

.a OPERATING DQTO CEPORT DOCKET NO. 50 - 278 DATE FEBRUARY 15.1996 COMPLETED BY PECO ENERGY COMPANY.

L.

P.

HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
2. REPORTING PERIOD:

JANUARY. 1996

3. LICENSED THERMAL POWER (MWT):

3458 4 NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (NET MWE):

1119

6. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS HUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 744 185,040
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 121.978.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 744.0 744.0 118.552.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2.511,264 2.511.264 352,197,722
17. GROSS ELECTRICAL ENERGY GENERATED (WWH) 834.400 834,400 115.453,832
18. NET ELECTRICAL ENERGY GENERATED (MWH) 813,503 813.503 110.827,355 PAGE 1 OF 2

_.m.

_ _ = -. _.

_ ~ ~ -...

m.

i.___&

.... u. _. _ - < ~...

.t t

OPERATING DATA REPORT (CONTINUED)

DOCKET NO. 50 - 278 g

DATE FEBRUARY 15.1996 THIS asONTH YR-TO-DATE cut 00LATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 64.1
20. UNIT AVAILABILITY FACTOR 100.0 100.0.

64.1-

21. UNIT CAPACITY FACTOR (USING teDC NET) 100.0 100.0 57.8.

i

22. UNIT CAPACITY FACTOR (USING DER NET) 97.7 97.7 56.2
23. UNIT FORCED OUTAGE RATE O.0 0.0 11.0 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS.(TYPE. DATE. AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COeW8ERCIAL OPERATION):'

FORECAST ACHIEVED i

INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74

't Coma 4ERCIAL OPERATION 12/23/74 3

1 I

PAGE 2 OF 2 i

..-s

......s-

_m..

o D

r UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 s

UNIT NAME PEACH BOTTOM UNIT 2 DATE FEBRUARY 15,1996 REPORT MONTH JANUARY, 1996 COEPLETED BV PECO ENERGY COMPANY L.

P.

HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE l

'1 960120 F

34.0 H l 4

ZZ ZZZZZZ REDUCED POWER DUE TO HIGH l

RIVER LEVEL AND FLOW l

34.0 l

i l

(1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTDMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

('

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE l

.m

. g t

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE FEBRUARY 15.1996 s,

REPORT MONTH JANUARY. 1996 COMPLETED BY PECO ENERGY COMPANY L.

P.

HYDRICK BUSINESS SERVICES SITE SUPPOR7 DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT *

(4)

(5)

PREVENT RECURRENCE I

1 960104 S

30.0 H

4 ZZ ZZZZZZ ROD PATTERN ADJUSTMENT REACTOR NOT SHUT DOWN 3

960119 5

10.0 H

4 ZZ ZZZZZZ ROD PATTERN ADJUSTMENT REACTOR NOT SHUT DOWN 3

960120 F

34.0 H

4 ZZ ZZZZZZ REDUCED POWER DUE TO HIGH i

RIVER LEVEL AND FLOW REACTOR NOT SHUT DOWN 74.0 (1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE 1