Peach Bottom Attmic Powir Stitlan w

'PECO NUCLEAR nor~mvc - v 1848 Lay Road A Unit of PECO Energy Delta. FA 17314-s032 717 456 7014 i

1 March 7,1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of February 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, taa' E e-Mark E. Wamer Director, Site Engineering Peach Bottom Atomic Power Station J66 MEW /JGH:lph Enclosures cc:

W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector J. A. Isabella, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station l

ccn 97-14014 9703180018 970220 PDR ADOCK 05000277 R

PDRa uppspps,spps

=

PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

FEBRUARY 1997 UNIT 2 i

Unit 2 ran at 100% power for the entire month, f

Unit 2 Net Generation for February was 756,991 MWH.

UNIT 3 Unit 3 began the month at 75% power due to a planned rod pattem adjustment. The rod pattern adjustment was completed on 2/2/97. The unit ran at 100% MWth for the remainder of the month.

Unit 3 Net Generation for February was 739,771 MWH.

3 i

i l

l 1

Attachment to Monthly Operating Report for February 1997 i

UNIT 2 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

2 Reload 12 is scheduled for September 15,1998.

3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 10,1998.

4.

Will refueling or resumption of operation therefore require a technical specification change or i

otherlicense amendment?

N/A If answer is yes, what, in general, will these be?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting informatio1:

4 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

i 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods

Docktt No. 50-277 Attachment to Monthiy Operating Report for February 1997 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2002 without full core offload capability.

September 1998 with full core offload capability.

i

.~

- - ~ -

. -.... -. -.. - ~

~... -

Docket No. 50-278 Attachment to Monthly Operating Report for February 1997 UNIT 3 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 11 scheduled for October 3,1997 3.

Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 4.

Will refueling or resumpJon of operation thereafter require a technical specification change or otherlicense amendment?

Yes.

If answer is yes, what, in general, will these be?

1. Wide Range Neutron Monitoring Modification 5395.
2. Large Primary Containment Purge and Vent isolation Valve Boot Seal Replacement Frequency Change.-
3. ECCS/EDG Shutdown Specification Change.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

The first item has been submitted, including the response to an NRC RAl.

The other two items are planned to be submitted in April,1997.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

. The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

--- -........... ~.-... ~...

- _ -.~

l i

'i i

Docket No. 50-278 AttSchment to j

Monthly Operating Report for February 1997 i

i Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming j

the present capacity:

i j

September 2003 without full core offload capability.

September 1999 with full core offload capability.

i i

I

AVERAGE DAILY POWER LEVEL DOCKET NO. 50-277 UNIT PEACH BOTTOM UNIT 2 DATE MARCH 7,1997 COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSiON PEACH BOTTOM ATOMIC POWER STATION I

TELEPHONE (717)456-4383 MONTH FEBRUARY,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 1126 17 1126 2

1126 18 1126 3

1134 19 1122 4

1!38 20 1131 5

1110 21.

1122 6

1134 22 1127 7

1118 23 1130 8

1126 24 1118 9

1126 25 1126 10 1130 26 1135 11 1126 27 1122

[

12 1126 28 1131 13 1126 14 1130

,7 15 1126 t

16 1122 L

l

OPERATING DATA REPORT DOCKET NO. 50 -277 DATE MARCH 7,1997

^.

COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 4383 OPERATING STATUS

1. UNIT NAME-P...E.. A.. CH. B. O...T._T_O...M..._U. N..IT.. 2..
2. REPORTING PERIOD:

FEBRUARY,1997

3. UCENSED THERMAL POWER (MWT):
3458,
4. NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (NET MWE):

1119

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

_1159

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1093,
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 672 1,416 198,600
92. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 132,331.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 672.0 1,416.0 128,193.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,322,773 4,874,436 386,850,016
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 775,800 1,626,100 127,095,690
18. NET ELECTRICAL ENERGY GENERATED (MWH) 756,991 1,586,572 122.053,025 PAGE 1 OF 2

'?

r---

- r-

-~

,- ~

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.'

50 -277 DATE MARCH 7,1997

  • i

.t THIS MONTH YR-TO-DATE

' CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

100.0 %

64.5 %

20. UNIT AVAILABILITY FACTOR 100.0 %

100.0 %

64.5 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 103.1 %

. 102.5 %

58.1 %

22. UNIT CAPACITY FACTOR (USING DER NET) 100.7 %

100.1 %

572 %

l

23. UNIT FORCED OUTAGE RATE

.0 %

.0 %

11.5 %

L

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 7

INITIAL ELECTRICITY 02/1&74 COMMERCIAL OPERATION 07/05/74 t

f i

i i

t PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-217 UNIT NAME PEACH BOTTOM UNIT 2 DATE MARCH 7,1997 COMPLETED BY PECO ENERGY COMPANY I

L P. HYDR!CK BUSINESS SERVICES SITE SUPPORT DIV!SION i

PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH FEBRUARY,1997 TELEPHONE (717)456-4383 i

METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE TOTAL HOURS L

r i

?

I i

i

?

(1)

(2) _

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + UCENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)

AVERAGE DAILY POWER LEVEL DOCKET NO. 50 7 Q UNIT PEACH BOTTOM UNIT 3 DATE MARCH 7,1997 COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION

- PEACH BOTTOM ATOMIC POWER STATION i

TELEPHONE (717)456-4383 t

I MONTH FEBRUARY,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 810 17 1113

{

2 1097 18 1112 r

3 1116 19 1109 7

i.

4 1124 20 1117 5

1100 21 1109 6

1120 22 1113 t

7 1101 23 1120 8

-1114 24 1100 9

1113 25 1124 i'

10 1113 26 1108 11 1109 27 1108 12 1113 28 1113 13 1113 14 1112 15 1113 16 1108 t.

i

~...

b OPERATING DATA REPORT DOCKET NO. 50-2 3 DATE MARCH 7,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME-PEACH BOTTOM UNIT,3, NOTES:
2. REPORTING PERIOD:

FEBRUA_R.Y,1997,

3. UCENSED THERMAL POWER (MWT) 3458
4. NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (NET MWE):

1119

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1159,
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:

i

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

i i

THIS MONTH YR-TO-DATE CUMULATIVE

[

11. HOURS IN REPORTING PERIOD 672 1,416 194,496 i
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 131,396.3 1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-UNE 672.0 1,416.0
  • 27,851.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED WH) 2,300,606 4,871,880 383.873,858
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 759,100 1,612,600 125,931,032
98. NET ELECTRICAL ENERGY GENERATED (MWH) 739,771 1,571,581 121,010,122 PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

50-278 DATE MARCH 7,1997 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

100.0 %

65.7 %

20. UNIT AVAILABluTY FACTOR 100 0 %

100.0 %

65.7 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 100.7 %

101.5 %

59.8 %

22. UNIT CAPACITY FACTOR (USING DER NET) 98.4 %

99.2 %

58.1 %

23. UNIT FORCED OUTAGE RATE

.0 %

.0 %

10.4 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP;
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICAUTY 08/07/74 INITIAL ELECTR' CITY 09/01/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 DATE MARCH 7,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH FEBRUARY.1997 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 9

970201 S

0.0 H

4 RB CONROD ROD PATTERN ADJUSTMENT (power reduction)

Duration shown only for shut downs TOTAL HOURS 0.0 i

(1)

(2)

(3)

(4) l

[

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA i

B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION t

F-ADMINISTRATIVE (5) i G -OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE i

H - OTHER (EXPLAIN)

[

L