+$b.

PECO NUCLEAR ncm,~ c- ,

1848Laynaad A Unit of PECO Energy twta #A 17314 90n 717 4 % 7 014 September 4,1997 l U S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 t

Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of August 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4, Sincerely, yl %

Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM.Lme Enclosures cc: W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas /- l I W P. Domsife, Commonwealth of Pennsylvania ' }'

p (

R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident Inspector T. M. Messbk, Atlantic Electric A F. Kirby, Ill, Delmarva Power & Ught INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station 9709220164 970031 PDR ADOCK 05000277 R PDR

\\'\\\\!D \\\\\f\\)tgI!!\\\

, Peach Bottom Atomic Power Station Unit 2 August 1 through August 31,1997 Matrative Summerv of Ooeratina Exceriences Unit 2 began the month of August at a nominal 100% of rated thermal power (RTP).

On August 8,1997 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, power was reduced to 80% of RTP for a rod pattern adjustment. Power was restored to 100% RTP on August 9,1997 at 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.

On August 29,1997 at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, power was reduced to 90% of RTP due to 2D Condensate Domin failure. Power was restored to 100% RTP on August 30,1997 at 600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />.

Unit 2 onded this month operating at 100% RTP.

l J

1 .

!* Attachment to Monthly Operating Report for August 1997 UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

Reload 12 is scheduled for October 2,1998.

3. Scheduled date for restart following refueling:

Restart following refueling forecast for October 30,1998. -

4. Wlli refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

N/A

5. Scheduled date(s) for submitting proposed licensing action and supporting information:
6. Important licensing considerations associated with refueling, e g., new or different fuel design or supplier, unreviewad design or performance analysis methods, signincant changes in fuel design, new operating procedures:
7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool; (a) Core 764 Fuel Assemblies (b) Fuel Pool 2720 Fuct Assemblies,52 Fuel Rods

Docket No. 50 877 Attachment to

_ Monthly Operating Report for August 1997 Page 2 l

l l _

UNIT 2 REFUE(ING INFORMATION (Continued)

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assembles:

The spent fuel pool storage capocrty has been relicensed for 3819 fue! assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

. September 2002 without full core offload capability.

September 1998 with full core offload capability.

l

' AVERAGE DAILY POWER LEVEL DOCKETNo. 50-277 -

UNIT PEACH BOTTOM UNIT 2 DATE SEPTEMBER 8.1997 COMPANY PECO ENERGY COMPANY L P.HYDRICK -

  • BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOneC POWER STATION
  • TELEPHONE (717)N MONTH AUGUST,1997 i

DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE CA!LY POVER LEVEL (MWE-NET) (WWEWET) 4 1 1100 17 1095 t 2 1100 15 1t03  !

i

' I 3 1108 19 1104 f 4 1104 20 1107  !

5 1112 21 1104 f'

i j 6 1100 22 1108 {

i .

g 7 1108 23 1t04 e l 1

  • i 8 1096 24 1108 '

I  !

9 1080 25 1108  ;

1  !

10 1108 25 1102 j i.

i 11 1103 27 1112 t 12 1104 28 1107 4

l t 13 1103 29 1067 '

. 14 1098 30 1067 i

15 1103 31 1108 i

l 16 1103 '

i i

)

)

i "

I i i

f .

OPERATING DATA REPORT

  • 5 .

DOCKET NO. 50-277 DATE SEPTEMBER 8.1997 'I COMPLETED BY PECO ENERGY COMPANY -

  • L P. HYDRICK BUStNESS SERVICES SITE SUPPORT DTV!SION PEACH BOTTOM ATOMIC POWER STATION
TELEPHONE (717) 456-4383 O_ PERATING STATUS
1. UNIT NAME' _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _P_EA_ C_ H_ B_ O_ T_T_O_M_U_N_IT_ 2_
2. REPORTING PERIOD: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , , , , _ _ _ _ _ _ _ _ _ _ _ _ _ AUGUST,1997
3. UCENSED THERMAL POWER (EvT):,,,_ ,,,,___ ,,,,__ ,,,_____ ,_ ,,,_345_8 4_ NAMEPLATE RATING (GROSS MVE): , ,_ , ,,,,_ ,,________ ,,,,___ , ,,__1221_

S. DESIGN ELECTRICAL RATING (NET MWE): _____________ ,,,_____ ,,__ ,11_19

6. MAXIMUM DEPENDABLE CAPACITY (GROSS EVE): ___________________ ,,1159
7. MAX MUM DEPENDABLE CAPACITY (NET MWE): _______,______ ____ ,,__1_093

, 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT. GIVE REASONS.

i

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET EVE):
10. REASONS FOR RESTR:CTIONS.IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE f 91. HOURS IN REPORTING PERIOD 744 5.831 203.015 1

'l 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744 0 5,831.0 136,746 5

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 00 00 14 HOURS GENERATOR ON-LINE 7440 5.83t.0 132,608 2
95. UNIT RESERVE SHUTDOWN HOURS 0.0 00 00
16. GROSS THERMAL ENERGY GENERATED (MWH) 2.563.219 19.929,662 401.905.242
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 841,300 6,608.700 132,078290
18. NET ELECTRICAL ENERGY GENERATED (MWH) 819248 6,443,691 125.907,143 PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED) .

DOCKET NO. 50 m l

~ '

DATE SEPTEMBER B.1997 THIS MONTH YR.TO-DATE CULC ATnE

19. UNIT SERVICE FACTOR 100.0 % 100.0 % ES_3 %

20 UNIT AVAlt.AB1UTY FACTOR 100 0 % 100 0 % C5.3 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 100.7 % 101.1 % 53 C %
22. UNIT CAPACITY FACTOR (USING DER NET) 98 4 % 95 7 % f/J 1 %
23. UNIT FORCED OUTAGE RATE .0 % _0 % 11.2 %
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACHy
25. IF SHUTDCW/N AT THd END OF REPORT PERIOD. ESTR%TED DATE OF STARTUP-

^

26. UNITS IN TEST STATUS (PR OR TO COfatERCIAL OPERATIONS): FORECAST ACH OTD tNtTat CamCAUTY OM673 INITIAL ELECTRICITY CM &74 COWKRCIAL OPERATION 07C574 PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-277 -

UNIT NAME PEACH BOTTOM UMT 2 DATE SEPTEMBER 8,1997 COMPLETED BY PECO EhERGY COMPANY , .

L P. MYDRICK BUSINESS SERMCES SITE SUPPORT DivtSION PEACH BOTTOM ATOM!C PCPATR STAT!ON -

REPORT MONTH AUGUST.1997 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTr4 TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTsON TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORTS (4) (5) PREVENT RECURRENCE I

6 970829 F O.0 A 4 HG DEMINX 2D CONDENSATE DEMIN FAILED (power reduchon) duraban shoum crdy for shtedowns TOTAL HOURS 00 l

i

)

8 i

i I

J l

(1) (2) ($ (4)

F-FORCED REASON METHOD S - SCHEDULED EXHIBIT G -INSTRUCTIONS A - EQUtPMENT FAILURE (EXPtAIN) 1 - MANUAL FOR PREPARAT!ON OF DATA B -MAINTENANCE OR TEST i 2 MANUALSCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3- AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTR:CTION 4 - OTHER (EXPLAIN) FILE (NUREG4161)

E - OPERATOR TRAINING + UCENSE EXAMINATION F- ADMINtSTRATIVE (5)

G- OPERA HONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H -OTHER (EXPLAIN)

' Peach Bottom Atomic Power Station Unit 3 August 1 through August 31,1997 Narrative Summarv of Operatina Exoeriences Unit 3 began the month of August at a nominal 84% of rated thermal power (RTP) due to coastdown.

On August 4,1997 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, power was reduced to 80% of RTP to place the 4"'

Feedwater Heaters back in service. On August 5,1997 power was further reduced to 62%

to investigate the #4 control valve problem. Power was restored to 83% on August 6,1997 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.

On August 10,1997 at 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, power was reduced to 77% of RTP because 3C Reactor Feed Pump was removed from service for maintenance. Power was restored to 80% on August 11,1997 at 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.

On August 15,1997 at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, power was reduced to 76% of RTP because 3A Reactor Feed Pump was removed from service for maintenance. Power was restored to 78% on August 16,1997 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />.

On August 21,1997 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, power was reduced to 74% of RTP because 3B Reactor Feed Pump was removed from service. Power was then restored to 76% on August 21, 1997 at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />.

On August 29,1997 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, power was reduced to 71 % of RTP for MSIV closure timing. Power was restored at 73% on August 30,1997 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />.

Throughout the entire month of August the unit continued coastdown. Unit 3 ended the month operating at 73% of RTP.

Docket No. 50-278 Attachment to Monthly Operating Report for August 1997 UNIT 3 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for October 3,1997 l

3. Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997
4. Will refueling or resumption of operation thereafter require a techncal specification change or other license amendment?

Yes.

I If answer is yes, what, in general, will these be?

1. Wide Range Neutron Monitoring Modification 5395.
2. Large Primary Containment Purge and Vent isolation Valve Boot Seal Replacement Frequency Change.
3. ECCS/EDG Shutdown Specification Change.
4. Cycle 12 Safety Limit MCPR Technical Specification Change.

S. ECCS Suction Strainer Mod (Determined to be an Unreviewed Safety Question (USQ))

5. Allitems have bem submitted.
6. Important licensing considerations associated with refueling, e g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool (a) Core 764 Fuel Assemblies (b) Fuel Pool 2777 Fuel Assemblies,16 Fuel Rods (202 new 3R11 bundles)
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that h6s been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been reticensed for 3819 fuel assemblies-

Docket No. 50 278 Attachment to Monthly Operating

! Report for August 1997 Page 2 UNIT 3 REFUELING INFORMATl0N (Continued) l 1

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability.

l i

_ =

l r

l

DOCKETNO 50-278 .

UNIT PEACH BOTTOM UNrT 3 DATE SEPTEMBER 8,1997 ~

COMPANY PECO ENERGYCOMPANY ,

L P. HYDRICK BUSWESS SER' ACES StTE SUPPORT DMS3ON PEACH BOTTOM ATOMIC POWER STATION

  • TELEPHONE (717)456-4353 MONTH AUGUST.1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) MVE-NET) 1 851 17 788 c

2 845 18 780 ,

3 851 19 784 4 809 20 779 5 810 21 772 6 82S 22 772 7 838 23 768 8 826 24 768 9 82S 25 759 10 805 26 754 11 817 27 755 12 813 25 754 13 809 29 743

  • 14 799 30 743 15 788 31 739 16 772

OPERATING DATA REPORT .

DOCKET NO. 50-278 DATE SEPTEMBER 8.1997 COMPLETED BY PECO ENTRGY COMPANY .

=

L P. HYDRfCK BUSWESS SERVfCES SITE SUPPORTDrm PEACH BOTTOM ATOMIC PCWER STAT.ON TELEPHONE (717) N OPERATING STATUS

1. UN!T NAME _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _P_EA_ C_ H_ B_ O_ T_T_C_M_U_N_IT_ 3_
2. REPORTING PERIOD: , , , , , , , , _ _ , _ , , , , , _ _ _ , , , , , , , _ _ , _ , , AUGUST,1,997 3_ UCENSED THERMAL POWERg JTy , _ , _ _ _ _ _ , , _ _ _ _ _ _ _ , , _ _ _ _ , ,, , _ , _3458
4. NAMEPLATE RAT!NG(GROSS EVE): ,,,___ ,____ , ,_ ,,,,,,,,,_ ,_ ,_ ,_1221 S. DESIGN ELECTRICAL RATING (NET MNET. _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,, _ _ _11,19
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWEy _____ ,,,,,__ ,,,_ ,,,,_1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWEr , _ _ _ _ _ _ , _ _ , _ , , , , , , , , _ , ,1093
6. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE JST REPORT, GET REASONS:
9. POWER LEVEL TO WHtCH RESTRfCTED.,IF ANY (NET MWE):
90. REASONS FOR RESTRICTIONS,IF At#:

Trfts MONTH YR_TCM) ATE CUPAAATr4

11. HOURS IN REPORTING PERIOD 744 5,831 198.911
12. NUMBER OF HOURS REACTOR WAS CRITICAt. 7440 S,771.5 135,753.8
13. REACTOR RESERVE SHUTDOWN HOURS OD 00 00 14 HOURS GENERA 10R ON-UNE 7440 5,759 0 132.194 2
15. UNIT RESERVE SHUTDOWN HOURS OO OO OO
16. GROSS THERMAL ENERGY GENERATED (WWH) 2.002.769 18,193.738 397,195.716
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 613,300 S 867.600 130.186,032 18 NET ELECTRICAL ENERGY GENERATED (ftNH) 589.011 S.633.336 725.t31.547 PAGE 1 OF 2 L

OPERATING DATA REPORT (CONTINUED) .,

DOCKET NO. S2 - 278 DATE StF 4 c74BER 8, t957 TS MONTH YR-TO CATE CUMLuTI'd

19. UN!T SERVICE cACTOR 100:0 % 98.8 % 66.5 %
20. UNIT AVAILABlUTY FACTOR 100D % 98.8 % 665 %

~

2t. UNIT CAPACITY FACTOR (USING MDC NET) 724.% 89 3 % 603 %

22. UNIT CAPACITY FACTOR (U$tNG DER NET) 70.7 % 873 % 58 7 %

23 UNIT FORCED OUTAGE RATE .0 % 12 % 10.1 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE. DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPGRT PERIOD. ESTNATED DATE OF STARTUR
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICAUTY 08M/74 INITIAL ELECTRICITY OSUt174 CONNERCIAL OPERATION 12374 6

PAGE2OF2

~

UNIT SHUTDOWNS A?O POWER REDUCTIONS DOCKETNO. 50-278  %

UNIT NAME PEACH BOTTOM UNTT 3 CATE SEPTEMBER 8.1997 COMPLETED BY PECO ENERGY COMPANY .

L P. HYDRICK

~

BUS: NESS SERVICES SITE SUPPORT DMSON PEACH BOTTOM ATOM:C PC'WER S~ATON REPORT MONTH AUGUST,1997 TELEPHONE (717)456-4383 METHOD OF LfCENSEE SYSTEM COMPONENT CAUSE AND CORRECTn/E TYPE DURATON REASON SHUTTING DOWN EVENT CODE CODE ACTON TG NO. DATE (1) (HOURS) (2) REACTOR (3) REPORTS (4) (5) PREVENT RECURRENCE 8 970804 F 00 H 4 HA VALVEX #4 CONTROL VALVE PROBLEM (power reduchon) duraban shown only for sh.

TOTAL HOURS 0.0 (1) (2) (3) (4)

F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S- SCHEDULED A-EQU!PMENT FAILURE (EXPLAN) 1 - MANUAL FOR PREPARATON OF DATA B -MAINTENANCE OR TEST 2. MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C - REFUEUNG 3 - AUTOMATO SCRAM EVENT REPORT (LER)

D- REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG4161)

E - OPERATOR TRAINtNG + UCENSE EXAMINATION F- ADMIN:STRATIVE (5)

G-OPERATIONAL ERROR (EXPLAIN) EXHtBITI- SAME SOURCE H - OTHER (EXPLAIN) ,

L __. . . . . . . . . . . . .